UPS5000-A-(200 kVA-800 kVA)
User Manual
Step 2 Connect signal cables to each UPS in the parallel system by referring to the section "Control
Unit."
----End
3.3.4 Connecting Power Cables (300K-FT, 400K, 500K, 600K, 800K)
Context
Procedure
Step 1 Ground each UPS in a parallel system separately, and connect power cables and battery cables
by referring to the section "Single UPS Installation."
Step 2 Choose a parallel mode and connect cables to the parallel system based on site requirements.
The typical scenario is used as an example.
Issue 03 (2019-02-15)
Figure 3-178 Connecting signal cables to a dual-bus system
Cables are connected in the same way for the 300K-FT, 400K, 500K, and 600K UPS. This section
describes how to connect cables for the 400K UPS.
Copyright © Huawei Technologies Co., Ltd.
3 Installation
206
Need help?
Do you have a question about the UPS5000-A-300K-STT and is the answer not in the manual?
Questions and answers