Download Print this page

Quilt EZ BUTLER Assembly Instructions Manual

Notling metal frame

Advertisement

Quick Links

Nolting Metal Frame
Assembly Instructions
Revision: 10/24/2016

Advertisement

loading
Need help?

Need help?

Do you have a question about the BUTLER and is the answer not in the manual?

Questions and answers

Summary of Contents for Quilt EZ BUTLER

  • Page 1 Nolting Metal Frame Assembly Instructions Revision: 10/24/2016...
  • Page 2 In order to accommodate all machine types we use universal parts bags, not all parts will be used in every installation. Bag # Contents Picture Vary by machine Cables 1-White belt (12’) 4 - Plastic belt clamps 4 - Screw (4-40 x 0.5) 1 - Black Belt (86”) 4 - Plastic Belt Clamps 4 - Screw (4-40 x 0.5)
  • Page 3 Bag # Contents Picture 1- Display bracket 2- Screw (M3 x 8mm) 2-Remote base 4- Screw (M6 x 8) 4- Nut (M6) 2- Poly disc 2- Screw (M3 x 8mm) 1- Rear idler bracket 1- Rear idler clamp 2- Screw (10-24 x 1/2”) 2- Fender washer (#10) 1- Pulley assembly 1-Carriage bracket...
  • Page 4 Install the Motor Box (Bag M6) Use the drill template on page 24 to drill two holes onto both arms on the front of the carriage. Attach the L-bracket onto the carriage with the provided screws with the head on the screw on the inside.
  • Page 5 Install the Rear Idler Pulley (Bag I6) Remove the clamp over the back left wheel. Set aside the screws for use in the next step. Attach the rear idler bracket using the screws removed in step 1. Page 5...
  • Page 6 Install the Carriage Bracket (Bag Y9) Take the machine off of the frame and remove the front axle. Reattach the front axle with the carriage bracket mounted in between the axle and the machine. Attach the belt bracket to the carriage bracket with the provided wing screw.
  • Page 7 Install the Black Belt (Bag Y1) Loop the black belt through the slot on the belt bracket with the teeth facing the machine. Secure with a belt clamp. Refer to Appendix A for details on how to use the belt clamps. Run the belt around the rear idler clockwise behind the carriage...
  • Page 8 Attach the remaining end of the belt to the to the eye bolt with a belt clamp. Tighten the eye bolt as needed to tighten the belt. It should have some play, but not a lot. Install the White Belt (Bag X10 and Bag X1) There are many different options to mount the clamp brackets to the...
  • Page 9 Attach the eye bolt to the clamp bracket facing in. Attach the white belt to the eye bolt using the belt clamps with the teeth facing up. Repeat for the other side. Release the tension on the motor box, by unlocking the belt tension lever on the top of the motor box.
  • Page 10 Connect Cables Connect the power cable Plug the power cable into the port on the motor box. Ensure that the cable is running towards the top of the motor box and not towards the ground. Run the cable along the carriage to the back of the machine, and then plug into the outlet or...
  • Page 11 For Standard Model Plug the Y- handlebar cable into the handle bar port of the black motor box. Run the handlebar cable along the base of the carriage to the back handlebars. *Image not representative of all machine types. Page 11...
  • Page 12 Disconnect the handlebar cable on the right rear handlebar. Take the split side of the Start/Stop wire, and connect into each port. The start stop wire will ‘T’ into the existing handlebar wire. Repeat on the left side for the Needle Up wire. If the machine handle- bar wires on only one side the needle up wire...
  • Page 13 Plug the network style cable into the “Remote” port on the motor box. Note: You will only have one of the cables pic- tured. Run the cable with the handlebar cable around the back of the machine up to the display.
  • Page 14 Connect the other end of the display cable into the display. Android cables will plug into the RJ45 network connection on the hub on the back of the tablet. Standard displays will plug into the slot on the bottom of the display.
  • Page 15 Run the handlebar cable along the base of the carriage to the back handlebars. Remove the front face- plate of the stitch regula- tor. Loosen the screw for the terminals labeled start, GND, and SS. Connect the ground (green) from both Needle Up and Start/Stop cables into the GND port.
  • Page 16 Plug the network style cable into the “Remote” port on the motor box. Note: You will only have one of the cables pic- tured. Run the cable with the handlebar cable around the back of the machine up to the display.
  • Page 17 Standard displays will plug into the slot on the bottom of the display. Continue to page 19 For PerfectStitch Plug the remaining end into the Stitcher Box port on Butler. Page 17...
  • Page 18 Run the cable along the carriage with the power cable to the control box and plug into the robotics port on the PCB. Use the provided anchors and zip-ties to secure the cables to the carriage. Make sure they are out of the way of any moving parts.
  • Page 19 Set Machine Type Important: If the machine has been upgraded to PerfectStitch, then the machine type is to be set to Default. Android Tablet Power on the display, go to Settings > Machine and set the machine type to Nolting. Standard Display Power on the display, go to Setup >...
  • Page 20 Motor Pulley Cover (Optional) Place cover onto two screws near the top motor box pulley. Pulley cover screws Pulley cover Tighten nuts onto top of screws to secure the Pulley cover. Nuts What is the Pulley Cover for? The Motor Pulley cover is an extra safety precaution to protect your fingers from...
  • Page 21 Appendix A - How to use Belt Clamps A belt clamp consists of two clamps and two screws. Using a Phillips screwdriver, insert each screw on opposite sides of the clamps and tighten halfway. Page 21...
  • Page 22 Thread the belt between the clamps, loop it around and reinsert it between the clamps. Align the belt teeth, then finish tightening the clamps. Page 22...
  • Page 23 Disengage belts for free motion In order to use free motion with the butler connected the belts will need to be disengaged. To disengage the x-belt, move the locking lever away from the edge of the motor box.
  • Page 24 Intentionally left Blank Page 24...
  • Page 25 Nolting Motor Box Drill Template Left Right Drill bit size: Drill bit size: Line up the side of the template with the front of the carriage rail. Page 25...
  • Page 27 Still need help? Visit support.quiltez.com for tutorial videos and additional help documentation...