Eagle Equipment MTP-9F Manual

9,000 lbs. capacity two-post symmetric lift (floor-plate)
Hide thumbs Also See for MTP-9F:

Advertisement

MTP-9F
(STD-9F)
9,000 LBS. CAPACITY
TWO-POST SYMMETRIC LIFT
(FLOOR-PLATE)
INSTALLATION
&
OPERATION
PANZITTA SALES & SERVICE
MANUAL
72 George Avenue
Wilkes-Barre, PA 18705
570-822-6720
800-822-6720
www.panzittasales.com
READ THIS MANUAL BEFORE INSTALLING OR OPERATING
THE LIFT
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MTP-9F and is the answer not in the manual?

Questions and answers

Summary of Contents for Eagle Equipment MTP-9F

  • Page 1 MTP-9F (STD-9F) 9,000 LBS. CAPACITY TWO-POST SYMMETRIC LIFT (FLOOR-PLATE) INSTALLATION & OPERATION PANZITTA SALES & SERVICE MANUAL 72 George Avenue Wilkes-Barre, PA 18705 570-822-6720 800-822-6720 www.panzittasales.com READ THIS MANUAL BEFORE INSTALLING OR OPERATING THE LIFT...
  • Page 2 All rights reserved. The user’s manual here can not be copied or backup in the name of company or in own name without the approval by the company. The manual is particularly designed for these series products in use and the company is never responsible for results since the manual is used for other equipment operation.
  • Page 3 PANZITTA SALES & SERVICE Cautions 72 George Avenue Wilkes-Barre, PA 18705 570-822-6720 800-822-6720 www.panzittasales.com Warning The manual is indispensable part of the product and please read it carefully. Please conserve the manual well for reference in overhaul. The machine here shall be only used for the purpose specified in design, never for others. The manufacturer never takes any responsibility for damage caused by misuse or other use.
  • Page 4 Use proper equipment, tools and safety protection facilities, such as, uniform, safety shoes and others. Please pay special attention to different safety identifiers on machine. It is forbidden to touch moving parts with hands or other parts when lifer is in operation. It is forbidden to remove safety device of the machine or makes it useless.
  • Page 5 Illustrations for Warning Signs (1) Please carefully read user’s manual and service (2)Never adjust safety pressure of manual. Hydraulic pump station of lifter (2) Provide proper maintenance and inspection for (4) Forbid operating damaged lifter safety operation (5) The lifer shall be only used by operator trained (6) Only authorized person can conduct operation in Lifter scope (7) Use hoist point designated for vehicle...
  • Page 6 (9) Auxiliary accessories may reduce load capacity (10) Peripheral regions shall be unblocked when Vehicle tilting may occur. (11) The vehicle must be located by tonnage in manual (12) There shall not be obstruction around lifter in hoist or falling. (13) Prevent vehicle from excessive swing in hoist (14) Never make lifter in auto-closing or controller beyond control...
  • Page 7: Table Of Contents

    Contents Chapter I: Overview and Features ..............8 Chapter II: Main Technical Parameters ...............9 Chapter III: Overall Dimension of Machine ............10 Chapter IV Machine Structure and Working Principle ........12 Chapter V Equipment Installation and Commissioning ........13 Chapter VI Safety Mechanism ................22 Chapter VII Hydraulic System................24 Chapter VIII Operating Instructions..............25 Chapter IX Care and Maintenance ..............27...
  • Page 8: Chapter I: Overview And Features

    Chapter I: Overview and Features 1.1 Description for machine model Machine name Description 3.5T(4.0T) Symmetric-arm lifter of Common double-column lifter(1) economical and practical type 4.0T Symmetric-arm lifter of Common large-scale gantry lifter(2) economical and practical type 4.0T Symmetric-arm lifter of Common small-scale gantry lifter(3) economical and practical type 4.0T Symmetric-arm lifter of...
  • Page 9: Chapter Ii: Main Technical Parameters

    moving to prevent vehicle tilting. F. Minimum hoist height is 110mm and it is applicable to maintenance of high-grade car. G. High load bearing chain, safe and reliable. H. 24V safety voltage control for electric series I. Imported hydraulic components in use. The company reserves the right to modify the products without further notice.
  • Page 10: Chapter Iii: Overall Dimension Of Machine

    PANZITTA SALES & SERVICE 72 George Avenue Wilkes-Barre, PA 18705 570-822-6720 800-822-6720 www.panzittasales.com Chapter III: Overall Dimension of Machine 3.1. Two post floor plate lift3.5T(4T) Maximum passing width 2576...
  • Page 11 PANZITTA SALES & SERVICE 72 George Avenue Wilkes-Barre, PA 18705 570-822-6720 800-822-6720 3.2. Two post clear floor lift 4.0T (outside connect) www.panzittasales.com...
  • Page 12: Chapter Iv Machine Structure And Working Principle

    PANZITTA SALES & SERVICE 72 George Avenue Wilkes-Barre, PA 18705 570-822-6720 800-822-6720 www.panzittasales.com Chapter IV Machine Structure and Working Principle The machine is mainly composed of main column, auxiliary column, slide, bracket arm, spindle part, safety device, oil cylinder, chain, dynamic unit, oil pipe, electric cabinet (electric cabinet is only for electric series) and wires.
  • Page 13: Chapter V Equipment Installation And Commissioning

    Driving principle of common lifter: Press “RISING” button, the contactor is power on, the motor is also power on and in operation, the motor drives oil pump, the hydraulic oil is input to lower cavity of oil cylinder through one-way valve and oil pipe, piston driven by oil pressure pushes oil cylinder to pass steel wire rope and rope wheel set and drags bracket arm for rising so as to complete hoist.
  • Page 14 Clean dust in hole Drill core Tighten nut with completely with dust regulation and depth screw with wrench remover or blowing shown in figure hammer pump PANZITTA SALES & SERVICE 72 George Avenue Wilkes-Barre, PA 18705 570-822-6720 800-822-6720 www.panzittasales.com...
  • Page 15 Expansion bolt installation diagram 2. The luminance shall not be lower than 1001X indoors. 3. Ensure installation position and dimension: Two post floor plate lift 4T installation position diagram PANZITTA SALES & SERVICE 72 George Avenue Wilkes-Barre, PA 18705 570-822-6720 800-822-6720 www.panzittasales.com...
  • Page 17 Erect both vertical columns (main column with motor mount, used for motor fixing), set pattern back plate in open middle, make both vertical columns on the same straight line, drill hole with impact drill hammer of electric hammer pinch ¢20 and fix both vertical columns with ten M18X160 expansion screws.
  • Page 18 PANZITTA SALES & SERVICE 72 George Avenue Wilkes-Barre, PA 18705 Upper rope wheel 570-822-6720 800-822-6720 Supporting plate Steel wire rope 2 www.panzittasales.com Supporting plate Slide Upper rope wheel Steel wire rope 2 Steel wire rope 1 Upper Lower rope wheel Slide Steel wire rope 2 Baseboard...
  • Page 19 column with four M8X35 hexagon bolts, then connect oil pipe, tighten them and avoid leakage. (See hydraulic system installation diagram). Chain wheel Pump station “RISING” button connector Chain wheel Manual unloading valve Auxiliary oil cylinder Main oil cylinder Pump station oil pipe Double-column oil pipe 135 connector connector...
  • Page 20 6. Fill hydraulic oil: Fill 46# or 20#wear-resistance hydraulic oil into oil tank (the user shall provide hydraulic oil), the maximum oil level shall be about 10mm from filling opening and minimum oil level shall be about 50mm from filling opening(the inspection shall be conducted with gage rod on filling air cover above oil tank ).
  • Page 21 · Electrical schematic diagram for two post floor Electrical schematic diagram for plate lift two post clear floor lift 10. Power on: the plug of power cord shall be inserted into preassembled power socket. Circuit breaker shall be installed in power supply. The power switch lights when the main switch installed in control cabinet is opened.
  • Page 22: Chapter Vi Safety Mechanism

    coated to observe whether lubricating grease is filled to guide surface of column and sliding block. If there is no lubricating grease, proper amount of lubricating grease can be filled. Meanwhile, lubricating grease or oil shall be applied to wheel and axle of upper and lower steel wire rope to reduce wear and prolong service life.
  • Page 23 mechanism locked in its safety. Only then, the vehicle maintenance can be carried out, otherwise, it is not allowed to conduct vehicle maintenance. Upon falling, we shall press down the “RISING” button at first, and then safety rope for two slides can be undrawn. Finally, the manual unloading valve shall be pressed down, and the lifter will descend.
  • Page 24: Chapter Vii Hydraulic System

    Chapter VII Hydraulic System Contour dimension of hydraulic pump station Details for hydraulic pump 1.Motor 2. Delivery connection 3. Oil inlet 4. Fuel tank 5. Oil filling pipe 6. Oil inlet 7. Oil filter 8. Valve body 9. Throttle valve for oil return 10.
  • Page 25: Chapter Viii Operating Instructions

    1. Filter. 2. Motor 3. Gear pump 4. One-way valve 5. Overflow valve 6. Descent velocity regulating valve 7. Electronic unloading valve (manual unloading valve) 8 throttle valve or explosion-proof valve 9. Main oil cylinder 10 Auxiliary oil cylinder Chapter VIII Operating Instructions 1.
  • Page 26 3.2 Pay attention to warning signs 3.3 Maintenance and care for lifters shall be undertaken by operators having been trained. Lubricating oil shall be applied to all axis of the machine for once a week via engine oil container. In addition, lubricating grease shall be applied to moving parts including safety rack and block and sliding for once a week.
  • Page 27: Chapter Ix Care And Maintenance

    steel wire rope shall be replaced in time. 3.5 The oil-way (such as oil cylinder, oil pipe and connector) shall be frequently observed. 3.6 Before leaving factory, the hydraulic valves have been well adjusted. Thus, users shall make every effort possible to voluntarily adjust; otherwise, all consequences shall be undertaken by users.
  • Page 28 accurate lubricating is performed. High-quality lubricating grease (lithium base grease (GB7324-87)) shall be used. clamp springs and other parts to check whether the connection is normal or tightened. Note: all foundation bolts shall be securely tightened. If some screws are damaged and do not work, the lifter shall be closed till the bolts are replaced.
  • Page 29: Chapter X Faults And Troubleshooting

    Chapter X Faults and Troubleshooting Fault Reasons Troubleshooting phenomenon 1. Inspect the circuit of button switch 2. Inspect the circuit of AC connector 1. There is wire break of button switch. 3. If the faults are eliminated after the 2. Short-circuit occurs in coil of AC terminals connecting limit switch is short Motor fails...
  • Page 30: Chapter Xi Encasement List

    Chapter XI Encasement List 1. Main column group 2. Auxiliary column group 3. Hydraulic dynamic unit 4. Accessories box 5. Long bracket arm and short bracket arm 2 for each, 4 in total 6. User’s manual 14. Guarantee card 1 (attached with user’s manual) 15.
  • Page 31 The guarantee card is important certificate for ultimate users in guarantee service. No card supplied for loss, please conserve it well. [Instructions for Guarantee] I. Guarantee period: The guarantee period lasts for 12months from the second day after machine purchase and invoice issuing.
  • Page 32 Note: The user shall clearly fill out return receipt of guarantee card, the guarantee procedure is handled within one month since the purchase date and the return receipt shall be mailed to our company; the guarantee card is never supplied for loss and it is invalid for arbitrary change. Product Product model...
  • Page 33: Warranty Information

    To the fullest extent allowed by law, Eagle Equipment shall not be liable for loss of use, inconvenience, lost time, commercial loss or other incidental or consequential damages Some States do not allow exclusion or limitation of consequential damages or how long an implied warranty lasts, so that the above limitations and exclusions may not apply.