Agilent 3070 / 79000 Board Test Systems Site Preparation June 2002...
Page 2
Acknowledgements, 2 direct, indirect, general, special, incidental or consequential damages in connection with the 3070 Series I DECLARATION OF CONFORMITY furnishing, performance, or use of this material. according to ISO/IEC Guide 22 and EN 45014, 3 U.S.
Page 4
3070 Series I DECLARATION OF CONFORMITY according to ISO/IEC Guide 22 and EN 45014 Manufacturer’s Name: Agilent Technologies, Inc. Manufacturing Test Division Manufacturer’s Address: 815 14th Street S.W. Loveland, Colorado 80537 Declares that the Product Name: 3070 (Series I) Board Test Systems...
Page 5
3070 Series II DECLARATION OF CONFORMITY according to ISO/IEC Guide 22 and EN 45014 Manufacturer’s Name: Agilent Technologies, Inc. Manufacturing Test Division Manufacturer’s Address: 815 14th Street S.W. Loveland, Colorado 80537 Declares that the Product Name: 3070 Series II Board Test Systems...
Page 6
3070 Series 3 DECLARATION OF CONFORMITY according to ISO/IEC Guide 22 and EN 45014 Manufacturer’s Name: Agilent Technologies, Inc. Manufacturing Test Division Manufacturer’s Address: 815 14th Street S.W. Loveland, Colorado 80537 Declares that the Product Name: 3070 Series 3 Board Test Systems...
Contents Agilent 3070 / 79000 Site Preparation 03066-90114 Rev. Z 05/2002 Site Preparation – Legal Notices .....................1 Site Preparation – Process The Importance of Site Preparation ..................... 1-2 Site Prep Manual Description ....................1-2 Responsibilities ........................... 1-3 Agilent ’s Responsibilities ..................... 1-3 Customer’s Responsibilities ....................
Page 14
Table of Contents System-Dependent Criteria....................3-2 The System Plan Drawing ......................3-3 What To Draw ........................3-3 Planning Aids......................... 3-3 Assigning Specialists ........................3-8 What Are Specialists?......................3-8 Site Coordinator ........................3-8 System Administrator ......................3-8 Structural Specialist ....................... 3-8 Environmental Specialist .......................
Page 15
Table of Contents Fixture Storage........................4-13 Site Preparation – Environmental Requirements Introduction..........................5-1 Air Quality Requirements ......................5-2 Introduction..........................5-2 Corrosive Contaminants ......................5-2 Particulate Contaminants ....................... 5-2 Viscid Contaminants......................5-2 Air Temperature Requirements ....................5-3 Introduction..........................5-3 Air Temperature Specifications ..................... 5-3 Cooling Requirements ......................
Page 17
Inventory The Shipment ......................9-2 Uncrating The System ......................... 9-3 Uncrating an Agilent 3070 Series I System................9-3 Uncrating an Agilent 3070 Series II/3 and Agilent 79000 System........9-8 Uncrating Procedure ......................9-8 Uncrating the Support Bay ....................9-12 Tools Needed to Uncrate the Support Bay: ................. 9-12 Uncrating Procedure: ......................
Page 18
E1099A PDU Electrical Requirements................10-114 E1170-80003 PDK Electrical Requirements ..............10-124 E1131A PDU Electrical Requirements................10-125 Agilent 3070 Series II / 3 - E1135A/B Power Distribution Units ........10-128 Connecting Mains Power To The System ................10-143 Introduction........................10-143 44964A/B AC Mains Connection..................10-144 E1099A AC Mains Connection ..................
Page 19
Table of Contents Who Should do the Current Reduction Conversion?............11-3 What to Do in Case of Difficulty..................11-3 Series 3 Current Reduction Conversion Procedure ..............11-4 Current Reduction Conversion Preview ................11-4 Schedule the Conversion ..................... 11-5 Determine the System Type and Power Option..............11-5 Shut Down the System......................
Agilent Requirements describes floor, access, and 3070 Series 3 or 79000 which was shipped prior storage requirements. to June 1999 to have the same power requirements as 3070 / 79000 systems shipped after June 1999.
CEs will bill up to 2 hours to Agilent the "Installation Visit" and the Agilent CE will bill Technologies. up to 4 hours to Agilent Technologies. ELECTRICAL and ENVIRONMENTAL WARRANTY The Agilent 3070 / 79000 family INSPECTION After primary power has been...
The main difference between the 3070 Series I and the 3070 Series II systems is the latter has twice the test pin capability, and in the Series II the controller is mounted in the testhead pod. The Series II systems also have redesigned testheads which include space for more equipment.
NFS mounted. If a Series-II system is added to a site with Series I systems, the two The controller for the 3070 Series I system is an HP systems can be networked to share resources.
In the 3070 Series II family system, the support bay is present in 307X systems but not in 317X systems. The support bay, when present, houses the DUT power supplies and optional test equipment.
Site Preparation – system on the system plan drawing. Figure 3-1 Structural Requirements for the exact dimensions of page 3-4 shows three layout suggestions for 3070 Series individual testheads and support bays. I system. Figure 3-2 on page 3-5 shows layout...
Page 43
Chapter 3: Site Preparation – Planning: The System Plan Drawing Figure 3-3 Recommended 3070 Series II system layouts Right-to-Left Layout Left-to-Right Layout Support 3 m (9 ft.) Testhead Support 3 m (9 ft.) Testhead Strip Printer Strip Printer Monitor &...
Page 44
Chapter 3: Site Preparation – Planning: The System Plan Drawing Figure 3-4 Recommended 3070 Series 3 system layouts Right-to-Left Layout Left-to-Right Layout Controller Controller Support 3 m (9 ft.) Support 3 m (9 ft.) Testhead Testhead Monitor & Strip Printer Monitor &...
Table 4-1 System weights System Type Product Weight 3070 Series I Testhead 370 kg (750 lb) Support Bay 205 kg (450 lb) Testhead and Support Bay on Pallet 725 kg (1600 lb) 307X Series I...
Quick Verify on pallet 150 kg (330 lb) Controllers 3070 - 300 Series Computer (in cabinet) 82 kg (180 lb) 3070 Series II - C110 Series Computer 15 kg (33 lb) Controllers – B180L 14 kg (36 lb) 3070 Series 3 and 79000...
Page 68
Chapter 6: Site Preparation – Power Requirements: Identifying Your System Figure 6-1 Rear views of 3070 Series I and Series II systems 317X Series I Testhead E1170-80003 PDK 307X Series I Testhead with Support Bay PDU #2 (Branch): E1135A or...
Page 69
Chapter 6: Site Preparation – Power Requirements: Identifying Your System Figure 6-2 Rear views of 3070 Series 3 and 79000 systems 317X Series 3 Testhead Port1 Port3 Port0 Port2 Mains Disconnect E1135B/C PDU (Main) 307X Series 3 Testhead with Support Bay...
Page 74
Chapter 6: Site Preparation – Power Requirements: Power Requirements Figure 6-4 3070 Series 3 - International 3-phase systems Site ac voltage source SO-Plug-International.wpg 2.5 m (8.2 ft) of 5x6mm SO cord, cord and male receptacle supplied by Agilent (E1135-61610) 30A / 3-Ph...
Page 75
Chapter 6: Site Preparation – Power Requirements: Power Requirements Figure 6-5 3070 Series 3 - North American 3-phase systems Site ac voltage source SO-Plug-NorthAmerica.wpg 2.5 m (8.2 ft) of #10 AWG 5 conductor SO Cord, cord and male receptacle supplied by Agilent...
Table 6-4 on page 6-13 directs you where to find wiring Diagrams diagrams in this chapter for 3070 Series 3 and 79000 testheads and E2197A xDSL / POTS bays. If you have a Series I or Series II system, refer to Chapter 10, Site Preparation –...
Page 78
Chapter 6: Site Preparation – Power Requirements: PDU Wiring Diagrams Table 6-4 3070 Series 3 / 79000 PDU wiring diagram Voltage Power line-to-neut Testheads xDSL/POTS Bay Option / line-to-line 327X Outlet 79000 Outlet 317X Outlet 307X Outlet Outlet locations Locations...
Page 79
Chapter 6: Site Preparation – Power Requirements: PDU Wiring Diagrams Table 6-4 3070 Series 3 / 79000 PDU wiring diagram Voltage Power line-to-neut Testheads xDSL/POTS Bay Option / line-to-line 208–220V 3-Phase Wye 120 / 208 Figure 6-7 Figure 6-12 Figure 6-17...
Chapter 6: Site Preparation – Power Requirements: Facts about PDUs, MPUs and Power Options Facts about PDUs, 79000 systems shipped prior to the 3070 Series 3 Beginning with the release of Series 3, in 2-PDU MPUs and Power used one E1135B PDU in the testhead and those...
Chapter 7: Site Preparation – Compressed Air and Vacuum Requirements: Vacuum Requirements Connecting Vacuum to the Testhead Agilent 3070 Series I and Series II testheads do not have vacuum-switching solenoids (valves) inside the testhead, so external vacuum solenoids must be installed near the testhead to control the vacuum.
IEEE 802.3 Local Area Networking. All the necessary software and The 3070 Series I family systems are shipped with a licensing comes with the system, but you will need to recommended list of host names and IP addresses. The purchase and install the LAN cabling and associated ’/etc/hosts’...
Page 131
LAN interface cabling. Figure 8-1 on page 8-4, there are three 3070 Series I systems. hp3070a, hp3070b, and hp3070c are systems with disks. These could be either testhead controllers or Test Development Centers; from the LAN standpoint it does not matter.
IP address of the testhead controller and every other new controller in your Series II network. An example of the 3070 Series II internal testhead and external LAN connections is shown in Figure 8-2 page 8-6.
Page 134
Chapter 8: Site Preparation – Communications Cabling Requirements: Local Area Network Requirements Figure 8-2 An example of 3070 Series II network Router / Public LAN Public LAN Gateway /Backbone /Backbone as needed Test Development System 2..n on Hub Center Test Development...
The concept of a diskless work workstation has been eliminated with 3070 Series 3 and the 79000. The test servers are connected to the LAN the same way as any other servers.
Page 136
Chapter 8: Site Preparation – Communications Cabling Requirements: Local Area Network Requirements Figure 8-3 An example 3070 Series 3 / 79000 network Router / Public LAN Public LAN Gateway /Backbone /Backbone as needed Test System 2..n on Hub Server Test...
Page 137
Chapter 8: Site Preparation – Communications Cabling Requirements: Local Area Network Requirements Figure 8-4 An example 3070 Series 3 3070 MS Windows network Router / Public LAN Public LAN Gateway /Backbone /Backbone as needed Test System 2..n on Hub Server...
✸ Follow the unpacking instructions carefully and Uncrating an Agilent 3070 Series I System do not work alone. A fully loaded 307X Series I system with the shipping pallet might weigh 725...
Chapter 9: Site Preparation – Receiving and Moving Instructions: Uncrating The System Uncrating an Agilent 3070 Series II/3 and Agilent 2 Remove two 150-millimeter (6-inch) bolts from a 79000 System plastic bag attached to the ramp. Figure 9-3 : Remove the “Removable End” board...
3070 and Figure 10-1 same way. The power connections are very similar for 3070 Series II family testheads and support bays. the E1135C, except the input power is connected to a Following are important points to note about Figure mains disconnect switch.
Requirements and Introduction, 10-78 This remaining sections of this chapter describe the Connections (Prior electrical power requirements for 3070 Series 3 or Series 3 / 79000 Power Requirements, 10-80 79000 family board test systems which have serial to May 2000)
20 amps at 100–120 volts or be quickly removed in case of an emergency. The 10 amps at 200–240 volts, whichever is E1135C PDU, used with 3070 Series 3 and 79000 applicable. systems, contains a mains disconnect. This input...
Chapter 10: Site Preparation – Power Requirements for Older Systems: Series 3 Power Requirements and Connections (Prior to May 2000) Connecting Power To The Testhead WARNING ✺ The power options available for Agilent 3070 Series 3 / Hazardous voltages, capable of causing injury or 79000 with E1135C PDUs are shown in Table 10-10 death, are present inside the PDU as long as page 10-91.
Requirements, 10-124 NOTE E1131A PDU Electrical Requirements, 10-125 You cannot accurately measure the input current Agilent 3070 Series II / 3 - E1135A/B Power of the system’s power supplies using conventional Distribution Units, 10-128 50/60-hertz current probes because the input current waveforms are rich in harmonics.
Page 287
3070 system does not exceed 5-percent of the nominal voltage. Table 10-29 3070 Series I, E1131A power requirements for all power options 317X 307X...
Chapter 10: Site Preparation – Power Requirements for Older Systems: Tester Power Requirements (Series I/II) Agilent 3070 Series II / 3 - E1135A/B Power requirements of the system (see Table 10-31 Distribution Units page 10-130and on page 10-131). Table 10-32...
Page 290
50 percent less than actual. Also, current demand The power requirements for 3070 Series II family depends on the tests that are running on the systems with E1135A/B PDUs are shown in Table system.
Page 291
Chapter 10: Site Preparation – Power Requirements for Older Systems: Tester Power Requirements (Series I/II) Table 10-31 3070 Series II family power requirements with E1135A/B PDU System Power Option Voltage Full-Load Amps (FLA) for: 327X 317X 307X xDSL/POTS Testhead Support Bay...
Page 292
4. POTS and xDSL bays always require a separate power drop. Use the POTS/xDSL power options that is in the column below on the same line as the system power option. Table 10-32 3070 Series II family power requirements with E1135A/B PDU System...
Page 294
Chapter 10: Site Preparation – Power Requirements for Older Systems: Tester Power Requirements (Series I/II) Table 10-32 3070 Series II family power requirements with E1135A/B PDU (continued) System Power Option Voltage Full-Load Amps (FLA) for: 327X 317X 307X xDSL/POTS Testhead...
PDUs, MPUs and Power Options on page 6-41 for a list of important changes concerning PDUs, MPUs and power options which have occurred with 3070 Series 3 / 79000 products. Table 11-1 Series 3 / 79000 current requirements reduction serial numbers...