5 Storage

Where the equipment is not to be installed immediately, proper storage is important to ensure protection of equipment
and validity of warranty.
All equipment should be stored indoors, protected from the elements in a cool dry area. If storing on the ground,
ensure that the storage area is not an area where water will collect.
The recommended temperature while in storage is -20

6 Unpacking of Equipment

When unpacking the equipment:
Check for damage during transit.
Confirm that all the components required are present.
If the set of components received is incomplete or damaged contact GE in a timely
way to minimize delays.

7 Installation

Installation should be in accordance with the vehicle manufacturers instructions, national regulations and the
installation procedures defined by GE Digital Mining Technology. The installations must only be performed by
authorized and qualified installers.
8 Test & Commission
At installation time, the system must be checked against the installation test procedure (ITP) to verify the system is
correctly installed and functioning as required. After passing its final installation test, the system is then ready for
use after which inbuilt self- diagnostic testing combined with daily user monitoring ensures that any faults can be
acted upon.
CAS-GPS Node II User Manual (DOCU0142)
CAS-GPS Node II User Manual
0
Take care when unpacking the equipment to avoid damage.
C to 60
C
0
Rev A
Page 7 of 20

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents