1. INTRODUCTION

This Installation Manual contains essential information for the electrical and mechanical
Installation that you must know before installing EGING PV modules. This also contains safety
information you need to be familiar with.
All the information described in this manual are the intellectual property of EGING and based on
the technologies and experiences that have been acquired and accumulated in the history of
EGING.
This document does not constitute a warranty, expressed or implied. EGING does not assume
responsibility and expressly disclaims liability for loss, damage, or expense arising out of or in any
way connected with installation, operation, use or maintenance of the PV modules. No
responsibility is assumed by EGING for any infringement of patents or other rights of third parties
that may result from use of PV module.
EGING reserves the right to make changes to the product, specifications or installation manual
without prior notice.
2. GENERAL INFORMATION (INCLUDING WARNING AND SAFETY)
The installation of PV modules requires a great degree of skill and should only be performed by a
qualified licensed professional, including licensed contractors and licensed electricians.
Please read this manual carefully before installing or using the modules. Please be aware that there
is a serious risk of various types of injury occurring during the installation including the risk of
electric shock.
All EGING PV modules are equipped with a permanently attached junction terminal box that will
accept variety of wiring applications or with a special cable assembly for ease of installation, and
they do not require special assembly.
EGING PV modules are designed in accordance with the international standard IEC61215,
IEC61730 and UL1703. .The solar modules have been qualified for application class A(equivalent
to safety class Ⅱ requirements) .

3. RULES AND REGULATIONS

The mechanical and electrical installation of the module should obey local regulations, including
electrical law, construction law and electricity connection requirements. These regulations are
different in different installation site, such as the installation on the building roof, different
installation environment of the power station. Requirements may also differ with the system voltage,
the use of AC or DC. For the specific terms, please contact local authority.
Before installing the PV module, contact appropriate authorities to determine permit, installation
and inspection requirements that should be followed.
 
 
FOR EGING PV MODULES
~1~ 

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EGM Series and is the answer not in the manual?

Questions and answers

Summary of Contents for EGING PV EGM Series

  • Page 1 ☆ All EGING PV modules are equipped with a permanently attached junction terminal box that will accept variety of wiring applications or with a special cable assembly for ease of installation, and they do not require special assembly.
  • Page 2: Electrical Safety

      < GENERAL SAFETY > Installing PV modules and ground frames should be in accordance with applicable rules and regulations. Only installer/service personnel should have access to the PV module installation site. In order to avoid a risk of injury or electrical shock, do not allow anyone to approach the PV module if the person has little knowledge on PV module or on the measures that should be taken when PV modules are damaged.
  • Page 3: Installation Safety

      specified maximum system voltage. The voltage is proportional to the number of series. In case of parallel connection, please be sure to take proper measure (e.g. fuse for protection of module and cable from over current, and/or blocking diode for prevention of unbalanced strings voltage) to block the reverse current flow.
  • Page 4   23. Do not touch the terminal box and the end of output cables the cable ends (connectors) with bare hands during installation or under sunlight, regardless of whether the PV module is connected to or disconnected from the system. 24.
  • Page 5 EGING PV modules have passed the tests in IEC61215 and IEC61730, including damp heat test, wet leakage current test and so on. The protection level of EGING PV modules is IP65. The PV modules should not be installed in flooded areas. The junction box should be on the higher side of the module when it is mounted.
  • Page 6   If not connected correctly, the bypass diode could be destroyed. ☆ PV modules can be wired in series to increase voltage. Connect wires from the positive terminal of one module to the negative terminal of the next module. Figure 2 shows modules connected in series.
  • Page 7 The mounting method has been verified by EGING and NOT CERTIFIED by a third party organization. The approved way to mount EGING PV modules to a support structure is to use the bolt holes provided as described in the Specifications.
  • Page 8   Clearance between the module frames and surface of the wall or roof is required to prevent the junction box from touching the mounting surface and to circulate cooling air around the back of the module. The exact space size may be decided by the installer or the system integrator based on the analysis of local weather and the specific roof structure involved.
  • Page 9   INSTALLATION MANUAL - PHOTOVOLTAIC MODULES- EGM-*** INSTALLATION The size of the module is 1580*808*30mm. The mounting method has been verified by EGING and NOT CERTIFIED by a third party organization. Please review the descriptions and drawings carefully; not mounting the modules according to one of these methods may void your warranty. These mounting methods are designed to allow module loading of 5400Pa.
  • Page 10   (catch width of 5mm and length of 30 mm) as shown in Figure 4. The array rails must support the bottom of the modules and must be continuous pieces (no breaks in the rail). The maximum snow load is 5400 Pa. Figures 4 190 mm<e<240 mm 150 mm<e<250 mm...
  • Page 11   centre of each long frame, as shown in Figure 8. 190mm<s<240mm 150mm<s<250mm Figures 7 Figures 8 ELECTRICAL INSTALLATION INSTRUCTION Cable characteristics Size: 4.0mm Type: PV1-F Temperature rating of conductor: -40~120°C Module configuration (Recommend) # Maximum parallel strings without proper measures (e.g. fuse and/or blocking diode): 1 string. Note: Parallel configuration is not limited in case of taking proper measure (e.g.
  • Page 12   INSTALLATION MANUAL - PHOTOVOLTAIC MODULES- EG-***M60-C EG-***P60-C 1. INSTALLATION The size of the module is 1650*990*35mm. The mounting method has been verified by EGING and NOT CERTIFIED by a third party organization. Please review the descriptions and drawings carefully; not mounting the modules according to one of these methods may void your warranty.
  • Page 13   must support the bottom of the modules and must be continuous pieces (no breaks in the rail). The maximum snow load is 5400Pa. Figures 4 300mm<e<350mm 200mm<e<300mm Figures 5 Figures 6 The modules may also be clamped at 4 corners on the short frame part as shown in Figure 6. The mounting clips should meet the minimum dimensions (catch width of 5 mm and length of 30 mm) as shown in Figure 4.
  • Page 14   dimensions (catch width of 5mm and length of 30mm) shown in Figure 4. The array rails must support the bottom of the modules and must be continuous pieces (no breaks in the rail). The maximum snow load is 5400 Pa. The modules may also be mounted on the short sides of the module with four clamps, as shown in Figure 8.
  • Page 15   INSTALLATION MANUAL - PHOTOVOLTAIC MODULES- EG-***M72-C EG-***P72-C 1. INSTALLATION The size of the module is 1968*990*40mm. The mounting method has been verified by EGING and NOT CERTIFIED by a third party organization. Please review the descriptions and drawings carefully; not mounting the modules according to one of these methods may void your warranty.
  • Page 16   290 mm from the end of the module. The module must be supported along the length of the long edge, and should overlap the array rail by at least 20mm. Note that the mounting clips should meet the minimum dimensions (catch width of 5mm and length of 30mm) as shown in Figure 4. The array rails must support the bottom of the modules and must be continuous pieces (no breaks in the rail).
  • Page 17   load is 5400 Pa. The modules may also be mounted on the short sides of the module with four clamps, as shown in Figure 8. The module must be supported along the length of the short edge, and should overlap the array rail by at least 20mm.
  • Page 18   ANNEX: MECHNICAL AND ELECTRICAL RATINGS Standard Test Conditions are : irradiance of 1kW/m , AM 1.5 spectrum, and cell temperature of 25℃. Pmax of any individual module will be within 0~+3% tolerance of these specified values. Specifications and electric characteristics in Table 1 are subject to technical and product innovations. Information in this document is subject to change without notice.
  • Page 19   EGM-170 34.52 4.93 43.82 5.38 EGM-175 34.43 43.89 5.57 EGM-180 34.82 5.17 43.66 5.66 EGM-185 35.11 5.27 43.89 5.72 EGM-190 35.52 5.35 43.96 5.76 EGM-195 35.77 5.45 44.14 5.87 EGM-200 36.05 5.55 44.32 5.98 EGM-205 36.35 5.64 44.50 6.07 EGM-210 36.59 5.74...