..........................7 SECTION 6 – PARTS LIST ............................8 GENERAL..............................8 DESCRIPTION.............................8 HOW TO USE THIS PARTS LIST ........................8 HOW TO ORDER PARTS ..........................8 EJECTOR PARTS BREAKDOWN (Figure 3) ....................9 SECTION 7– MISCELLANEOUS ..........................10 EJECT SYSTEM PRODUCTION SETUP ....................10 NOTES............................... 11...
Safety instructions in this manual are bold-faced for emphasis. The signal words WARNING and CAUTION are used to indicate hazard seriousness levels as follows: ML0068-001-02 Container Eject System ENERCON INDUSTRIES...
GENERAL The Enercon Eject System was designed to provide the packaging industry with a simple system to eject bad containers off a conveyer. The eject system can be used with any “bad container” detectors, such as; missing foil detectors, high cap detectors and missing cap detectors to name a few.
Carefully open all shipping containers and remove then be mounted somewhere within this window. the contents. Each item should be thoroughly The ejector can then be mounted on the side of the inspected for damage. conveyor using the angle brackets and hardware supplied.
EJECT SYSTEM INSTALLATION WITH FOIL LINER DETECTOR Figure 1 EJECT SYSTEM INTALLATION WITH CAP INSPECTION SYSTEM Figure 2 ML0068-001-02 Container Eject System ENERCON INDUSTRIES...
(If more than 29 containers are detected before the first bottle is ejected the timing function of the ejector will be out of synchronization.) ML0068-001-02 Container Eject System ENERCON INDUSTRIES...
Due to the nature of this system the amount of maintenance required will be minimal. The main priority for maintenance will be keeping the unit and air supply clean and properly adjusted. CLEANING As long as clean air is supplied to the ejector minimal cleaning is required for proper operation. ADJUSTING...
2. Is the power switch on at the power entry module 3. Check the fuse inside the power entry module 4. Remove power and open the box and ensure the ribbon cable is properly connected between the display board and the ejector control board 5. Contact Enercon service department...
This manual, which contains an illustrated parts To order, contact: breakdown, has been prepared as an aid in identifying and ordering parts in the ejector. All of Enercon Customer Service Department the parts listed in the parts breakdown are Phone Number: (262) 255-6070...
EJECTOR PARTS BREAKDOWN INDEX NO. PART NO. DESCRIPTION QTY. PN0093 Pressure Gauge, Panel Mount PN0092 Regulator, Panel Mount PN0091 Flow Control, Panel Mount HW0101 Bumper CN0059 Power Entry Module LM4439-01 Eject Display Board LM4440-01 Eject Control Board (120 VAC) LM4440-02...
SECTION 7 – MISCELLANEOUS EJECT SYSTEM PRODUCTION SET-UP Product Delay Eject Plunger Line High Cap Missing Foil Time Time Speed Pressure Speed Ejects (Y/N) Ejects (Y/N) ML0068-001-02 Container Eject System ENERCON INDUSTRIES...
Need help?
Do you have a question about the Ejector and is the answer not in the manual?
Questions and answers