Table of Contents Description of Parts 1 TABLE OF CONTENTS.................1 2 DESCRIPTION OF PARTS..............1 3 ASSEMBLY INSTRUCTIONS...............2 4 FRAME MOUNTING AND TENSIONING THE STRING.......4 5 BASE CLAMP ADJUSTMENTS............5 6 PREPARATION OF STRINGING…............6 1. Machine Base 8. Side Support Arm 2. Linear String Gripper 9.
Step 4: Take off the tension bar Assembly Instructions end cap (7) and place the drop Step 1: After opening the box, weight (5) onto the tension bar (6). remove installation operation manual. Remove the box which is wedged inside the top piece of foam.
Page 4
Step 6: Make sure the tension bar outstretched from machine. Take the 5mm Allen Key (14) and screw in the screw shown in the photo. This will prevent the tension bar (6) from dropping towards the machine, allowing it to rest in an upright position.
Frame Mounting and tensioning the string Step 4: Use your hand to let the Step 1: Insert the angled frame tension bar (6) drop down allowing supports (9) into the appropriate gravity to take over which applies slots located on the end of the side tension to the string.
Base Clamp adjustment This only needs to be done if your base clamps (13) are getting loose. Locate the black cap on the backside of the base clamp (13). Carefully pull it off. Turn the base clamp (13) so that the outer port is aligned with the inner port.
Preparing the clamps To clamp the string, squeeze the lever closed. To release the string, pull the lever out. To tighten the string clamp (10), turn the dial clockwise. To loosen it, turn the dial counter-clockwise. NOTE: Before stringing a racquet, the tension on the string clamp (10) has to be adjusted in accordance with the type of string gauge being used.
Need help?
Do you have a question about the Flame and is the answer not in the manual?
Questions and answers