Maintenance - Vent-Axia HR100RS Installation And Servicing Instructions

Mini air handling unit - for ducted ventilation with heat recovery

Advertisement

Cover securing
screws
Cover
Clamp strap screws
Cover securing
screw (safety)
1) Isolate the mains power supply.
2) Remove the four cover securing thumb screws then remove the centre safety screw.
3). Remove the cover and move clear to the side.
4) Remove the two strap securing screws.
5) Remove the strap holding the heat exchanger.
6) Remove the heat exchanger from the unit.
7) Wash the heat exchanger in warm water using a mild detergent and dry thoroughly. Keep water
away from all electrical components and wiring within the unit. If the filter cannot be cleaned,
replacement is recommended.
8) Reassemble in reverse order. The heat exchanger should be repositioned with 'TOP' label visible
6.0
6.1
In addition to removing odours, providing
fresh air and removing heat, this unit
extracts airborne impurities such as dust,
dirt and grease. These gradually build up
and detract from the efficiency and
Heat exchanger
appearance of the unit.
To ensure optimum performance, the unit
should be cleaned at least every six
months or at periods determined by the
Heat exchanger
level contamination experienced, and in
retaining strap
accordance with the following procedure.

Maintenance

Cleaning the Unit