Siemens CALOMAT 6 Additional Equipment Manual

Siemens CALOMAT 6 Additional Equipment Manual

Gas analyzers of category ii 2 g for use in in hazardous areas of zone 1
Hide thumbs Also See for CALOMAT 6:

Advertisement

Additional Equipment Manual release 07/2002
g g as anal
as analy y sis
sis
g g g
y y y
ULTRAMAT/OXYMAT/CALOMAT 6
Gas analyzers of category II 2 G for use in
potentially hazardous areas of zone 1

Advertisement

Table of Contents
loading

Summary of Contents for Siemens CALOMAT 6

  • Page 1 Additional Equipment Manual release 07/2002 g g as anal as analy y sis g g g y y y ULTRAMAT/OXYMAT/CALOMAT 6 Gas analyzers of category II 2 G for use in potentially hazardous areas of zone 1...
  • Page 2 CALOMAT 6, OXYMAT 6, ULTRAMAT 6 Gas analyzers of category II 2 G for use in in hazardous areas of zone 1 Additional Equipment Manual A5E00058873-02 Release 07/2002...
  • Page 3: Ultramat/Oxymat/Calomat

    Toute communication ou reproduction de ce document, toute ULTRAMAT, OXYMAT, CALOMAT, SIPAN exploitation ou communication de son contenu sont interdites, sont des marques déposées de Siemens. sauf autorisation expresse. D'autres dénominations utilisées dans ce document peuvent Tout manquement à cette règle est illicite et expose son auteur également être des marques déposées dont l'utilisation par...
  • Page 4: Table Of Contents

    English Contents Notes Description Application range External explosion protection 1.2.1 Pre-purging phase 1.2.2 Operating phase Internal explosion protection Further safety measures 1.4.1 Analyzer versions EEx p with "Compensation of losses resulting from leaks" 1.4.2 Analyzer versions EEx p with "Continuous purging" Technical specifications Installation site Explosion protection...
  • Page 5: Notes

    If you require further information, or if problems arise which are not dealt with in sufficient detail in this document, please request the desired information from your local or responsible Siemens branch. Additional Equipment Manual EEx p Order No.:...
  • Page 6: Description

    English Description Application range The C 6F, O 6F and U 6F analyzers are used to measure individual components in gas mixtures. In conjunction with a certified EEx p safety device guaranteeing the pressurized enclosure, these analyzers can be used in hazardous areas of zone 1. The EEx p safety device guarantees defined pre-purging in the housing, and also the required pressurized enclosure during operation.
  • Page 7: Further Safety Measures

    English Further safety measures The sample gas and reference gas lines must terminate outside the hazardous area at a point with no danger; sample gas lines can be returned to the sampling point. When connecting combustible or non-combustible sample gases into the hazardous area, both the sample gas inlet and outlet must be provided with a flame inhibitor.
  • Page 8: Technical Specifications

    English Technical specifications Installation site Danger zone Zone 1 and zone 2 Ambient temperature 5 ... 45 °C Humidity Dew point must not be fallen below during storage and operation Explosion protection Ignition protection type - Pressurized enclosure EEx p with compensation of losses resulting from leaks (analyzer versions 7MB251x-xxx0x-xAEx, 7MB201x–xxxxx–2or3xxx and 7MB211x–xxxxx–2or3xxx)
  • Page 9: Pneumatic Data Of The Protective Gas

    English Pneumatic data of the protective gas Housing volume: Approx. 50 l Input pressure (to supply the EEx p safety device): 0.2...0.4 MPa (2...4 bar) Protective gas: - Inert gas (e.g. nitrogen from a gas cylinder) - Air from an ex-free zone; prerequisite: free from oil and dust, particle size <40 µm, oil content <5 mg/m³...
  • Page 10: Differential Pressure Monitoring

    English Differential pressure monitoring (only for analyzer versions EEx p "Compensation of losses resulting from leaks" The sample gas pressure must be supplied fail-safe to the analyzer (within the specified limits, see Section 2.3). If only an operationally safe supply is available, an additional differential pressure switch must be provided (see also point 5 in "Special conditions"...
  • Page 11: Connection Of Sample Gas And Protective Gas

    English Assembly Connection of sample gas and protective gas (purging gas) Installation should take place at a vibration-free location where possible and protected from direct solar radiation. The analyzer and the EEx p safety device must be fixed according to their dimensional drawings and connected according to the assembly diagram in Section 3.2 or 3.3.
  • Page 12: Assembly Diagram For The Versions Eex P With "Compensation Of Losses Resulting From Leaks

    English Assembly diagram for the versions EEx p with "Compensation of losses resulting from leaks" Additional Equipment Manual EEx p Order No.: A5E 000 58873-02...
  • Page 13: Assembly Diagram For The Versions Eex P With "Continuous Purging

    English Assembly diagram for the versions EEx p with "Continuous purging" E-10 Additional Equipment Manual EEx p Order No.: A5E 000 58873-02...
  • Page 14: Electric Connections

    English Electric connections Warning Proper handling of the equipment by qualified personnel with observance of the 8 8 8 8 warnings is a prerequisite for safe operation. The regulations for installation of electrical systems in hazardous areas according to DIN VDE 0165 (EN 60079-14) and the standards therein must be observed. Failure to do so can lead to considerable damage, serious injury or even death.
  • Page 15: Commissioning

    English Commissioning Commissioning can only be performed properly when the person doing the commissioning is familiar with the contents of the manuals and operating instructions provided. The warnings in the individual manuals must be observed in particular. Connection to the EEx p safety device The analyzer must be connected to the EEx p safety device as shown in the assembly diagrams 3.2 and 3.3: Check the power supply...
  • Page 16: Additional Equipment

    English Additional equipment It is possible to add additional equipment/components to a mounting rail in the left hand part of the analyzer. The following points must be observed: - The mounting rail is approx. 250 mm long which limits the number of components which can be installed.
  • Page 17: Recommended Test Setup For Ultramat 6F

    English 6.1.2 Recommended test setup for ULTRAMAT 6F compressed air, free of dust, oil and condensation Bl 1, Bl 2 = blanking plugs M = manometer (relative pressure) 2 = outlet of sample gas path DR = pressure regulator 4 = outlet of reference gas path V1 = shut-off valve (leak rate <...
  • Page 18: Carrying Out The Leak Test

    English - Sample gas inlet 1 must be closed by a blanking plug. A shut-off valve (e.g. needle valve) of sufficient tightness must be connected between sample gas outlet 2 and the sample gas dissipation. - A pressure sensor (measuring range: 50 kPa, resolution :1 hPa) must be connected to the supply line.
  • Page 19 English E-16 Additional Equipment Manual EEx p Order No.: A5E 000 58873-02...
  • Page 20 @1PA5E00058873@ A5E00058873 Siemens AG Automation and Drives Group Process Instrumentation Division D-76181 Karlsruhe www.siemens.com A5E00058873ED-02...

Table of Contents