Assembling the Stand
Assembly Procedure
1
Turn the base cover over so the underside is
facing up.
2
Insert the stand pipes into the base cover.
3
Tighten the screws
➀
to stabilize the stand pipes.
�������
�
�
����������������������
����������
�����
�����
����
Assemble the stand with a soft sheet placed under the base
cover. If a sheet is not laid before assembly, the front surface
of the base cover may be scratched.
(4 mm × 10 mm: silver)
����������
���������������
�������
�
�
����������������������
����
����������
����������
4
After assembling the stand, attach the falling
prevention metal fittings with the installation
screws
➂
(M4 × 35 mm: black).
��������������������
�������������������
����
����
Be sure not to attach the falling prevention metal fittings in the
reverse position.
�������������������
�
�
�������������������
�������������
�����
����������
���������������������
11
En
Need help?
Do you have a question about the KRP-TS01 and is the answer not in the manual?
Questions and answers