Water Hose Installation - Yamaha YP30G Owner's Manual

Hide thumbs Also See for YP30G:
Table of Contents

Advertisement

Available languages

Available languages

0˚C
25˚C
å YAMALUBE 4 (10W-40)
ç SAE #20
32˚F
80˚F
2
Recommended engine oil:
å YAMALUBE 4 (10W-40),
∫ SAE #30
ç SAE #20
∂ SAE 10W
Recommended engine oil grade:
API Service SE type or higher
Engine oil quantity:
0.6 L (0.63 US qt, 0.53 Imp qt)

Water hose installation

1. Install the hose joint to the pump.
1
1 Hose joint
NOTICE
When installing the joint to the pump, be sure the
gasket is in place.
2. Connect the hoses on the joints with clamp.
3. Connect the strainer on the inlet hose end.
2 Strainer
NOTICE
9 Be sure the hoses are installed securely or air
leak will occur and water will not be drawn up.
9 Be sure the strainer is installed or pump dam-
age may occur.
NOTICE
Install the strainer
A) 50 mm (2 in) suction port diameter for YP20G
or
B) 80 mm (3 in) suction port diameter for YP30G
both with filtering perforations 8 mm (0.31 in) or
less in diameter.
SAE 10W-30 or 10W-40
– 9 –

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yp20g

Table of Contents