Page 3
About INDY-CATOR-G Function The Indy-Cator G displays the current and maxi- mum longitudinal and transverse accelerations of a vehicle. The maximum values are displayed after start- up. The MAX symbol appears; first, the previous- ly measured maximum acceleration is displayed, then the maximum deceleration.
Package content Display instrument (1x) Threaded ring (1x) Reference box with power supply lines (1x) Cable terminal clamp (2x ) Cable ties (3x) Data cable 3 metres (1x) Illustr. 1...
Page 5
Instrument installation 1.1.1 1.2.1 At assembly in a universal instrument carrier: Reference box preparation Attach instrument in the instrument carrier with Connect the plus line from the ignition and a threaded ring. Carefully connect the 3 metres ground line to the power supply lines of the long data cable to one of the two rear sockets in reference box (red to 12 Volt from the ignition, the instrument (fig.
Page 6
Programming/ Commissioning > The vehicle should be placed on a surface that is as level as possible before program- ming. (important for precise measurement) Since the vehicle has to start in first gear af- ter programming (light acceleration), please ensure now that there are no obstacles (20 >...
Page 7
> Fastening the reference box: Please switch off the motor. (Programming re- The selected surface to glue on the reference mains saved with the display/ ignition switched box should be smooth and free of grease. off ). The gear boot and any applicable covers in The box should be placed as horizontally as the car can now be re-assembled.
Need help?
Do you have a question about the INDY-CATOR-G and is the answer not in the manual?
Questions and answers