iceqube EX series Operation And Installation Manual

iceqube EX series Operation And Installation Manual

Zone 1 atex and iecex hazardous locations

Advertisement

EX Series Air Conditioners
Zone 1 ATEX and IECEx Hazardous Locations
OPERATION AND INSTALLATION MANUAL
*** IMPORTANT ***
PLEASE READ this manual and follow the instructions for safe and satisfactory installation and operation of this system. Keep
this manual for future reference. Some information may not apply to
all systems.
RELATED DRAWING; DO NOT CHANGE WITHOUT AUTHORIZED PERSON APPROVAL

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EX series and is the answer not in the manual?

Questions and answers

Summary of Contents for iceqube EX series

  • Page 1 EX Series Air Conditioners Zone 1 ATEX and IECEx Hazardous Locations OPERATION AND INSTALLATION MANUAL *** IMPORTANT *** PLEASE READ this manual and follow the instructions for safe and satisfactory installation and operation of this system. Keep this manual for future reference. Some information may not apply to all systems.
  • Page 2: Table Of Contents

    Introduction ........................3 Basic Unit Operation ......................3 Preservation Instructions ....................4 Pre-Installation Test ......................5 Preparing the Enclosure ....................6 Mechanical Installation Instruction ................7 Electrical Installation Instruction ................... 8 Operating Your System ....................10 Thermostat Operation ....................10 Service and Maintenance Instruction ................
  • Page 3: Introduction

    Introduction Ice Qube computer and electronics enclosure cooling systems have been designed to provide a safe environment for your equipment. Our cooling systems provide this environment by cooling and dehumidifying the enclosure that houses your equipment while providing an efficient, modern, and aesthetically pleasing package requiring minimal maintenance.
  • Page 4: Preservation Instructions

    Preservation Instructions Unpacking Inspection Caution: It is recommended using gloves and protective eyewear when unpacking Verify product is as identified on the packing list. Air conditioner should arrive banded to pallet and wrapped with an outer protective clear plastic membrane material in the proper upright position. See arrows on packaging for verification.
  • Page 5: Pre-Installation Test

    Pre-Installation Test Before installing the Ice Qube system on your enclosure, Ice Qube recommends that the unit operates for 20-30 minutes to ensure it is functioning properly. Although the Ice Qube TMS has been tested at the factory, internal damage may have occurred during shipping which may have not been apparent during the unpacking inspection.
  • Page 6: Preparing The Enclosure

    Ice Qube TMS. An Electronic copy is available at http://www.iceqube.com/downloads/specification-drawings/ Ensure the Ice Qube TMS will be mounted level. Ensure the inlet and outlet of the cold air stream will not be restricted by equipment or shelving within your enclosure.
  • Page 7: Mechanical Installation Instruction

    Mechanical Installation Instruction Caution: Protective safety clothing such as helmet, gloves, and steel toe shoes are recommended. Position the Ice Qube TMS so that the two mounting studs are in alignment with the top two 1/2" (12.7mm) holes in your enclosure surface. ( See Figure 1: Enclosure Installation pg:7) Slide the Ice Qube TMS mounting studs through the 1/2"...
  • Page 8: Electrical Installation Instruction

    Electrical Installation Instruction Please read the entire section before beginning the electrical installation of the Ice Qube TMS. Ice Qube air conditioners have been designed for easy electrical power connection at one specific location on the enclosure side of the Ice Qube TMS. Each Ice Qube TMS has been designed to operate at a range of voltages and frequencies.
  • Page 9 Figure 2: Customer Wiring Figure 3: Customer Interface Rev. 1...
  • Page 10: Operating Your System

    Operating Your System Once the Ice Qube TMS has been installed onto the enclosure and the power cable has been attached to a properly grounded electrical connection with adequate voltage and current supply, the unit is ready for operation. As soon as electrical power is supplied to the Ice Qube TMS, the air conditioner will begin to operate.
  • Page 11: Service And Maintenance Instruction

    Service and Maintenance Instruction ***WARNING: EXPLOSION HAZARD!*** DO NOT SERVICE OR MAINTAIN THIS PRODUCT WHILE CIRCUIT IS ENERGIZED! Service Caution: Service to this model may void the hazardous area ATEX / IECEx Certification and factory warranty. Please contact Ice Qube with any questions regarding service before opening or altering the system from its original factory configuration.
  • Page 12: Trouble Shooting

    Trouble Shooting Contact Ice Qube if the air conditioning system should fail to operate satisfactorily during the first year of operation. DO NOT remove the cover without first notifying customer service. Removal of the cover will immediately void the warranty. If an operating problem should occur, please review the items outlined on the following page “Trouble Shooting Check List.”...
  • Page 13 Trouble Shooting Checklist Serial Model No: Number: Voltage Rating: Amps: Phase: 1 Frequency: Options: Yes  No  Is proper electrical power available at the power supply? Yes  No  Is your power cord connected to the power supply and IQ terminal block? Yes ...
  • Page 14: Schematic Wiring Diagrams

    Schematic Wiring Diagrams Figure 4 Rev. 1...
  • Page 15: Specification Drawing

    Specification Drawing IQ4000EX Figure 5...
  • Page 16: Iq5000Ex

    IQ5000EX Figure 6 Rev. 1...
  • Page 17: Iq6000Ex

    IQ6000EX Figure 7 Rev. 1...
  • Page 18: Iq8000Ex

    IQ8000EX Figure 8 Rev. 1...
  • Page 19: Iq10000Ex

    IQ10000EX Figure 9 Rev. 1...
  • Page 20: Iq12000Ex

    IQ12000EX Figure 10 Rev. 1...
  • Page 21: Iq4-5-6000Ex Gasket And Cutout

    IQ4-5-6000EX Gasket and Cutout Same Gasket and Cutout for IQ4000EX, IQ5000EX, and IQ6000EX Figure 11 Rev. 1...
  • Page 22: Iq8-10-12000Ex Gasket And Cutout

    IQ8-10-12000EX Gasket and Cutout Same Gasket and Cutout for IQ8000EX, IQ10000EX, and IQ12000EX Figure 12 Rev. 1...
  • Page 23 Standard Warranty Policy Ice Qube, Inc. ("Ice Qube") warrants that the products manufactured by Ice Qube (the "Products") are free of defects in material and workmanship which impair the operation of the Products, under normal and proper use and service, for a period of one (1) year from the date of shipment FCA from Ice Qube’s facility located in Greensburg, Pennsylvania (the "Standard Warranty").
  • Page 24  fire, wind, hail, flood, lightning or other acts of God;  any damage to the finish of the Products after they leave Ice Qube's facility;  any discoloration or spotty appearance of the Products;  return freight and shipping charges, along with applicable duties and other like fees and charges, for the return of the Product to Ice Qube (such amounts are the sole responsibility of the customer);...
  • Page 25: Notes

    Notes: Rev. 1...

Table of Contents