Installation Requirements; Inventory Checklist; Parts That Come With All Pdu Models - Lenovo 46M4002 Installation And Maintenance Manual

1u c19 and c13 switched and monitored pdus
Table of Contents

Advertisement

• Danger: These statements indicate situations that can be potentially lethal or extremely hazardous to you.
A danger statement is placed just before the description of a potentially lethal or extremely hazardous
procedure step or situation.

Installation requirements

You will need the following tools to install the PDU in a rack cabinet:
• One Phillips screwdriver
• One 10 mm (11/32 in.) wrench
• One cage-nut-insertion tool or flat-blade screwdriver (for installing cage nuts in some rack cabinets)
You can install a 1U PDU vertically in the side of a rack cabinet or horizontally within 1U
space in a rack cabinet.
• For vertical mounting instructions of the 1U PDU, see Chapter 2 "Installing the 1U PDU vertically in a rack
cabinet" on page 9.
• For horizontal mounting instructions of the 1U PDU, see Chapter 3 "Installing the 1U PDU horizontally in a
rack cabinet" on page 17.

Inventory checklist

Note: The illustrations in this document might differ slightly from your hardware.

Parts that come with all PDU models

The following parts come with all PDU models:
• One PDU environment sensor kit:
– One PDU environment sensor
– One Category 5 Ethernet cable
– One mounting screw
– Self-adhesive hook-and-loop fastener pad
• Miscellaneous hardware kit (for attaching the mounting brackets to the PDU and installing the PDU in a
rack cabinet)
1.
One U is equal to 4.45 cm (1.75 in.)
2
1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide
1
of EIA mounting

Advertisement

Table of Contents
loading

This manual is also suitable for:

46m400346m400446m4005

Table of Contents