MS220-24/48 Series (EOS) Installation Guide On Mar 16, 2017, Cisco Meraki announced the end-of-sale date for the MS220-24/48 series switch will be Jul 29, 2017. The end-of-support date is Jul 29, 2024. Read more about our Product End-of-Life (EOL) Policy.
Rack Mount Kit includes: ▪ US 12-24 mounting screws and cage nuts, 5 of each ▪ INTL M5 mounting screws and cage nuts, 5 of each ▪ INTL M6 mounting screws and cage nuts, 5 of each ▪ Mounting washers MS220-24 Series front panel MS220-48 Series front panel Ports and Status Indicators...
Page 3
Switch is unable to Power Solid orange connect to the Meraki cloud Firmware upgrade in Flashing green process Switch is fully operational and Solid green connected to the Meraki cloud Switch does not have power Restore button to clear Restore switch IP and local configuration settings Switch Ports...
RPS2300 Redundant Power Supply (Optional) The MS220-24 series supports connecting the Cisco RPS2300 for optional power redundancy. MS220-24 series models support failover and reversion to main power once it has been restored. The following Cisco part numbers are supported: Part number...
RPS power supply matrix Switch Model Full power load, [switch only / including PoE] MS220-24 18 W / not applicable MS220-24P 77 W / 447W MS220-48 51 W / not applicable MS220-48LP 135 W / 505 W MS220-48FP 163 W / 903 W Example configurations Example 1: "I have 3 x MS220-24 and 3 x MS220-48 switches connected to my RPS2300"...
1 x PWR-RPS2300 2 x C3K-PWR-1150WAC (2300W) 6 x CAB-RPS2300-E= Example 3: I have 3 x MS220-48 and 3 x MS220-48LP connected to RPS2300. I also intend to use the full PoE budget on each of the PoE switches but I do not need to back it up in case of a failure. 3 x 51 = 153W 3 x 135 = 405W 153W + 405W = 558W total power draw...
Need help?
Do you have a question about the MS220-24/48 Series and is the answer not in the manual?
Questions and answers