Siemens ProLINE-RoadRunner ProLINE-RoadRunner Operator's Manual page 50

Siemens owner's manual proline-roadrunner
Table of Contents

Advertisement

> Job
Advance Pocket
Align Pocket
48
Running the Self-Test
3
1
ProLINE-RoadRunner Operator's Guide
Run the Self-Test procedure
approximately once a week.
To run the Self-Test procedure:
1. Press Pause.
2. Clear all devices from the
sockets and from the conveyor
belt.
3. Toggle the power switch off and
then back on.
The Self-Test will run, checking
the condition of the
components.
4. Check the display for system
errors.
A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proline-roadrunner

Table of Contents