Hypermax Mach 7 CXT Installation Instructions

Performance module

Advertisement

Hypermax Mach 7 CXT Performance Module
1. Locate the FICM (Fuel Injection Control Module) on the driver's side of the
engine.
2. Remove the 22 Pin Connector from the FICM module-Figure 1
3. Insert the Mach 7 engine harness 22 pin connector into the FICM-Figure 2
4. Insert the factory 22 pin connector into the mating connector of the Mach 7
engine harness.
5. Secure the Mach 7 engine harness with the provided zip ties
6. Route the engine wire through the firewall-Gray wire with 8 pin terminals.
***Use caution when routing this wire to be sure that you do not rip
the wires from the connector-This is not covered under warranty***
7. Find a suitable place to mount the Mach 7 controller away from driver
controls.
8. Connect the 8 pin connector the Mach 7 CPU into the plug marked
"Engine Harness"-Figure 3
9. Connect the selector switch to the "Table Switch" plug
10. If you purchased the EGT probe then mount the probe into the exhaust
manifold BEFORE the turbo.
11. Route the yellow EGT extension wire through the firewall and connect it to
the EGT probe wires-Red to Red and Yellow to Yellow.
12. Secure the Mach 7 CPU and wires under the dash away from all the driver
controls.
Installation Instructions
Figure 1
7/6/2009

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Mach 7 CXT and is the answer not in the manual?

Questions and answers

Summary of Contents for Hypermax Mach 7 CXT

  • Page 1 Hypermax Mach 7 CXT Performance Module Installation Instructions 1. Locate the FICM (Fuel Injection Control Module) on the driver’s side of the engine. 2. Remove the 22 Pin Connector from the FICM module-Figure 1 3. Insert the Mach 7 engine harness 22 pin connector into the FICM-Figure 2 4.
  • Page 2 Figure 2 Figure 3 For technical support contact us at: Hypermax Engineering Inc. 255 East Route 72 Gilberts, IL 60136 847-428-5655 www.gohypermax.com 7/6/2009...

Table of Contents