2. Getting Started
2.1
Find the packing list in the box marked "Packing List".
2.2
Check the delivered materials and make sure there are no parts damaged
or missing. Note any missing or damaged material on freight bill.
2.3
Open the hardware box and organize the hardware packages. Do not open
the packages until they are called for during the installation procedures.
2.4
Locate the drawings sent with the shipment and confirm that the field
dimensions match the room.
2.5
Clean the area prior to installing lockers and clear enough room to provide
an adequate work area.
3. Locker Layout
3.1
Using the top view locker layout sheet, mark on the walls the starting and
ending point of each run of lockers. (fig 3.1)
3.2
Establish the highest point of the floor or cement curb in the room where
the lockers will be installed. Use your laser level to determine this, or a
level and a tape measure.
3.3
Using the front view of the locker layout sheet locate the height of the
locker. (fig 3.2) If you are installing the lockers on a cement curb then
mark this dimension at the highest point of the cement curb. If you are
installing the lockers on adjustable mounting feet then add 4 1/16 inches
to this dimension and mark on wall.
3.4
Using your laser level transfer this location on the walls where the lockers
are to be installed. (fig 3.3 & 3.4)
®