3. 4400 80kVA Seismic Installation
Table 3 lists the contents of the 4400 80kVA Seismic Kit 4400800SEISMICKIT. Figure 1 shows the order of
assembly for the [bolt + lockwasher + washer] fastener group.
TABLE 3 80 KVA SEISMIC KIT CONTENTS
440800SEISMICKIT Contents
No.
P/N*
5
66437 TOP SEISMIC BRACKET
7-a
Hex Bolt, 1/4—20,1-1/2"
7-b
Flat Washer, 1/4
7-c
E—Ring, F/0.25 Shaft
11-a
Hex Bolt, 5/16—18 x 1"
11-b
Lock Washer, 5/16
11-c
Flat Washer, 5/16
94016 4400 Seismic Kit Installation Manual
80 kVA
1. Prepare the floor anchorages. Arrange the anchorages to ac-
commodate the final layout including placement for ancillary
battery and/or Auxiliary cabinets. (Figure 19)
2. Prepare the wall anchorages. Key measurements off the an-
chorage placement in Step 1. (Figure 20)
3. Table 3 lists the components of the 80kVA Seismic Kit. Figure 18
show the Seismic anchorage component in the Seismic Kit for
the 80kVA cabinets.
4. Assemble the fastener groups in Table 3, [7a-7c] and
[11a-11c] as shown in Figure 1.
5. Secure the Top Seismic Bracket [5] to the top rear of the UPS
using three (3) fastener group [11].
6. Position the 80 kVA cabinet over the four floor anchors and se-
cure the unit.
7. Secure the Top Seismic Bracket to the wall anchors using 5/16"
Bolts.
8. Once installation is complete, secure the door of the cabinet us-
ing the two (2) Fastener Group [7].
4400 Series UPS Seismic Kit Installation Instructions – 94016-001
Description
Quan
(Figure 21)
(Figure 16)
1
2
2
FIGURE 1: FASTENER
2
GROUP (BOLT +LOCK
4
WASHER + WASHER)
4
4
1
80 kVA
7
P/N 440800SEISMICKIT
FIGURE 18: SEISMIC KIT
COMPONENTS (50 KVA)
a
b
c
5
9

Advertisement

loading