• Before you start, prepare a level surface with the proper
Safety Zone (see page 12).
• 2+ people recommended for setup
Save this instruction in the event that the manufacturer has
to be contacted for replacement parts.

TOOLS REQUIRED

(1)
(2)
1/2 in/po (≈13 mm)
(1)
(2)
3/16 in/po (≈5 mm)
(1)
(2, included)
(1)
ASSEMBLY INSTRUCTIONS
(1)
5/16 in/po (≈8 mm)
(1)
1/4 in/po (≈6 mm)
(1)

TABLE OF CONTENTS

Icon Legend................................4
Warnings And Notices..................5
Safety Information.....................6
Safe Play Area..........................12
A-Frame Assembly....................13
Deck Support Assembly.............19
Deck Assembly..........................30
Parts Identifi er.........................i-iv
Climbing Wall and Chalkboard
Assembly................................. 37
Roof Assembly..........................43
...............................................49
Swing Assembly........................55
Registration..............................63
Warning Sticker........................64
Warranty...................................65
MODEL# AND PRODUCT ID
(you will need both when contacting us)
Model Number: 90042
Product ID:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the A-FRAME PLAYSET 90042 and is the answer not in the manual?

Questions and answers

Summary of Contents for Lifetime A-FRAME PLAYSET 90042

  • Page 1 ASSEMBLY INSTRUCTIONS A-FRAME PLAYSET MODEL #60091 MODEL 90042 • Before you start, prepare a level surface with the proper Safety Zone (see page 12). • 2+ people recommended for setup Save this instruction in the event that the manufacturer has to be contacted for replacement parts.
  • Page 2: Icon Legend

    ICON LEGEND Indicates special heed should be taken when reading. Indicates the parts to be used for a section. Indicates no parts required for a specifi c section. Indicates the hardware to be used for a section. Indicates no hardware required for a specifi c page. Indicates the tools to be used for a section.
  • Page 3: Warnings And Notices

    WARNINGS & NOTICES SAFETY INSTRUCTIONS FAILURE TO FOLLOW THESE WARNINGS MAY RESULT IN SERIOUS INJURY OR PROPERTY DAMAGE AND WILL VOID WARRANTY. Owner must ensure that all players know and follow these rules for safe operation of the system. To ensure safety, do not attempt to assemble this product without following the instructions carefully. Check entire box and inside all packing material for parts and/or additional instruction material.
  • Page 4: Safety Information

    **IMPORTANT SAFETY INFORMATION** PLEASE READ BEFORE BEGINNING ASSEMBLY: INSTALLATION & GROUND PREPARATION INSTRUCTIONS • Place the equipment on a level, well-drained ground, not less than 6.6 ft (2.0 m) from any struc- ture or obstruction such as a fence, garage, house, overhanging branches, laundry lines, or electrical wires •...
  • Page 5 CONSUMER INFORMATION SHEET FOR PLAYGROUND SURFACING MATERIALS* Select Protective Surfacing—One of the most important things you can replenish and/or redistribute the surfacing. do to reduce the likelihood of serious head injuries is to install shock- absorbing protective surfacing under and around your play equipment. Do not install loose fi...
  • Page 6: Safe Play Area

    SAFE PLAY AREA SAFETY ZONE — Place the equipment no less than 6.6 ft. (2.0 m) from any structure or obstruction such as a fence, garage, house, overhanging branches, laundry lines, or electrical wires. Make sure the clearance in front of and behind the swings is at least twice the height of the swing bar. The impact surfacing needs to cover the entire recommended play area.
  • Page 7 A-FRAME ASSEMBLY HARDWARE REQUIRED Hardware Bag / Sac d’accessoires Bolsa de herraje DSA (x10) DZR (x6) EEO (x2) BTS (x10) DZQ (x6) ARO (x6) AAN (x6) BFD (x3) PARTS REQUIRED CONTENTS OF BOX 1 CBI (x1) CBG (x2) CBE (x1) CBF (x1) CONTENTS OF BOX 2 CB0 (x1)
  • Page 8 SECTION 1 (CONTINUED) TOOLS AND HARDWARE REQUIRED 3/16 in/po (≈5 mm) 1/2 in/po (≈13 mm) DZR (x6) AAN (x6) DZQ (x6) • Attach the Pendulums (DZQ) to the Swing Bar (CB0) using the hardware indicated. Do this for each set of brackets on the Swing Bar.
  • Page 9 SECTION 1 (CONTINUED) TOOLS AND HARDWARE REQUIRED 3/16 in/po (≈5 mm) DSA (x4) BTS (x4) • Insert the two A-Frame Poles (CBG) into the end of the Swing Bar (CBO) that does not have a nut insert in the location shown, and secure the Poles with the hardware indicated.
  • Page 10 SECTION 1 (CONTINUED) TOOLS AND HARDWARE REQUIRED 3/16 in/po (≈5 mm) DSA (x2) BTS (x2) • Attach the Turnbar (CBI) to the A-Frame Poles with the hardware indicated.
  • Page 11 SECTION 1 (CONTINUED) TOOLS AND HARDWARE REQUIRED 3/16 in/po (≈5 mm) DSA (x4) BTS (x4) • Attach the Ladder-side Pole (CBF) and the Net-side Pole (CBE) to the Swing Bar (CBO) in the location indicated. • A band of red tape can be found at the end of the Swing Bar with a nut insert. Make sure there is a nut insert on this side.
  • Page 12: A-Frame Assembly

    SECTION 1 (CONTINUED) TOOLS AND HARDWARE REQUIRED ARO (x6) BFD (x3) • Using at least two people, slowly rotate the A-Frame assembly upright. • Have one person hold the A-Frame assembly steady as another lifts each leg. Attach the A-Frame Foot Caps (BFD) and secure them with the Cap Plugs (ARO).
  • Page 13 DECK SUPPORT ASSEMBLY HARDWARE REQUIRED Hardware Bag BTS (x20) DSA (x10) DXY (x10) ARU (x1) ATV (x2) ARV (x8) AAF (x8) ARL (x3) ARO (x2) ARY (x2) EII (x6) ASV (x2) CAC (x2) BFD (x3) PARTS REQUIRED CONTENTS OF BOX 1 CBN (x1) CBJ (x1) CBK (x1)
  • Page 14 DECK SUPPORT ASSEMBLY PARTS REQUIRED CONTENTS OF BOX 2 CBP (x4) CBC (x1) CBQ (x2) CBB (x1) CBD (x1) CBA (x1) CONTENTS OF BOX 3 CONTENTS OF BOX 5 CBM (x1) CBL (x1) TOOLS REQUIRED 3/16 in/po (≈5 mm)
  • Page 15 SECTION 2 (CONTINUED) TOOLS AND HARDWARE REQUIRED 3/16 in/po (≈5 mm) DSA (x4) AAF (x4) DXY (x2) EII (x2) ASV (x2) BTS (x6) • Attach the Wall-side Deck Support (CBA) to the Left Vertical Pole (CBK) and Right Vertical Pole (CBJ) and secure with the hardware indicated.
  • Page 16 SECTION 2 (CONTINUED) TOOLS AND HARDWARE REQUIRED 3/16 in/po (≈5 mm) DSA (x4) BTS (x6) AAF (x4) EII (x2) DXY (x2) • Attach the Deck Support Tube, Net-side (CBB) to the Left Vertical Tube (CBK) using the hardware indicated. Make sure a Cross Brace (CBP) is secured between the Support Tube and the Vertical Pole.
  • Page 17: Deck Support Assembly

    SECTION 2 (CONTINUED) TOOLS AND HARDWARE REQUIRED 3/16 in/po (≈5 mm) DXY (x6) BTS (x6) • Attach the Deck Support Tube, Swing-side (CBD) to the Deck Support Assembly using the hardware indicated. Install the Inside Deck Support (CBL) in the position indicated and secure with the hardware indicated. Hook on Inside Deck Support points downward...
  • Page 18 SECTION 2 (CONTINUED) TOOLS AND HARDWARE REQUIRED 3/16 in/po (≈5 mm) EII (x2) DSA (x2) BTS (x2) • Attach the Deck Support Assembly to the A-Frame Assembly using the hardware indicated. Insert a Rectangular Plug (EII) in each end of the Deck Support Tube, Swing-side (CBD) once hardware is secure. Repeat this on the opposite side of the assembly to secure the Deck Support Assembly to both Poles.
  • Page 19 SECTION 2 (CONTINUED) TOOLS AND HARDWARE REQUIRED 3/16 in/po (≈5 mm) ARU (x1) BFD (x1) CAC (x1) ARO (x2) ARL (x1) • Slide the Ladder Cap (CAC) onto the Angled Ladder Leg (CAZ) as pictured, then connect the Angled Ladder Leg to the Ladder-side Deck Support (CBC) with the hardware indicated.
  • Page 20 SECTION 2 (CONTINUED) TOOLS AND HARDWARE REQUIRED ARV (x8) • Attach the Ladder Rungs (CBQ) to the Angled Ladder Leg (CAZ) and the Ladder-side Pole (CBF) using the hardware indicated. • This step requires two people.
  • Page 21 SECTION 2 (CONTINUED) TOOLS AND HARDWARE REQUIRED CAC (x1) • Slide the Angled Cargo Leg (CAY) into the Ladder Cap (CAC) and Left Vertical Pole (CBK) with the hardware indicated. Rest the Angled Cargo Leg against the Cargo Side Deck Support in the location shown. Do not secure it at this point in the assembly.
  • Page 22 SECTION 2 (CONTINUED) TOOLS AND HARDWARE REQUIRED ARY (x2) • While one person holds the Angled Cargo Leg in place, straighten out the ropes of the Cargo Net (CBM) and slide the Cargo Net up the angled poles on the playset. The large loops go on the sides and the small loops go at the top and bottom.
  • Page 23 SECTION 2 (CONTINUED) TOOLS AND HARDWARE REQUIRED 3/16 in/po (≈5 mm) ATV (x2) ARL (x2) BFD (x2) 2.10 • Secure the Cargo Net Bottom Pole (CBN) to the angled poles with the Bolt (ATV) going through the angled Foot Caps as shown.
  • Page 24: Deck Assembly

    DECK ASSEMBLY HARDWARE REQUIRED Hardware Bag DRZ (x6) ASB (x1) DXY (x18) ARU (x1) AOF (x2) BTS (x24) EIF (x2) ARL (x1) AAF (x3) EIG (x4)
  • Page 25 DECK ASSEMBLY PARTS REQUIRED CONTENTS OF BOX 1 CBV (x1) CBW (x1) CBU (x2) CONTENTS OF BOX 2 CBS (x4) CBT (x2) LARGE PLASTIC PARTS CBR (x1) TOOLS REQUIRED 3/16 in/po (≈5 mm)
  • Page 26 SECTION 3 (CONTINUED) TOOLS AND HARDWARE REQUIRED 3/16 in/po (≈5 mm) 3/16 in/po (≈5 mm) 3/16 in/po (≈5 mm) DRZ (x6) BTS (x6) • Place the Deck (CBR) on the Deck Support Assembly, textured side up. • There are three pre-drilled holes WARNING located here.
  • Page 27 SECTION 3 (CONTINUED) TOOLS AND HARDWARE REQUIRED 3/16 in/po (≈5 mm) ARL (x1) ARU (x1) • Secure the Angled Cargo Leg (CAY) from step 2.8 to the Cargo Side Deck Support with the hardware indicadas.
  • Page 28 SECTION 3 (CONTINUED) TOOLS AND HARDWARE REQUIRED EIG (x4) DXY (x8) BTS (x8) • Place the Square Plugs (EIG) into the ends of both Deck Tubes (CBU). Attach the Deck Tubes to the Hand Rails using the Hardware indicated. DXY DXY •...
  • Page 29 PARTS IDENTIFIER CONTENTS OF BOX 1 / CEL (x1) CBU (x2) CBW (x1) CBV (x1) CBE (x1) CBF (x1) CBG (x2) CBI (x1) CBJ (x1) CAY (x1) CAZ (x1) CBK (x1) CBN (x1) CBY (x1)
  • Page 30 PARTS IDENTIFIER CONTENTS OF BOX 2 CEM (x1) CB0 (x1) CBP (x4) CCG (x3) CBQ (x2) CBS (x4) CBT (x2) CBA (x1) CBB (x1) CCI (x1) CBC (x1) CBD (x1) CCJ (x1)
  • Page 31 PARTS IDENTIFIER CONTENTS OF BOX 3 CEN (x1) CCA (x2) CBL (x1) CCB (x8) CONTENTS OF BOX 4 / CEO (x1) CBZ (x1) CCC (x4) CONTENTS OF BOX 5 CEP (x1) CCH (x3) CAB (x1) CCE (x1) CCD (x1) CCF (x3) CAA (x1)
  • Page 32 PARTS IDENTIFIER CONTENTS OF BOX 5 / CEP (x1) BKU (x1) CBM (x1) BKT (x2) LARGE PLASTIC PARTS BEK (x1) CBX (x2) CBR (x1)
  • Page 33 SECTION 3 (CONTINUED) TOOLS AND HARDWARE REQUIRED 3/16 in/po (≈5 mm) ASB (x1) BTS (x4) AAF (x1) DXY (x4) • Attach the A-Frame Roof Tube (CBV) to the One-Handle Rails (CBS) and the Swing Bar (CBO) with the hardware shown in the locations indicated.
  • Page 34 SECTION 3 (CONTINUED) TOOLS AND HARDWARE REQUIRED 3/16 in/po (≈5 mm) DXY (x6) EIF (x2) BTS (x6) AAF (x2) AOF (x2) • Secure the Climbing Wall Deck Tube (CBW) to the One-Handle Rails (CBS) with the hardware indicated. • Secure the Climbing Wall Deck Tube (CBW) to the Right Vertical Pole (CBJ) and Left Vertical Pole (CBK) with the hardware indicated.
  • Page 35: Climbing Wall And Chalkboard Assembly

    CLIMBING WALL AND CHALKBOARD ASSEMBLY HARDWARE REQUIRED Hardware Bag ADV (x10) ADW (x10) Hardware Bag ASF (x2) ARV (x3) CHX (x2) PARTS REQUIRED CONTENTS OF BOX 1 CBY (x1) LARGE PLASTIC PARTS CONTENTS OF BOX 4 CBX (x2) CBZ (x1) TOOLS REQUIRED 1/4 in/po (≈7 mm)
  • Page 36 SECTION 4 (CONTINUED) TOOLS AND HARDWARE REQUIRED 1/4 in/po (≈7 mm) • Place a Climbing Wall Panel (CBX) on the ground, or in a safe drilling position. The indentations in the Climbing Wall indicate the locations needed to be drilled. Using a 1/4 in Drill Bit (not included), drill completely through the plastic.
  • Page 37 SECTION 4 (CONTINUED) TOOLS AND HARDWARE REQUIRED ADW (x5) • Place the Climbing Wall Pole (CBY) into one of the notches on the Climbing Wall Panel (CBX) as shown. Secure the Pole to the Climbing Wall with the hardware indicated. 3.14...
  • Page 38 TOOLS AND HARDWARE REQUIRED SECTION 4 (CONTINUED) / OUTILS ET ACCESSOIRES REQUIS / SECTION 4 (SUITE) INSTRUMENTAL Y HERRAJE REQUERIDOS SECCIÓN 4 (CONTINUACIÓN) ADV (x5) • Place a Climbing Wall Panel (CBX) that is attached to the Climbing Wall Pole (CBY) in the location shown. Make sure •...
  • Page 39 SECTION 4 (CONTINUED) TOOLS AND HARDWARE REQUIRED ADV (x5) ADW (x5) • Place the other Climbing Wall Panel (CBX) that is not attached to the Climbing Wall Pole (CBY) in the location shown. Make sure the Climbing Wall Panel is oriented as shown in the image below. Attach this Panel to the Wall Pole using the Screws (ADW) and the Right Vertical Pole (CBJ) using the Screws (ADV).
  • Page 40 SECTION 4 (CONTINUED) TOOLS AND HARDWARE REQUIRED ASF (x2) ARV (x3) CHX (x2) • Place the Chalkboard (CBZ) between the Deck (CBR) and the A-Frame Deck Tube (CBV). Secure the bottom of the Chalkboard with two Screws (ASF). Attach the top of the chalkboard with the hardware indicated. Bottom of Chalkboard-complete for both sides...
  • Page 41: Roof Assembly

    ROOF ASSEMBLY HARDWARE REQUIRED Hardware Bag ASE (x4) DXY (x8) EIG (x4) BRL (x4) ADV (x48) BTS (x8) ARO (x4) ARL (x8) EIH (x8) ARN (x8) PARTS REQUIRED CONTENTS OF BOX 3 CCA (x2) CCB (x8) CONTENTS OF BOX 4 CCC (x4) TOOLS REQUIRED 3/16 in/po (≈5 mm)
  • Page 42 SECTION 5 (CONTINUED) TOOLS AND HARDWARE REQUIRED 3/16 in/po (≈5 mm) ARN (x4) EIG (x4) ARO (x4) BRL (x4) • Secure the Round Roof Tubes (CCA) to the A-Frame and Climbing Wall Deck Tubes (CBV, CBW). Secure the Round Roof Tubes with the hardware indicated.
  • Page 43 SECTION 5 (CONTINUED) TOOLS AND HARDWARE REQUIRED 3/16 in/po (≈5 mm) 1/2 in/po (≈13 mm) ARN (x4) BTS (x8) DXY (x8) ASE (x4) ARL (x8) • Connect two Roof Trusses (CCB) together as shown. Repeat this step three more times to connect the other six trusses. The holes in the trusses need to face up.
  • Page 44 SECTION 5 (CONTINUED) TOOLS AND HARDWARE REQUIRED ADV (x24) • Attach the Roof Panels (CCC) to the Roof Trusses (CCA), and secure the panels as shown. The notch at the top of the panel will line up with the top of the Trusses. The Roof Panels placed on top need to have a notch as shown.
  • Page 45 SECTION 5 (CONTINUED) TOOLS AND HARDWARE REQUIRED ADV (x24) • Connect the two remaining Roof Panels (CCC) with the hardware indicated. WARNING Use extreme caution when standing on ladders to CAUTION perform assembly steps. Follow all warnings and cautions on the ladder. Failure to follow all of these instructions and warnings could lead to serious Do not overtighten.
  • Page 46 SECTION 5 (CONTINUED) TOOLS AND HARDWARE REQUIRED EIH (x8) • Insert the Dome Caps (EIH) into the ends of the Roof Trusses (CCB). Tap lightly with a Rubber Mallet if necessary.
  • Page 47: Slide And Accessories Assembly

    SLIDE AND ACCESSORIES ASSEMBLY HARDWARE REQUIRED Hardware Bag ARX (x3) ARM (x3) ARL (x6) Hardware Bag ARM (x1) ARU (x1) BZV (x1) DXY (x1) BTS (x1) BRL (x2) Hardware Bag BZU (x2) ASH (x1) BZT (x1) ARM (x2) BRL (x1)
  • Page 48 SLIDE AND ACCESSORIES ASSEMBLY PARTS REQUIRED CONTENTS OF BOX 5 CCE (x1) CAB (x1) CCD (x1) CAA (x1) LARGE PLASTIC PARTS BEK (x1) TOOLS REQUIRED 1/2 in/po (≈13 mm) 1/2 in/po (≈13 mm) 5/16 in/po (≈8 mm) 3/16 in/po (≈5 mm)
  • Page 49 SECTION 6 (CONTINUED) TOOLS AND HARDWARE REQUIRED 5/16 in/po (≈8 mm) • Use the Electric Drill to drill a hole through each of the three indents at the top of the slide (BEK).
  • Page 50 SECTION 6 (CONTINUED) TOOLS AND HARDWARE REQUIRED 3/16 in/po (≈5 mm) 1/2 in/po (≈13 mm) ARX (x3) ARM (x3) ARL (x6) • Attach the Slide (BEK) to the Deck (CBR) with the hardware indicated. CAUTION • Slide can get hot in direct sunlight. It is not recommended that a slide be installed facing south.
  • Page 51 SECTION 6 (CONTINUED) TOOLS AND HARDWARE REQUIRED 3/16 in/po (≈5 mm) ARU (x1) 1/2 in/po (≈13 mm) BTS (x1) ARM (x1) BRL (x2) DXY (x1) • Attach the Binocular Bracket (BZV) to the Climbing Wall Deck Tube (CBW) and secure with the hardware indicated. Attach the Binoculars (CCE) to the Bracket with the hardware indicated.
  • Page 52 SECTION 6 (CONTINUED) TOOLS AND HARDWARE REQUIRED 1/2 in/po (≈13 mm) 3/16 in/po (≈5 mm) ASH (x1) 1/2 in/po (≈13 mm) BZT (x1) ARM (x2) BRL (x1) BZU (x2) • Slide the Hex Bolt (ASH) into the center hole of the Wheel Clicker Hub (CAB) as shown. Attach the Wheel Clicker Hub to the A-Frame Deck Tube (CBV) and secure with the hardware indicated.
  • Page 53: Swing Assembly

    SWING ASSEMBLY HARDWARE REQUIRED Hardware Bag BZY (x6) ABK (x3) ASM (x6) ARM (x6) EIG (x6) ARL (x3) ASL (x3) CUY (x1)
  • Page 54 SWING ASSEMBLY PARTS REQUIRED CONTENTS OF BOX 2 / CCI (x1) CCG (x3) CCJ (x1) CONTENTS OF BOX 5 BKT (x2) BKU (x1) CCF (x3) CCH (x3) TOOLS REQUIRED 1/2 in/po (≈13 mm) 3/16 in/po (≈5 mm)
  • Page 55 SECTION 7 (CONTINUED) TOOLS AND HARDWARE REQUIRED 3/16 in/po (≈5 mm) EIG (x6) 1/2 in/po (≈13 mm) ASL (x3) ARL (x3) ABK (x3) CUY (x1) ARM (x6) BZY (x6) • Place the Plastic Seat (CCF) on top of the Under-Deck Swing Tube (CCG) and secure with the hardware indicated. After securing the seat to the tube, place the Square Plugs (EIG) into the ends of the Tube.
  • Page 56 SECTION 7 (CONTINUED) TOOLS AND HARDWARE REQUIRED ASM (x6) • Attach a Quick Link (ASM) to both ends of each Soft Grip Chain. Attach the Soft Grip Chains (CCH) to the Eye Bolts (ASL) in the Under-Deck Swing Assembly. • Attach the Under-Deck Swing Assembly to the hooks located on the underside of the Deck.
  • Page 57 SECTION 7 (CONTINUED) TOOLS AND HARDWARE REQUIRED • Attach the Belt Swings (BKT) and the Trapeze Swing (BKU) to the Swing Hardware as shown.
  • Page 58: Maintenance Instructions

    MAINTENANCE INSTRUCTIONS If routine checks and maintenance procedures are not done, the equipment could overturn and/or become a hazard. At the beginning of each play season: • Tighten all hardware. • Lubricate all metallic moving parts. • Check all protective coverings on bolts, pipes, edges and corners. Replace if they are loose, cracked or missing. •...
  • Page 59 ADDITIONAL WARNINGS WARNING THIS PRODUCT IS INTENDED FOR THE USE BY CHILDREN • Instruct children not to use the equipment in a manner other FROM AGES 3 TO 12, AND IS FOR RESIDENTIAL USE ONLY. than intended. Do not install over concrete, asphalt, packed earth, or any •...
  • Page 60: Warranty

    2. This warranty is nontransferable and is expressly limited to the repair or replacement of defective playground equipment. If the equipment is defective within the terms of this warranty, Lifetime Products, Inc. will repair or replace defective parts at no cost to the purchaser.

Table of Contents