Load Reading
Check power supply to force transducer by unplugging the cable assembly from the force transducer.
Measure voltage at the cable connection between A (+12/24v) and C (ground) at the connector.
!
Correct?
NO
!
!
Complete the force transducer calibration in operator's and calibration manual. If force
© PAT
Rev. - 12/18/00 // CSH.
PREVIOUS PAGE
Refer to Drawing 1 in Section 12.
Check linerider for any visual damages and check continuity in:
force transducer cable assembly (A to A, B to C, C to B, note the wiring of the
connector)
junction box (5 socket to 14 pin: A to D, B to C, and C to A)
cable reel, and cable assembly 14 pass connectors B to B, C to C, and D to D.
YES
Check force transducer for any visual damages.
transducer can not be adjusted replace force transducer.
Refer to Procedure 5 and Drawing 1 or 7.
Refer to Drawing 1.
No Fault in cable or wiring.
END
19
190118_-.DOC

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DS 350 and is the answer not in the manual?

Questions and answers

Table of Contents