Advertisement

Quick Links

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the E200 and is the answer not in the manual?

Questions and answers

Summary of Contents for Enair E200

  • Page 1 –...
  • Page 2 Email: info@enair.es Document revised: June 2018 All illustrations and photographs Copyright © ENAIR Energy S.L. No part of this manual may be transmitted into any form by any means without permission from ENAIR Energy S.L. The information given in this user manual is believed to be accurate and reliable at time of printing.
  • Page 3: Table Of Contents

    WIND TECHNOLOGY V1.06.18 CONTENTS 1. INTRODUCTION ..................4 2. SAFETY INSTRUCTIONS, OTHERS CONSIDERATIONS ......5 3. ABOUT SMALL WIND TURBINE ENAIR 200 ..........7 4. CONFORMTY DECLARATION……............8 5. SMALL WIND TURBINE NORMS………………..........8 6. WARRANTY....................9 7. PACKING LIST ..................11 – SWT – BOX ……………....................11 7.1.1 –...
  • Page 4: Introduction

    WIND TECHNOLOGY V1.06.18 1. INTRODUCTION  Objective This manual is to describe the installation and maintenance processes of the E200 wind turbine to ensure correct installation and commissioning. Also making known a little bit of the Enair company.  About Enair Enair works with the illusion of collaborating in the transition to a sustainable energy model, which increasingly have more in weight renewable energy and distributed generation.
  • Page 5: Safety Instructions, Others Considerations

    For this reason, it is necessary that before carrying out any installation, the personnel responsible for it, acquire the necessary knowledge. Only qualified personnel should install or operate the Enair wind turbine. When the rotor/nacelle is accessed, the wind turbine must be in emergency stop.
  • Page 6 Indirect contact with elements that are accidentally live due to an installation fault. Ensure that the drive is earthed to ensure protection against indirect contacts. If during the installation or operation process, questions or doubts arise, you can contact Enair through the following channels: Tel: +34 96 556 00 18 Email: info@enair.es...
  • Page 7: About Small Wind Turbine Enair 200

    WIND TECHNOLOGY V1.06.18 3. ABOUT SMAL WIND TURBINE ENAIR 200 ENAIR is a wind turbine belonging to the mini wind turbine sector with simple operation and easy assembly. The Wind Turbine works downwind and the orientation is passive through the aerodynamics of the blades.
  • Page 8: Conformty Declaration

    The brands currently tested by Enair are: Fronius, SMA, Solis and Aros-Rielo. However, the inverter in these wind turbines will always be supplied by Enair, in order to guarantee compatibility with the wind turbine as well as with the standards applicable in each country.Las directivas aplicadas normalmente en los inversores...
  • Page 9: Warranty

    The warranty claims set forth herein do not cover the transport costs of the wind turbines or defective elements, derived from the return to ENAIR ENERGY S.L. It also does not cover the costs of intervention arising from the disassembly of the defective equipment, nor does it cover Avenida de IBI, 44 –...
  • Page 10 180 days from the date of receipt. If ENAIR ENERGY S.L. determines that the problem with the wind turbine is not due to a material or manufacturing defect, the Customer shall be responsible for the costs of carrying out the tests and processing.
  • Page 11: Packing List

    WIND TECHNOLOGY V1.06.18 7. PACKING LIST The Enair E200 wind turbine comes in its complete purchase in 4 packages, 2 packages are the whole of the wind turbine plus blades, another is the control system and the remaining is the tower.
  • Page 12: Mounting Tools Swt

    Dinamometric since 200Nm 3m textile sling Shackles for tying shackles Recomendaciones Cordless drill with adjustable torque Avenida de IBI, 44 – P.O. 182-03420 | Castalla (Alicante), España P a g e | 12 www.enair.es +34 96 556 00 18 info@enair.es...
  • Page 13: Blades Box

    Textile sling de 6m Textile sling 0.6m Recomendaciones Cordless drill with adjustable torque Torque wrench up to 72Nm Avenida de IBI, 44 – P.O. 182-03420 | Castalla (Alicante), España P a g e | 13 www.enair.es +34 96 556 00 18 info@enair.es...
  • Page 14: Control Box

    7.3.2 Mounting tolos control box: Tools Quantity Screwdriver Star screwdriver Universal pliers Cutting pliers Recomendations Cordless drill with adjustable torque Avenida de IBI, 44 – P.O. 182-03420 | Castalla (Alicante), España P a g e | 14 www.enair.es +34 96 556 00 18 info@enair.es...
  • Page 15: Intallation

    V1.06.18 8. INSTALLATION The installation process may vary depending on the type of tower selected, for the Enair 200 wind turbine, several types of towers are available. These can be square lattice, tubular or cable- stayed. For the explanation of the manual we selected the option of lattice towers because it is the standard model.
  • Page 16 For this work 2 people are recommended, plus the help of the crane. Avenida de IBI, 44 – P.O. 182-03420 | Castalla (Alicante), España P a g e | 16 www.enair.es +34 96 556 00 18 info@enair.es...
  • Page 17 Avenida de IBI, 44 – P.O. 182-03420 | Castalla (Alicante), España P a g e | 17 www.enair.es +34 96 556 00 18 info@enair.es...
  • Page 18 Each cable is labeled unequivocally both at the tip of the cable to be connected, and at the connection terminal. Avenida de IBI, 44 – P.O. 182-03420 | Castalla (Alicante), España P a g e | 18 www.enair.es +34 96 556 00 18 info@enair.es...
  • Page 19: Transport

    Avenida de IBI, 44 – P.O. 182-03420 | Castalla (Alicante), España P a g e | 19 www.enair.es +34 96 556 00 18 info@enair.es...
  • Page 20: Annex 1 - Tower Detail

    V1.06.18 9. TRASNPORT 20ft container A complete Enair 200 wind turbine is located in a 20-foot container with the lattice tower included and completely disassembled. Avenida de IBI, 44 – P.O. 182-03420 | Castalla (Alicante), España P a g e | 20 www.enair.es...
  • Page 21: Annex 2 - Scheme Of Connection

    25 years. Maintenance works: The components of the ENAIR 200 must only be handled by competent technical personnel. Under no circumstances will unqualified personnel be responsible for maintenance operations, unless directly directed by a qualified technician.
  • Page 22 10- Change the tubes of hydraulic Every 4 years (indicative) Every 4 years (indicative) power station. Avenida de IBI, 44 – P.O. 182-03420 | Castalla (Alicante), España P a g e | 22 www.enair.es +34 96 556 00 18 info@enair.es...
  • Page 23 In case of any crack or surface damage due to a collision, you must putty and paint with the recommended paint. Edge of attack Paint inspection Inspect the entire exterior surface of the ENAIR. If necessary, repaint. Características de la pintura White Paint Polyurethane paint, RAL 9003...
  • Page 24 Torque Socket wrench of 21 - 127 Nm See Appnedix 3, for torque details. Torque wrenches Avenida de IBI, 44 – P.O. 182-03420 | Castalla (Alicante), España P a g e | 24 www.enair.es +34 96 556 00 18 info@enair.es...
  • Page 25 - ISO 6743 HM - MIL-L24459 Required about 500gr. Tools: Standard grease nipple for grease nipples. Avenida de IBI, 44 – P.O. 182-03420 | Castalla (Alicante), España P a g e | 25 www.enair.es +34 96 556 00 18 info@enair.es...
  • Page 26 Norm ASTM D1478. Caution: the hydraulic unit oil and sleeves must be changed every 4 years. Avenida de IBI, 44 – P.O. 182-03420 | Castalla (Alicante), España P a g e | 26 www.enair.es +34 96 556 00 18 info@enair.es...
  • Page 27 Fast connectors: Visual check of the integrity and tightness of the quick connectors. Avenida de IBI, 44 – P.O. 182-03420 | Castalla (Alicante), España P a g e | 27 www.enair.es +34 96 556 00 18 info@enair.es...
  • Page 28 Annex 3. Avenida de IBI, 44 – P.O. 182-03420 | Castalla (Alicante), España P a g e | 28 www.enair.es +34 96 556 00 18 info@enair.es...
  • Page 29 Surface inspection: Inspect the entire surface of the tower for corrosion, open welds or bent profiles. Avenida de IBI, 44 – P.O. 182-03420 | Castalla (Alicante), España P a g e | 29 www.enair.es +34 96 556 00 18 info@enair.es...
  • Page 30 WIND TECHNOLOGY V1.06.18 ANNEX 1 Tower details. Avenida de IBI, 44 – P.O. 182-03420 | Castalla (Alicante), España P a g e | 30 www.enair.es +34 96 556 00 18 info@enair.es...
  • Page 31 Avenida de IBI, 44 – P.O. 182-03420 | Castalla (Alicante), España P a g e | 31 www.enair.es +34 96 556 00 18 info@enair.es...
  • Page 32 + tower apply to the tower. All towers not supplied by Enair must be factory approved and must be accompanied by their dynamic calculation memory.
  • Page 33 15.70 2.67 14.60 ENAIR recommend use always the K=8 values Note: In addition to the above measurements, the foundation should protrude 0.2m above ground level to prevent the effect of moisture on the base of the tower. Avenida de IBI, 44 – P.O. 182-03420 | Castalla (Alicante), España...
  • Page 34 WIND TECHNOLOGY V1.06.18 ANNEX 2 – Basic connection scheme Avenida de IBI, 44 – P.O. 182-03420 | Castalla (Alicante), España P a g e | 34 www.enair.es +34 96 556 00 18 info@enair.es...
  • Page 35 WIND TECHNOLOGY V1.06.18 ANNEX 3 – Torque table * in red the torque more used in the small wind turbine Enair 200. Avenida de IBI, 44 – P.O. 182-03420 | Castalla (Alicante), España P a g e | 35 www.enair.es +34 96 556 00 18 info@enair.es...

Table of Contents