Page 1
ES & HU Installation, Operation a n d M a i n t e n a n c e M a n u a l A Division of Sussman-Automatic Corporation 43-20 34th Street, Long Island City, NY 11101 • (718) 937-4500 1-800-238-3535 •...
nstallation, Operation & Maintenance Manual TABLE OF CONTENTS Model No. _____________________________________ Dimensional Information and Boiler Serial No. _______________________________ Component Identification ....3 Dimensional & Clearing Specifications ..4 National Board No.
Installation, Operation & Maintenance Manual Wiring Diagram (See Note 6) Power Circuit and Control Circuit use different voltage ES/SSB/CU 81600 Automatic Blowdown System (optional) Three Phase Main Power Supply NOTES: 1. Power Terminal Block only on boilers with two or more contactors. 2.
Installation, Operation & Maintenance Manual Installation 3. Do not install boiler in any location where water REFER TO NATIONAL AND ALL APPLICABLE LOCAL could freeze. CODES FOR SPECIFIC INSTALLATION REQUIREMENTS. 4. Do not install boiler outdoors. 1. The boiler should be mounted on a solid, level foundation. 5.
Installation, Operation & Maintenance Manual Wiring ALL ELECTRICAL WIRING MUST BE PERFORMED BY A QUALIFIED ELECTRICIAN IN ACCORDANCE WITH NATIONAL AND LOCAL ELECTRICAL CODES. Assure that the power voltage and phase 4. Boiler control circuit is 120 Volt*. Unless boiler has an C A U T I O N being supplied to the boiler matches the power voltage and optional step down transformer, a separate 120 Volt...
Installation, Operation & Maintenance Manual Pre-Operation Check (All Boilers) LWCO/PUMP CONTROL OPERATION AND TESTING 1. All valves for incoming water supply are to be fully opened. Boilers equipped with an auxiliary low water cut-off Main disconnect switch is to be in the "on" position. Boiler main control with a manual re-set button (required as switch is to be in the "on"...
Installation, Operation & Maintenance Manual Setting Pressure Controls 1. To set the controls turn the operating pressure 5. Once the high limit control is set proceed to set the controller to its highest setting operating pressure control in the same way as the high pressure was set as outlined in steps 2-4.
nstallation, Operation & Maintenance Manual Operation C A U T I O N With main disconnect “OFF” tighten all 7. With steam demand, the boiler steam pressure will decrease. When the boiler pressure has dropped below electrical connections before energizing boiler to prevent the operating pressure control differential set amount, arcing, carbonizing of contact and/or overheating the contactor(s) will re-energize.
Page 11
Installation, Operation & Maintenance Manual Blowdown (cont.) AUTOMATIC BLOWDOWN INSTRUCTIONS (PN ES81600) 1” NPT, Starts, stops and blows down the boil- er automatically, utilizing a programmable time clock a time- delay relay and motorized ball valve. C A U T I O N If the blowdown valve is plumbed into a blowdown tank, the boiler can be discharged at operating MIN*...
Installation, Operation & Maintenance Manual Digital Timer - Operation Instructions TO SET TIME & DAY OF CLOCK 1. Hold down the image of clock button for steps 2-4 2. Press the “Day” button to cycle through the days which are listed on the top line 3.
PROGRAMMING WORKING ON BOILER. F or electric steam boilers equipped with Automatic Sussman Electric Steam Boilers are designed for years of Blowdown Systems trouble-free performance. To establish a good preventative ES 81600, refer to the maintenance program, we suggest that the facility...
Installation, Operation & Maintenance Manual Standard Equipment for ES & HU Optional Equipment AUXILIARY LOW WATER CUT OFF HIGH PRESSURE WATER FEED SYSTEM • For model ES12-72 PN ES38002A • For model ES & HU boilers PN ES81017MR (with manual reset). •...
Installation, Operation & Maintenance Manual Optional Equipment VACUUM BREAKER SYSTEMS BLOWDOWN SEPARATORS (see page 17) • For model ES boilers PN ES89369 • For models ES12-48 - PN BDT-ASME36 A vacuum breaker will prevent a boiler from flooding as a •...
4" 2" 18" 54" The Sussman Separator design incorporates a water seal at Maximum Boiler Working Pressure: 250 psi the outlet which permits the operator to introduce cold Maximum Blowdown Separator Pressure: 65 psi water from the bottom to mix with the hot water and boil- Blowdown Separators are sized in accordance with National Board Standards er steam blowdown in the separator.
Installation, Operation & Maintenance Manual Gauge Glass Installation IMPORTANT NOTE: Read all warnings and instructions Top Gauge before performing installation or maintenance. Safety glass- Fitting es and gloves should be worn at all times when working with or examining water gauge glass and connections. Pressure in generator to be at zero before proceeding.
Installation, Operation & Maintenance Manual Gauge Glass Installation - Use and Care DO NOTs MAINTENANCE Examine the gauge glass regularly for any signs of • DO NOT use glass if it contains any scratches, chips, or clouding, scratching, erosion, or corrosion. The glass any other visible signs of damage.
Installation, Operation & Maintenance Manual Element Replacement READ INSTRUCTIONS COMPLETELY BEFORE STARTING WORK C A U T I O N Before Installing your new elements be sure the McDonnell Miller low water cut-off and aux. low water cutoff (if supplied) is operating properly. The float chamber and lower Boiler with 1”...
Installation, Operation & Maintenance Manual Water Quality Information for Carbon Steel Boilers For optimum results, the feedwater supply should be tested prior to initial start- up. If the mineral content exceeds the following recommended limits, various external treatment processes (water softener, reverse osmosis, etc.) may be used to correct the problem.
Page 24
Designed, Engineered A Division of Sussman-Automatic Corporation and Assembled in the 43-20 34th Street, Long Island City, NY 11101 • (718) 937-4500 U S A 1-800-238-3535 • Fax: (718) 937-4676 • email: seb@sussmancorp.com www.sussmanboilers.com PUR 101137 5.18...
Need help?
Do you have a question about the ES12-18 and is the answer not in the manual?
Questions and answers