commissioning
CDA3000 Operation Manual
The D
M
as from version 3.0 makes commissioning easier,
RIVE
ANAGER
especially the adaptation of your drive. It should be used specifically
when commissioning with "SFC" or "FOR" mode.
The following is an illustration of the commissioning procedure based on
the example of the preset solution ROT_2.
Precondition:
• Inverter module is fully connected.
• Control terminals are wired as per terminal assignment 3,
see page 3-15.
• The motor with encoder planned for the application is correctly
connected.
• All data of the motor (rating plate data) and the encoder are
available.
Attention: Make sure that the rotating drive of your machine cannot
cause any damage during commissioning (such as by
overshooting a stop limit) and that there are no personnel
inside the danger zone.
The main window contains the "Initial commissioning" button. Click on it to
open up the Wizard, which will guide you in four steps through the
commissioning process.
4 Commissioning
4-6

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CDA32.004 and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF