©2017 Lennox Industries Inc.
Dallas, Texas, USA
THIS MANUAL MUST BE LEFT WITH THE
HOMEOWNER FOR FUTURE REFERENCE
WARNING
Improper installation, adjustment, alteration, service
or maintenance can cause property damage, personal
injury or loss of life. Installation and service must be
performed by a licensed professional HVAC installer or
equivalent, service agency, or the gas supplier.
IMPORTANT
The Clean Air Act of 1990 bans the intentional venting of
refrigerant (CFCs, HCFCs and HFCs) as of July 1, 1992.
Approved methods of recovery, recycling or reclaiming
must be followed. Fines and/or incarceration may be
levied for noncompliance.
IMPORTANT INFORMATION FOR INSTALLER
This unit has a delay relay that delays the supply blower "ON" for 1 second and keeps the blower "ON" for 45
seconds on all fan and cooling demands. For more details, refer to page 17 for unit sequence of operation.
100%
2
1
CFM
1
SECOND
COOLING
DELAY
DEMAND
Page 1
INSTALLATION
INSTRUCTIONS
Merit
Series
®
CBA25UH Air Handler Units
MULTI-POSITION AIR HANDLERS
507751-01
12/2017
Table of Contents
Requirements ................................................................3
Installation .....................................................................4
Operation ....................................................................17
Shipping and Packing List
Package 1 of 1 contains:
1 - Assembled air handler unit factory-equipped for upflow
or horizontal air discharge application (includes upflow
and horizontal drain pans and preinstalled air filter).
Check the air handler for shipping damage; if found, im-
mediately contact the last carrier. Check the unit rating
plate to confirm that delivered unit matches order.
IMPORTANT: Special procedures are required for clean-
ing the all-aluminum coil in this unit. See page 18 in this
instruction for information.
3
4
100%
CFM
OFF
45
SECS
Need help?
Do you have a question about the CBA25UH and is the answer not in the manual?
Questions and answers