Download Print this page

Sample Tube Extension Lengths; Rack Mounting Option; Monitor Installation - Thermo Scientific 5030i SHARP Instruction Manual

Synchronized hybrid ambient real-time particulate monitor

Advertisement

Sample Tube
Extension Lengths
Rack Mounting

Monitor Installation

Thermo Fisher Scientific
There is one standard length of heated sample tube at one meter. Sample
tube extensions are used for added height.
One limiting factor when siting the Model 5030i is placement within a
standard 19-inch rack mounting. Future planning should be made to
Option
reserve the topmost rack mounting position available due to the vertical
positioning of the sample tube directly from the roof into the top of the
Model 5030i. In addition, modification to the rack cabinet to
accommodate the vertical tubing connection also needs to be considered
prior to installation. For more information, see Chapter 9
Equipment".
Review the following installation steps prior to field installation.
Once all height requirements are established, the following steps are usually
taken to complete the installation.
1. Remove cover to the 5030i base instrument and inspect for proper
filter tape installation.
2. Place 5030i unit in place of intended operation.
3. Attach the insulated heater tube assembly to the 5/8-inch OD tube on
top of the 5030i
(Figure
2–6).
Model 5030i SHARP Instruction Manual
Installation
Setup
"Optional
2-13

Advertisement

loading