GE M-Pact Plus Operating & Installation Instructions Manual page 16

Air circuit breakers
Hide thumbs Also See for M-Pact Plus:
Table of Contents

Advertisement

BREAKER
6.3.22 Check the wires with a tester:
7-8 Open contact
7-9 Closed contact.
10-11 Open contact.
10-12 Closed contact.
6.3.23 Fit the circuit breaker and set it in connected position (red)
6.3.24 Check the wires with a tester:
13-14 Open contact
13-15 Closed contact.
16-17 Open contact.
16-18 Closed contact.
The standard configaration of the carriage switch circuits to sense the breaker
position during racking is:
2 at DISCONNECTED (1 NO + 1 NC)
2 at TEST (1 NO + 1NC)
2 at CONNECTED (1 NO + 1NC)
The 6 circuits may be re-configured by customer to give up to:
3 at DISCONNECTED (1 NO + 1 NC)
6 at TEST (1 NO + 1 NC)
6 at CONNECTED (1 NO + 1 NC)
IN any combination up to the 6 circuit maximum.
6.3.22 Prüfen mit Durchgangsprüfer:
7-8 Kein Durchgang
7-9 Durchgang
10-11 Kein Durchgang
10-12 Durchgang
6.3.23 Schalter voll einfahren (Rot)
6.3.24 Prüfen mit Durchgangsprüfer:
13-14 Kein Durchgang
13-15 Durchgang
16-17 Kein Durchgang
16-18 Durchgang
Die Werkskonfiguration des Meldeschalters ist wie folgt:
2 Kontakte Trennposition (1 Öffner, 1 Schließer)
2 Kontakte Testposition (1 Öffner, 1 Schließer)
2 Kontakte Einfahrposition (1 Öffner, 1 Schließer)
Die 6 Kontakte können so modifiziert werden das sich maximal folgende
Zuordnung erreichen lässt:
3 Kontakte Trennposition (1 NO + 1 NC)
6 Kontakte Testposition (1 NO + 1 NC)
6 Kontakte Einfahrposition (1 NO + 1 NC)
14

Advertisement

Table of Contents
loading

Table of Contents