Parkray Inset Chevin 20B Installation And Operating Instructions Manual

Advertisement

Quick Links

Inset Chevin 20B
Installation and Operating Instructions
JINCHW09 Rev A 12/05/14

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Inset Chevin 20B and is the answer not in the manual?

Questions and answers

Summary of Contents for Parkray Inset Chevin 20B

  • Page 1 Inset Chevin 20B Installation and Operating Instructions JINCHW09 Rev A 12/05/14...
  • Page 2 Inset Chevin 20B Technical Specification INSET CHEVIN 20B Trevilla Park, Slaughterbridge, Camelford, Cornwall, PL32 9TT BS/EN 13229 UKAS# 0692 Stove Mass: 127.67kg NOMINAL OUTPUT: 15.8KW NOMINAL OUTPUT TO WATER: 10.7KW NOMINAL OUTPUT TO SPACE: 5.1KW CO Emission at 13% O : 0.33%...
  • Page 3: General Guidance

    When installing or servicing this stove, care should OMPETENT ERSONS CHEME be taken to avoid the possibility of personal injury. Parkray Ltd recommend that this stove is installed by a member of an accredited competent persons ODIFICATION scheme e.g. HETAS. No unauthorized modification of this appliance should be carried out.
  • Page 4: Installation

     Move furniture, ornaments etc away long periods without first adjusting the controls to  Place a fireguard in front of stove a safe setting. Careful air supply control should be  Check the chimney breast for signs of excessive exercised at all times.
  • Page 5: Hearth Requirements

    Building Regulations Approved Document J or a installation. Parkray Ltd cannot be held twin-walled insulated stainless steel flue to BS EN responsible for any fault arising through incorrect 1856 can be used.
  • Page 6: Clearances To Combustible Materials

    Parkray Ltd cannot be held responsible for any Within 2300mm of At least 600mm above any part fault arising through incorrect use or installation. an adjoining or of the adjacent building within...
  • Page 7 A combustible fire surround with a depth of up to 2. Remove the fuel retainer by lifting off of its 100mm requires a minimum clearance of 75mm supports and remove from firebox. from the side of the stove. For combustible fire surrounds with a depth in excess of 100mm this clearance must be increased to 200mm.
  • Page 8 4. Remove the bricks by sliding forward so they are clear of their supports and tilting the bottom edge into the fire box. 6. Remove the baffle by sliding it forward until it reaches its stop. Then lift and slide forward until clear of its supports and lower into the firebox.
  • Page 9: Installing The Stove

    Installing the Stove installation of the heating and hot water system. 1. Check positions of pipe connections. Parkray Ltd cannot accept responsibility for any 2. Make suitable access holes so you can access consequential loss, however caused, due to under...
  • Page 10: Flue Connection

    If a common flow and return is used, these should If connecting to an existing masonry chimney it is also be taken from diagonally opposite sides of recommended that a flue forming pipe (short the boiler, and plugs inserted into the sockets not length of flue pipe) is used and the void between used.
  • Page 11 Four Tapping System Time Switch Room Thermostat High Limit Thermostat 90°C Circulating Pump Low Limit Thermostat (45°C) Drain Cock Two Tapping System Time Switch Room Thermostat High Limit Thermostat 90°C Circulating Pump Drain Cock Low Limit Thermostat (45°C) Injector Tee Wiring Diagram for general guidance only All electrical work must be carried out by a competent electrician in accordance with the rules in force and the...
  • Page 12: Commissioning And Handover

    OCOMOTIVE RATE etc, as these could be damaged and could Your Parkray Ltd Stove is fitted with a locomotive potentially create a fire hazard (For more type grate. So that de-ashing can be carried out information read the ‘Material Clearance’ section cleanly and easily, it is riddled from the outside of of these installation instructions).
  • Page 13 AFFLE PERATION IGHTING Your Parkray Ltd Stove if fitted with a sliding We recommend that you have two or three small baffle. The baffle needs to be slid into its open fires before you operate your stove to its position when lighting and re-fuelling your stove.
  • Page 14: Recommended Fuels

    ECOMMENDED UELS or fly ash that could lead to blocked flueways and dangerous fume emission. Parkray Ltd recommends that approved smokeless fuels are burnt in this appliance. If the baffle is removed the chimney/flueway can be swept through the appliance.
  • Page 15: Troubleshooting

    Rope - Check the rope around the door. If rope is Trouble Shooting becoming detached, use Parkray Ltd rope glue to reattach it. If the rope is in a poor condition, a Check that – replacement rope kit may be ordered from the Parkray Ltd spares range.
  • Page 16: Spares Information

    Spares Information INGLE PARES SINGLE DOOR HCE09/008 DOOR HANDLE DOOR GLASS AVA08/029MB HCE09/102 ROPE SEALING KIT DOOR CATCH SCPCB900SDRSK ASSEMBLY TDI05/ARRT/011MB GLASS CLIP HHR08/046 GLASS GASKET HCE09/101 GLASS CLIP SCREW FSJM05008SS JINCHW09 Rev A 12/05/14...
  • Page 17: Right Hand Door

    OUBLE PARES LEFT HAND DOOR DOOR GLASS TDI05/008 HCE09/031 GLASS CLIP GLASS GASKET HHR08/046 HCE09/030 GLASS CLIP SCREW ROPE SEALING KIT FSJM05008SS SCPCB900DDRSK IGHT RIGHT HAND DOOR GLASS CLIP SCREW HCE09/009 FSJM05008SS GLASS CLIP HHR08/046 DOOR HANDLE AVA08/020MB GLASS GASKET HCE09/030 DOOR CATCH ROPE SEALING KIT...
  • Page 18 SSEMBLY PARES BAFFLE SUPPORT SLIDER KNOB HCW09/ARRT/013 HCE05/040M BAFFLE HCW09/ARRT/011 BRICK LEFT: HCW09/051A RIGHT: HCW09/051B HINGE HH06/050 HINGE PIN FRRE08-1.75 GRATE BARS UPPER: 112/032 FUEL RETAINER LOWER: 112/033 HCW09/ARRT/025 REAR GRATE SUPPORT HCW09/ARRT/021 CATCH BAR SINGLE DOOR: HCW09/ARRT/017 OPERATING TOOL CAM BAR DOUBLE DOOR: ASHPAN...

Table of Contents