PWM-T210
Marking the Wall
Figure 7
1.
Align the center viewing port from the
carton template to the wall. Match the
center of viewing port to the center of
viewing height desired (Figure 7).
Marking the Bottom Mounting Points
CAUTION:
The lag bolts must be secured to the center of a stud. Use a commercially available stud finder to locate the studs
nearest to your center viewing mark.
16"
Wall Plate
Figure 9
1.
Place the upper portion of the bottom wall
plate to the reference line and mark the four
(4) lag bolt mounting points through the
wall plate slots on the wall (Figure 9).
2.
Level the wall plate with the reference
arrow pointing up to the ceiling.
Installation Instructions
Viewing Port
Center
Mark the Wall
Wall Structure
Level
Mounting Slots
Wall Structure
VIEWING PORTS
Figure 8
2.
Mark a line on the bottom of the
carton template (Figure 8).
Drill Gun
Figure 10
3.
Pilot holes are recommended. Use a 1/4"
drill bit to drill where your markings are
located (Figure 10). These pilot holes
will be for the lower mounting plate.
CENTER OF
VIEWING LINE
MARKING THE
LINE
Pilot Holes
Page 7