4 Software Loading
4.1
Set up
General Test set up to perform SW loading. All necessary hardware for this test set up is
documented in the Mechanical or Electrical Equipment list.
US B
ACT IVAT ION
DONGLE
4.2
Computer
IBM compatible computer is required. The computer should include at least two USB-
ports. Refer to Equipment List for minimum requirements.
4.3
USB Activation Dongle
A USB Activation Dongle is required for activation in EMMA III. The USB Activation
Dongle should be connected to a USB-port on the computer. Refer to the EMMA III
Homepage available from CSPN, for installation instructions.
4.4
Sony Ericsson programming cable – DCU-60
The cable is the interface between the computer and the phone. The DCU-60 cable
should be connected to a USB-port on the computer.
1208-3975 1
©
Sony Ericsson Mobile Communications AB
Installation Instruction, Electrical
DCU-60
CABLE
7(11)
Need help?
Do you have a question about the Z555 and is the answer not in the manual?
Questions and answers