Positioning The Blank Nut - Agilent Technologies 1260 Infinity User Manual

Binary pump
Hide thumbs Also See for 1260 Infinity:
Table of Contents

Advertisement

8
Test Functions and Calibration
(System) Pressure Test

Positioning the Blank Nut

To test the complete system's pressure tightness, the blank nut should be
positioned at the column compartment outlet (or the outlet of the last
module before the detector).
If a specific component is suspected of causing a system leak, place the
blank nut immediately before the suspected component, and then run the
(System) Pressure Test again. If the test passes, the defective component is
located after the blank nut. Confirm the diagnosis by placing the blank
nut immediately after the suspected component. The diagnosis is
confirmed if the test fails.
1260 Infinity Binary Pump User Manual
127

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 1260 Infinity and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

1260

Table of Contents

Save PDF