Powering the MV21
Remove the cable guard and route the Ethernet cable from an active port on a 802.3af PoE switch or PoE injector.
Note: Power over Ethernet supports a maximum cable length of 300 ft (100 m).
LED Indicator
Your MV21 is equipped with a LED light on the front of the unit to convey information about system functionality and
performance:
• Flashing Green (2 second interval) - MV is upgrading or initializing for the first time.
• Solid Green - MV is operating nominally.
10
Need help?
Do you have a question about the Meraki MV21 and is the answer not in the manual?
Questions and answers