Bosch BPT-S 5 Hybrid Installation Manual page 266

Solar inverter with integrated battery
Hide thumbs Also See for BPT-S 5 Hybrid:
Table of Contents

Advertisement

Available languages

Available languages

122 | Troubleshooting
Storage system | Installation manual
LED indicator
Lights up
Power
The storage system is
switched on. The
system components
are working.
Solar
The solar generator is
generator
switched on and
ready for operation.
Grid
The grid is available.
Fault
Fault in the storage
system
English
Not lit
The storage system is
not switched on or
was not started up
correctly.
The solar generator is
not switched on or
does not fulfil the
defined value.
The grid is
unavailable.
No faults or errors
Bosch Power Tec GmbH

Advertisement

Table of Contents
loading

Table of Contents