Preparation before disassemble
1.Clean the room for disassemble
2.Identify the area for monitor
3.Check the position that the monitors be placed and the quantity of the monitor ;prepare the area for material flow; according
to the actual condition plan the disassemble layout
4.Prepare the implement, equipments, materials as bellow:
1) Press-fixture
2) working table
3) Screw-driver
4) knife*1
5) glove
6) cleaning cloth
7) ESD protection
item
picture
1
2
Mechanical Instruction
Operation
Disassemble the VESA
bkt
12 screws, After
take off speakers of
connector
disassembly
the
from the monitor take off
17 pcs screw,
Tool
Screw-driver
bezel
Screw-driver
BDL4230E LCD
21
Notes