Sharp DV-NC55U Service Manual page 36

Vcr/dvd combination model
Hide thumbs Also See for DV-NC55U:
Table of Contents

Advertisement

DV-NC55U/C/M
8-27.INSTALLING THE MASTER CAM (AT
REAR SIDE OF MECHANISM CHASSIS)
1. Make sure beforehand that the shifter is at the point as
shown below.
2. Place the master cam in the position as shown below.
Fully turn
clockwise
Fully turn counterclockwise
Face the wide tooth side ward
Note:
See the figure below for the phase matching between the
master cam and the casecon drive gear.
3. Finally fix with the E ring.
Casecon drive gear
Round mark
When installing the master cam,
align the casecon drive gear
round mark with the half-round
notch of master cam.
E ring
(XRESJ30-06000)
Master cam
Figure 8-45-1.
Master cam
Half-round notch
Figure 8-45-2.
8-28. REPLACEMENT OF LOADING MOTOR
• Removal
Apply grease
• Replacement
Remove the loading motor, and install the replacement
loading motor as shown below.
The loading motor pressing-in must be less than 14.7 N
(1,500 gf).
Adjust the distance between motor and pulley to 10.2
+0.2
mm).
–0.2
36
Apply grease
No grease
Figure 8-46.
+0.2
10.2
mm
–0.2
Figure 8-47.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dv-nc55mDv-nc55c

Table of Contents