SLR - SLC - SLD Slide Gate Operator Installation Guide Operator models contained in this manual conform to UL325 standard for use in Class I, II, III, and IV applications Linear PRO Access (800)543-4283 • www.linearproaccess.com...
FOR PAD MOUNTING. "A" OPTIONAL POST MOUNT KIT AVAILABLE: 2120-483 "B" CHAIN SAG ALLOWABLE 1/4-3/8" PER FOOT OF CHAIN Figure 1. Mounting Pad Specifications - 3 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
If the gate stops during travel, you may need to adjust the Open or Close Current Setting or the Maximum Run Timer (see Pages 12-13). - 6 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
OPEN OBSTRUCTION REMOTE CLOSE CLOSE OBSTRUCTION REMOTE OPEN "OO" "CO" "RC" "RO" INPUT ACTIVE INPUT ACTIVE OBSTRUCTION ACTIVE OBSTRUCTION ACTIVE MGT MONITIRING "MM" FUNCTION - 8 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
24 VOLT SOLAR PANEL FOR CONNECTION TO 24 VOLT SOLAR PANEL FOR BATTERY CHARGING. 24 VOLT BATTERY FACTORY CONNECTED TO BATTERIES IN DC MODEL OPERATORS. - 9 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
1 TO 59 SECONDS DOWN TO CYCLE THROUGH OPTIONS SET TIMER VALUE PRESS ENTER TO 1 TO 9 MINUTES SELECT AN OPTION AUTO CLOSE TIMER - 11 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
Page 14
(50-75 lbs.) will activate a reversal should an obstruction occur, but high enough to keep the gate moving under normal conditions without interruption. - 12 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
In paired mode it is only required to have 1 close device per pair of FUNCTION OPTIONS operators if the only entrapment zone is where the gates meet. "RC" REMOTE CLOSE OBSTRUCTION ACTIVE - 13 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
DELAYED OPEN DOWN TO CYCLE THROUGH OPTIONS SETS THIS OPERATOR FOR PRESS ENTER TO DELAYED CLOSE SELECT AN OPTION STAGGER DUAL GATES MODE ONLY - 14 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
✓ NOTE: If CP is set, monitored obstruction input is not required for CONSTANT selected direction of travel. OPEN AND CLOSE BUTTONS BOTH SET FOR CONSTANT PRESSURE PRESSURE MODE - 15 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
When AC power is restored, the operator will resume normal operation. ✓ NOTE: This function will only be displayed in Model SLD operators. - 16 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
The Maintenance Cycle Count can be reset independently from the PRESS ENTER TO INDICATOR AND SETS THE MAINTENANCE SELECT AN OPTION ALERT COUNT TO ZERO operator’s absolute Cycle Count. MAINTENANCE ALERT TRIGGER - 17 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
• 3 Phase AC Motor • AC Motor with DC Motor Backup with Mechanical Braking • AC Motor with DC Motor Backup with Electronic Soft Start/Stop - 18 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
ON monitor’s battery and connection of MGT transmitter. "MM" 2 missed signals result in alarm beeping. ✓ NOTE: Not used for UL 325 6th edition monitored input. MGT MONITORING FUNCTION - 19 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
Run Timer auto close timer expires . While the gate is opening or closing, the number of seconds running time is displayed . - 28 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
Maximum Run Time has been exceeded, the sounder will beep twice every five seconds . The next operation of the gate will clear the indication . - 29 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
5 . Specify name and address of person or company to whom parts are to be shipped . 6 . Specify name and address of person or company to whom invoice is to be sent test - 30 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
THE HOLDER (IT ONLY REPEAT INSPECTION WITH THE BRUSH FITS IN ONE WAY) ON THE OTHER SIDE OF THE MOTOR Figure 13. Replacing DC Motor Brushes - 36 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
If the gate does bind, adjust or fix as required. Failure to keep the gate in good working condition will have adverse effects on the operator. - 37 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
By signing this installation checklist, I/we hereby certify that each item listed and checked above has been covered by the installer and is clearly understood by the customer . Customer’s Signature Date Installer’s Signature Date - 38 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
Need help?
Do you have a question about the SLR and is the answer not in the manual?
Questions and answers