Linear Access SLR Installation Manual

Slide gate operator

Advertisement

Quick Links

SLR - SLC - SLD
Slide Gate Operator

Installation Guide

Operator models contained in this manual
conform to UL325 standard for use in
Class I, II, III, and IV applications
Linear PRO Access
(800)543-4283 • www.linearproaccess.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SLR and is the answer not in the manual?

Questions and answers

Summary of Contents for Linear Access SLR

  • Page 1: Installation Guide

    SLR - SLC - SLD Slide Gate Operator Installation Guide Operator models contained in this manual conform to UL325 standard for use in Class I, II, III, and IV applications Linear PRO Access (800)543-4283 • www.linearproaccess.com...
  • Page 2: Table Of Contents

    Gate Operator Installation Checklist . . . . . . . . . . . . . . . . . . . . . . . . . .36 SLR • SLC • SLD Slide Gate Operator Installation Guide...
  • Page 3: Pre-Installation Information

    MMTC Model IR-55 (165’ range - P/N 2520-441) MMTC Model E3K (28’ range - P/N 2520-031) - 1 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 4: Wiring Specifications

    4090 2045 MODEL SLD POWER WIRING MAXIMUM DISTANCE (FEET) VOLTS & HP WIRE GAUGE SINGLE DUAL 115 VOLTS 1090 1/2-HP 1732 2756 1378 - 2 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 5: Mounting Pad Installation

    FOR PAD MOUNTING. "A" OPTIONAL POST MOUNT KIT AVAILABLE: 2120-483 "B" CHAIN SAG ALLOWABLE 1/4-3/8" PER FOOT OF CHAIN Figure 1. Mounting Pad Specifications - 3 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 6: Gate Bracket And Chain Assembly

    NOTE: IDLER CONFIGURATION MAY APPEAR DIFFERENT DEPENDING ON THE SLIDE GATE INSTALLATION Figure 2. Mounting Gate Bracket to Gate Figure 4B. Tail Mount Chain Path - 4 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 7: Operator Preparation

    3. Route the ground wire to the operator. 4. Connect the ground wire to the operator’s frame. Figure 7. Power Disconnect Box Wiring - 5 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 8: Limit Nuts Rough Adjustment

    If the gate stops during travel, you may need to adjust the Open or Close Current Setting or the Maximum Run Timer (see Pages 12-13). - 6 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 9: Controller Features

    INPUT TERMINALS TERMINALS REVERSE INPUT TERMINALS TERMINALS INPUT TERMINALS ALARM OPEN LOOP SHADOW/RESET LOOP OUTPUT INPUT TERMINALS INPUT TERMINALS TERMINALS Figure 10. Controller Features - 7 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 10: Indicator Descriptions

    OPEN OBSTRUCTION REMOTE CLOSE CLOSE OBSTRUCTION REMOTE OPEN "OO" "CO" "RC" "RO" INPUT ACTIVE INPUT ACTIVE OBSTRUCTION ACTIVE OBSTRUCTION ACTIVE MGT MONITIRING "MM" FUNCTION - 8 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 11: Terminal Descriptions

    24 VOLT SOLAR PANEL FOR CONNECTION TO 24 VOLT SOLAR PANEL FOR BATTERY CHARGING. 24 VOLT BATTERY FACTORY CONNECTED TO BATTERIES IN DC MODEL OPERATORS. - 9 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 12: Operator Accessory Connections

    SINGLE-CHANNEL RADIO RECEIVER MAGLOCK GATE EDGE SENSOR FOR REVERSE (B2) WARNING STROBE OR AUDIBLE SOUNDER WIRELESS GATE EDGE SENSOR TRANSMITTER Figure 11. Operator Accessory Connections - 10 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 13: Basic Controller Programming

    1 TO 59 SECONDS DOWN TO CYCLE THROUGH OPTIONS SET TIMER VALUE PRESS ENTER TO 1 TO 9 MINUTES SELECT AN OPTION AUTO CLOSE TIMER - 11 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 14 (50-75 lbs.) will activate a reversal should an obstruction occur, but high enough to keep the gate moving under normal conditions without interruption. - 12 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 15: Auto Close Timer

    In paired mode it is only required to have 1 close device per pair of FUNCTION OPTIONS operators if the only entrapment zone is where the gates meet. "RC" REMOTE CLOSE OBSTRUCTION ACTIVE - 13 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 16: Operators

    DELAYED OPEN DOWN TO CYCLE THROUGH OPTIONS SETS THIS OPERATOR FOR PRESS ENTER TO DELAYED CLOSE SELECT AN OPTION STAGGER DUAL GATES MODE ONLY - 14 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 17: Advanced Controller Programming

    ✓ NOTE: If CP is set, monitored obstruction input is not required for CONSTANT selected direction of travel. OPEN AND CLOSE BUTTONS BOTH SET FOR CONSTANT PRESSURE PRESSURE MODE - 15 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 18: Shadow Loop Open Prevention

    When AC power is restored, the operator will resume normal operation. ✓ NOTE: This function will only be displayed in Model SLD operators. - 16 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 19: Soft Start/Stop Duration

    The Maintenance Cycle Count can be reset independently from the PRESS ENTER TO INDICATOR AND SETS THE MAINTENANCE SELECT AN OPTION ALERT COUNT TO ZERO operator’s absolute Cycle Count. MAINTENANCE ALERT TRIGGER - 17 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 20: Mid-Travel Stop Position

    • 3 Phase AC Motor • AC Motor with DC Motor Backup with Mechanical Braking • AC Motor with DC Motor Backup with Electronic Soft Start/Stop - 18 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 21: Radio Enable

    ON monitor’s battery and connection of MGT transmitter. "MM" 2 missed signals result in alarm beeping. ✓ NOTE: Not used for UL 325 6th edition monitored input. MGT MONITORING FUNCTION - 19 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 22: Mgt Obstacle Transmitter Delete

    0 – Swing/Slide 1 – Standard Barrier 2 – Slow Barrier 3 – Variable Barrier 4 – Not Used 5 – Swing Override - 20 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 23: Loop Layout Illustration

    Loop Layout Illustration - 21 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 24: Safety Edge Layout Illustration #1

    Safety Edge Layout Illustration #1 - 22 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 25: Safety Edge Layout Illustration #2

    Safety Edge Layout Illustration #2 - 23 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 26: Photoeye Installation Illustration

    Photoeye Installation Illustration - 24 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 27: Picket Gate Installation

    Picket Gate Installation - 25 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 28: Track Gate Installation

    Track Gate Installation - 26 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 29: Dual Gate Installations

    BOTH operators to dual gate (dg) in the Paired Mode setup step under Basic Programming steps. - 27 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 30: Gate Operation

    Run Timer auto close timer expires . While the gate is opening or closing, the number of seconds running time is displayed . - 28 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 31: Error Indications

    Maximum Run Time has been exceeded, the sounder will beep twice every five seconds . The next operation of the gate will clear the indication . - 29 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 32: Troubleshooting

    5 . Specify name and address of person or company to whom parts are to be shipped . 6 . Specify name and address of person or company to whom invoice is to be sent test - 30 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 33: Model Slr Exploded View

    2300-693 Friction Disc (Pair) 2500-2347 Limit Switch 2200-676 4” Pulley for Torque Limiter 2100-261 Detent Plate 2200-877 Bushing for Pulley 2200-028 Detent Spring - 31 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 34: Model Slc Exploded View

    Model SLC Exploded View NOTE: MAY HAVE OPTIONAL TORQUE LIMITER - 32 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 35 2500-440 Limit Switch 2200-676 4” Pulley for Torque Limiter 2100-261 Detent Plate 2200-877 Bushing for Pulley 2200-028 Detent Spring 2300-945 Limit Box Cover - 33 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 36: Model Sld Exploded View

    Model SLD Exploded View NOTE: MAY HAVE OPTIONAL TORQUE LIMITER - 34 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 37 2200-676 4” Pulley for Torque Limiter 2500-2347 Limit Switch 2200-877 Bushing for Pulley 2100-261 Detent Plate 2200-028 Detent Spring 2300-945 Limit Box Cover - 35 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 38: Model Sld Maintenance

    THE HOLDER (IT ONLY REPEAT INSPECTION WITH THE BRUSH FITS IN ONE WAY) ON THE OTHER SIDE OF THE MOTOR Figure 13. Replacing DC Motor Brushes - 36 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 39: Preventative Maintenance

    If the gate does bind, adjust or fix as required. Failure to keep the gate in good working condition will have adverse effects on the operator. - 37 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...
  • Page 40: Gate Operator Installation Checklist

    By signing this installation checklist, I/we hereby certify that each item listed and checked above has been covered by the installer and is clearly understood by the customer . Customer’s Signature Date Installer’s Signature Date - 38 - SLR • SLC • SLD Slide Gate Operator Installation Guide 227968 Revision X22 11-03-2016...

This manual is also suitable for:

SlcSld

Table of Contents