Download Print this page

Nordson 2300 Instruction Sheet page 8

Retrofit melter feeder kit

Advertisement

Instruction Sheet 46-75
Page 8
2300 Retrofit
23. Run the Rechner
Sensor lead through the conduit and plug
into the bottom of the Rechner
Controller.
24. Remove the hood and chute assembly
from the unit and dis-
card.
25. Set the new chute assembly
on the unit. Place the new hood in-
side the chute assembly.
26. Remove the Pump Enclosure
and discard.
27. Secure the sensor bracket over the knock-out
hole on the unit.
(Located
under the pump tower).
28. Remove the electrical
enclosure
on the unit. Install the PM1
Board into the unit. (See Installlation
instructions
on page 10)
29. Remove the knock-out
provided
in the base
and connect the
PM1 conduit to the base of the unit. Connect the PM1 leads (#7
and #4B) to the PM1 board. (See instructions
on page 10)
30. If your unit does not have a knock-out
provided,
use the follow-
ing procedure.
a. Remove the input power terminal.
b. Drill a .875" hole in the bottom of the unit as shown
in Figure 7.
I
INPUT
+---TERMINAL
BLOCK
DRILL
-875"
Figure 7 - Position of the Conduit
Hole for the PM1
Issued l/89
ONORDSON
CORPORATION
1988
All Rights Reserved
Pub. No. 108 428A

Advertisement

loading