Lenovo BladeCenter Virtual Fabric 10Gb Switch Module Installation Manual page 23

High-speed ethernet component that is installed into a bladecenter unit that supports high-speed i/o modules
Hide thumbs Also See for BladeCenter Virtual Fabric 10Gb Switch Module:
Table of Contents

Advertisement

Notes:
a. The switch module takes approximately 60 seconds to complete the POST.
When the switch module is turned on, an LED test occurs. All LEDs are lit
and remain lit during POST; then, all the LEDs except the OK LED turn
off. This indicates normal POST results.
b. To maintain proper airflow, make sure that the ventilation holes on the
front of the switch module are not blocked.
10. Make sure that the LEDs on the switch module indicate that it is operating
correctly (see "Information LEDs" on page 26).
11. If you have another switch module to install, repeat step 3 on page 10 through
step 10; otherwise, go to the next step.
12. Install the SFP+ modules in the switch module. For information and
instructions, see Chapter 3, "Installing and removing a 10 Gb SFP+ module,"
on page 15 and the documentation that comes with the SFP+ module.
13. Attach any cables that are required by the switch module. For additional
information about cabling the switch module, see Chapter 4, "Cabling the
switch module and the SFP+ module," on page 19, the documentation that
comes with the cables, and the optional network devices to which the cables
have been connected. For the locations of the connectors on the BladeCenter
unit, see the documentation that comes with the BladeCenter unit. Then,
continue with the next step.
14. Make sure that the external ports on the switch module are enabled through
one of the management-module interfaces, such as the Web-based interface or
the CLI.
Chapter 2. Installing and replacing a switch module
11

Advertisement

Table of Contents
loading

Table of Contents