Installation - Page 21
2.8
Fit the Optional Vertex Flue
This Vertex Flue kit is only for use with the Ultra 2 Boiler and allows the flue to be run vertically from the boiler. The kit may
be used as supplied or with one, two or three flue extension kits.
It is important that the roof space is ventilated direct to the
outside with a permanent vent. The minimum effective area
of the vent is given in the table opposite.
The table opposite gives the maximum lengths of the
secondary flue which may be connected to the Vertex Flue.
Note: The minimum length of the secondary flue is 0.5 m.
Carefully unpack the kit, do not discard the packaging until all the items are found.
Description
Vertex Flue
Vertical flue adaptor
Sealing plate
Gasket
M4 x 16 lg. hex. hd. screw
No.10 x 25 lg. pozi hd. screw
No.8 x 10 lg. pozi hd. screw
Ceiling template
1.
Carefully unpack the kit, do not discard the packaging until all the items are found. The sealing ring and clamping plate
supplied with the boiler are not required when the Vertex Flue kit is used and should be discarded.
2.
Having noted the clearances needed for installation (flue terminal & boiler), position the wall plate against the wall
(ensure it is level) and mark the position of the flue hole and a minimum of four of the mounting holes. Remove the wall
plate.
Important: Before cutting through the ceiling ensure there are no water pipes, gas pipes or electric cables.
3.
Drill and plug the wall to accept 2½" long woodscrews (not supplied).
4.
Attach the wall plate to the wall. Ensure it is level.
A line is marked at the top of the mounting plate which indicates the centre line of the Vertex Flue. Continue this line
vertically upwards to the ceiling. This line must not be closer than 75 mm to any ceiling joist, this will ensure there is
adequate clearance for fitting and spacing from combustible material (BS5440:1:1990, sub-clause 3.3 and 4.25). Check
that the flue will terminate in accordance with the relevant recommendations given in BS5440:1. The flue must be fitted
with a terminal of a type which has been tested and found satisfactory by British Gas.
5.
Tape the ceiling template to the ceiling with the appropriate edge (indicated on the template) against the wall, and the
line drawn vertically downwards, indicating the flue centre line, lined up with the template centre line.
6.
Mark the position of the four sealing plate fixing holes and the 134 mm diameter hole on the ceiling. Remove the
template and drill and plug the four fixing holes to accept 1 in long No.8 woodscrews (not supplied). Cut the 134 mm
diameter hole in the ceiling as neatly as possible.
7.
The Vertex Flue supplied is 1170 mm long. Up to three flue extensions may be used, which will give a vertex flue length
from 1170 to 4170 mm. The top of the air inlet mesh on the flue must be at least 400 mm above the roof joists, this will
ensure adequate clearance above any insulation materials.
8.
If the distance from the top raised edge of the wall mounting plate to the top of the roof joists is more than 750 mm at
least one flue extension must be used with the Vertex Flue.
9.
Fit the sealing plate over the flue (before any flue extensions are fitted).
Qty
1
1
1
1
4
3
3
1
Boiler models
Minimum air vent area
198 cm
30
265 cm
40
330 cm
50
428 cm
60
527 cm
80
Boiler models
Max. secondary
flue length
at Min. boiler input
30
2m
40
5m
50
5.5m
60
8m
80
10m
2
2
2
2
2
Max. secondary
flue length
at Max. boiler input
5m
5.5m
6m
10m
12m
Need help?
Do you have a question about the Ultra 2 and is the answer not in the manual?
Questions and answers