Dimplex LAK 6IMR-TP Installation And Operating Instructions Manual

Dimplex LAK 6IMR-TP Installation And Operating Instructions Manual

Split air-to-water heat pump with hydrobox
Table of Contents
  • Türkçe

    • Table of Contents
    • 1 Lütfen Hemen Okuyun

      • Önemli Notlar
      • Amaca Uygun KullanıM
      • Yasal Yönetmelikler Ve Kurallar
    • 2 KullanıM Amacı

      • Uygulama Alanı
      • Genel Özellikler
    • 3 Teslimat Kapsamı

      • İç Ünite
      • Kontak Plakası
      • Isı Pompası Kontrol Ünitesi
    • 4 Dış Ünite

      • Kurulum
      • Kışın Ve Mevsimlik Rüzgarlarda Dikkat Edilecek Hususlar
    • 5 İç Ünite Montajı

      • Genel
      • İç Ünitenin Sabitlenmesi
      • Isıtma Sistemi Bağlantısı
    • 6 Devreye Alma

      • Genel
      • Hazırlık
      • Devreye Almada Yöntem Ve Usuller
    • 7 Dış Ünitenin Borulu Iletim Ve Kablosunun Bağlanması

      • Soğutucu Akışkan Boruları
      • Elektrik Bağlantıları
      • Son Iş
      • Sızdırmazlık Testi Ve Tahliye
    • 8 Kontrol Noktası, BakıM Ve Arıza Giderme

      • Devreye Alma Kontrol Listesi
      • BakıM
      • Arıza Giderme
      • Dış Modül Sıcaklık Sensörü Özellikleri
      • İç Ünite Sıcaklık Sensörü Özellikleri
    • 9 Temizlik / BakıM

      • BakıM
      • Isıtma Tarafı TemizliğI
    • 10 Arızalar / Sorun Giderme

    • 11 Devre Dışı Bırakma / Tasfiye

    • 12 Cihaz Bilgisi

  • Polski

    • 1 Należy Niezwłocznie Zapoznać Się Z Tekstem

      • Ważne Wskazówki
      • Użycie Zgodne Z Przeznaczeniem
      • Ustawowe Przepisy I Dyrektywy
    • 2 Zastosowanie

      • Zakres Zastosowania
      • WłaściwośCI Ogólne
    • 3 Zakres Dostawy

      • Jednostka Wewnętrzna
      • Płytka Rozdzielcza
      • Sterownik Pompy Ciepła
    • 4 Jednostka Zewnętrzna

      • Instalacja
      • Środki OstrożnośCI Na Okres Zimy Oraz W Przypadku Wiatrów Sezonowych
    • 5 Montaż Jednostki Wewnętrznej

      • Informacje Ogólne
      • Mocowanie Jednostki Wewnętrznej
      • Przyłącze Od Strony Grzewczej
    • 6 Uruchomienie

      • Informacje Ogólne
      • Przygotowanie
      • Postępowanie Podczas Uruchamiania
    • 7 Przyłącza Przewodów Rurowych I Kabli Do Urządzenia Zewnętrznego

      • Rury Czynnika Chłodniczego
      • Przyłącza Elektryczne
      • Prace Wykończeniowe
      • Kontrola SzczelnośCI I Opróżnianie
    • 8 Punkty Kontrolne, Konserwacja I Usuwanie Usterek

      • Lista Kontrolna Przed Uruchomieniem
      • Konserwacja
      • Usuwane Usterek
      • Charakterystyki Czujnika Temperatury W Urządzeniu Zewnętrznym
      • Charakterystyki Czujnika Temperatury W Jednostce Wewnętrznej
    • 9 Czyszczenie / Pielęgnacja

      • Pielęgnacja
      • Czyszczenie Od Strony Grzewczej
    • 10 Usterki / Diagnostyka

    • 11 Wyłączenie Z Eksploatacji / Utylizacja

    • 12 Informacje O Urządzeniu

  • Unknown

    • Ek / Appendix / Załącznik

    • Boyutlar / Dimension Drawings / Rysunki Wymiarowe

      • Dış Modül Boyutları / Dimension Drawing Outdoor Unit / Rysunek Wymiarowy Urządzenia Zewnętrznego LAK 6IMR-TP / LAK 9IMR-TP
      • Dış Modül Boyutları / Dimension Drawing Outdoor Unit / Rysunek Wymiarowy Urządzenia Zewnętrznego LAK 14ITR-TP
      • Temel Plan / Foundation Plan / Plan Fundamentu
      • İç Modül Boyutları / Dimension Drawing Indoor Unit / Rysunek Wymiarowy Jednostki Wewnętrznej
    • Diyagramlar / Diagrams / Wykresy

      • Eisıtma Çalışma Sınırı / Operating Limits Diagram Heating / Wykres Limitów Pracy, Grzanie
      • Soğutma Çalışma Sınırı / Operating Limits Diagram Cooling / Wykres Limitów Pracy, Chłodzenie
    • AkıM Akış Planları / Circuit Diagrams / Schematy Obwodowe

      • Kontrol / Control / Sterowanie
      • Yük / Load / Obciążenie
      • Bağlantı Planı / Circuit Diagram / Schemat Połączeń
      • Dizin / Legend / Legenda
    • Hidrolik Bağlantı Şeması / Hydraulic Integration Diagrams / Schematy Układów Hydraulicznych

      • Tek Enerjili Sistemleri Bir Isıtma Devresi; Isıtma Ve Dinamik Soğutma / Mono Energy System with One Heating Circuit, Heating and Dynamic Cooling / Instalacja Monoenergetyczna Z Jednym Obiegiem Grzewczym, Ogrzewanie I Dynamiczne Chłodzenie
      • Tek Enerjili Sistemleri Bir Isıtma Devresi; Isıtma Ve Dinamik Soğutma Ve Sıcak Su Hazırlama / Mono Energy
      • Dizin / Legend / Legenda
    • Uygunluk Beyanı / Declaration of Conformity / Deklaracja ZgodnośCI

Advertisement

Available languages

Available languages

LAK 6IMR-TP
LAK 9IMR-TP
LAK 14ITR-TP
Bölmeli hava/su
ısı pompası,
Hydrobox dahil
Sipariş No. / Order no. / Nr zamówienia : 452162.66.14
LAK 14ITR-TP
Split air-to-water
heat pump with
hydrobox
Montaj ve
kullanım kılavuzu
Installation and
Operating Instructions
Instrukcja montażu
i użytkowania
LAK 6IMR-TP
LAK 9IMR-TP
Pompa ciepła
powietrze/woda
typu split z jednostką
Hydrobox
FD 9607

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LAK 6IMR-TP and is the answer not in the manual?

Questions and answers

Summary of Contents for Dimplex LAK 6IMR-TP

  • Page 1 LAK 6IMR-TP LAK 9IMR-TP LAK 14ITR-TP Montaj ve kullanım kılavuzu Installation and Operating Instructions Instrukcja montażu i użytkowania LAK 14ITR-TP LAK 6IMR-TP LAK 9IMR-TP Pompa ciepła Bölmeli hava/su Split air-to-water heat pump with powietrze/woda ısı pompası, hydrobox typu split z jednostką...
  • Page 3: Table Of Contents

    LAK 6IMR-TP - LAK 14ITR-TP Inhaltsverzeichnis Lütfen hemen okuyun ........................ TR-2 1.1 Önemli notlar ............................TR-2 1.2 Amaca uygun kullanım .........................TR-2 1.3 Yasal yönetmelikler ve kurallar ......................TR-2 Kullanım amacı ........................... TR-3 2.1 Uygulama alanı.............................TR-3 2.2 Genel özellikler .............................TR-3 Teslimat kapsamı ........................TR-3 3.1 İç...
  • Page 4: Lütfen Hemen Okuyun

    LAK 6IMR-TP - LAK 14ITR-TP Lütfen hemen okuyun 1.2 Amaca uygun kullanım Bu cihaz yalnızca üretici tarafından izin verilen kullanım amacına 1.1 Önemli notlar uygun olarak kullanılmalıdır. Başka amaçlar doğrultusunda kulla- nılması kullanım amacına uygun değildir. Ayrıca ilgili projelen- dirme planını da göz önünde bulundurun. Cihazda herhangi bir DIKKAT! değişiklik veya tadil yapmayın.
  • Page 5: Kullanım Amacı

    LAK 6IMR-TP - LAK 14ITR-TP Kullanım amacı 3.2 Kontak plakası Cihazın iç tarafa ulaşması için kaplamayı sökün. 2.1 Uygulama alanı Alt taraftaki her iki vidayı gevşetin. Ardından kaplamayı yukarı doğru kaldırın. İç ünite çift taraflı ısı pompası ve binadaki ısıtma şebekesi ara- sında arayüz oluşturur.
  • Page 6: Dış Ünite

    LAK 6IMR-TP - LAK 14ITR-TP Dış ünite 4.1 Kurulum  Dış ünite binadan ayrı bir temel üzerinde duracak şekilde duvara yakın bir yere kurulması önerilir. Emme tarafından en az 0,3 m'lik bir mesafe bırakılmasına dikkat edin (görüntü 4.1 sayfasina 4 + görüntü 4.2 sayfasina 4).
  • Page 7 Rüzgardan koruyucu Deniz rüzgarı Şayet kıyı alanlarına ilişkin yazılı montaj gerekliliklerine uyulmazsa, aşınmaya karşı korunmaya ilişkin daha fazla bilgi almak için Dimplex çalışanları ile iletişime geçin. Isı eşanjöründeki toz ve tuz kirliliği düzenli aralıklarla (en azından yılda bir) suyla temizlenmelidir.
  • Page 8: Kışın Ve Mevsimlik Rüzgarlarda Dikkat Edilecek Hususlar

    LAK 6IMR-TP - LAK 14ITR-TP 4.2 Kışın ve mevsimlik rüzgarlarda 5.2 İç ünitenin sabitlenmesi dikkat edilecek hususlar İç ünite, cihazla birlikte verilen vida ve dübeller (8 mm) ile duvara sabitlenir. Aşağıdaki gibi hareket edin:  Cihazın düzgün bir şekilde çalışabilmesi için karlı alanlarda ...
  • Page 9: Isıtma Sistemi Bağlantısı

    LAK 6IMR-TP - LAK 14ITR-TP 5.3 Isıtma sistemi bağlantısı Minimum ısıtma suyu miktarı Isı pompasının minimum ısıtma suyu miktarı ısıtma sisteminin Isıtma sistemi bağlantısını 1 inç düz sızdırmaz dış dişli ile iç üni- her çalışma durumunda minimum 50 l ile korumaya alınmalıdır teye bağlayın.
  • Page 10: Devreye Alma

    LAK 6IMR-TP - LAK 14ITR-TP Devreye alma 6.3 Devreye almada yöntem ve usuller 6.1 Genel Isı pompası devreye alması ısı pompası kontrol ünitesi ile ger- çekleşir. Ayarlar bu kılavuza göre yapılmalıdır. Düzgün bir şekilde devreye almak için bu işlemler firmada yetkili kişiler tarafından yapılmalıdır.
  • Page 11: Dış Ünitenin Borulu Iletim Ve Kablosunun Bağlanması

    LAK 6IMR-TP - LAK 14ITR-TP Dış ünitenin borulu Üretici işletme (bkz. model adının etiketi) Montaj tesisi (Mümkün olduğunca bakım bağlantılarına ek iletim ve kablosunun olarak soğutucu akışkan eklemek veya çıkarmak) bağlanması Toplam dolum (1, + 2,) 7.1.2 Borulu iletim için hazırlık Bu bölümde dış...
  • Page 12 LAK 6IMR-TP - LAK 14ITR-TP 7.1.3 İç ünite boru bağlantıları Adım 4: Kenar kıvırma  Kenar kıvırma işlemi, resimde gösterildiği gibi R-410A-soğu- İç ünite boru bağlantısı iki adımda gerçekleştirilir. Aşağıdaki kıla- tucu akışkan için kenar kıvırma cihazı ile yapılmalıdır. vuzu derhal okuyun.
  • Page 13: Elektrik Bağlantıları

    LAK 6IMR-TP - LAK 14ITR-TP 7.2 Elektrik bağlantıları Adım 2: Sabitleme  Boruyu merkezlenecek şekilde hizalayın ve vida somunu eli- nizle sabitleyin. 7.2.1 Dış modül  Vida somununu klik sesini duyana kadar somun anahtarı ile sabitleyin.  Döndürme momentleri. Dış ünitede bulunan platinler üzerindeki DIP anahtarının hiçbir fonksiyonu yoktur.
  • Page 14: Son Iş

    LAK 6IMR-TP - LAK 14ITR-TP 7.2.2 İç ünite 7.3 Son iş İç üniteye iki besleme hattı bağlanmalıdır: Isı pompası güç kay- Boru ve elektrik kablosu bağlantısı yapıldıktan sonra borular bü- nağı ve entegre ısı pompası kontrol ünitesi için kontrol gerilimi külmeli ve test edilmelidir.
  • Page 15: Sızdırmazlık Testi Ve Tahliye

    LAK 6IMR-TP - LAK 14ITR-TP 7.4.3 Tahliye Borulu iletim ve iç modülü boş pompalamak için yukarıda %RUX oHYUHVLQGH bahsedilen doldurma hortumunun ucunu vakum pompasına EXOXQDQ NoN bağlayın. Çok yollu vana kolu “Düşük” (Lo) ve “Yüksek” (Hi) 6HDO D VPDOO RSHQLQJ...
  • Page 16: Kontrol Noktası, Bakım Ve Arıza Giderme

    LAK 6IMR-TP - LAK 14ITR-TP Kontrol noktası, bakım ve arıza giderme Devreye alma işleminden önce, bu bölümde yazılı kontrol nokta- Şayet şu ana kadar hiç arıza meydana gelmediyse, LAK ayırma larına gözden geçirin. ısı pompasının avantajlarının tadını çıkarmak için cihaz devreye alınabilir.
  • Page 17: Bakım

    LAK 6IMR-TP - LAK 14ITR-TP 8.2 Bakım DIKKAT! Cihazı açmadan önce tüm elektriksel devrenin gerilimsiz olduğundan Optimum LAK ayırma ısı pompası performansı için cihaz düzenli emin olun aralıklarla denetlenmeli ve bakımı yapılmalıdır. Yılda en az bir kez aşağıdaki kontrol listesinin gerçekleştirilmesi önerilir.
  • Page 18: Dış Modül Sıcaklık Sensörü Özellikleri

    LAK 6IMR-TP - LAK 14ITR-TP 8.4 Dış modül sıcaklık sensörü özellikleri Hava sensörü (dış ünite) NTC - 10 Sıcaklık °C k 80,2 58,2 44,0 37,4 33,6 30,3 25,9 20,2 15,8 13,8 12,5 11,4 10,5 Sıcaklık °C k 10,0 9,57 8,76...
  • Page 19: Temizlik / Bakım

    LAK 6IMR-TP - LAK 14ITR-TP Temizlik / Bakım 10 Arızalar / Sorun Giderme LAIC cihazları yüksek kaliteli ürünlerdir ve sorunsuz bir şekilde 9.1 Bakım çalışacak şekilde tasarlanmışlardır. Buna rağmen herhangi bir arıza meydana gelmesi halinde bu durum ısı pompası kontrol Kaplamayı...
  • Page 20: Cihaz Bilgisi

    LAK 6IMR-TP - LAK 14ITR-TP 12 Cihaz bilgisi Tip ve sipariş kodu LAK 6IMR-TP LAK 9IMR-TP LAK 14ITR-TP Tasarım Isı kaynağı Hava Hava Hava Geri dönüşümlü Geri dönüşümlü Geri dönüşümlü Kurulum ayırma ayırma ayırma Regülatör WPM Econ WPM Econ WPM Econ Isı...
  • Page 21 LAK 6IMR-TP - LAK 14ITR-TP Diğer model özellikleri Buz çözme türü Ters sirkülasyon Ters sirkülasyon Ters sirkülasyon Yoğuşma tavası buzlanma koruması / Hayır / evet Hayır / evet Evet / evet Cihazda bulunan su donmaya karşı korumalıdır maks. yüksek işletim basıncı (ısı kaynağı / ısı azaltıcı) Isıtma gücü...
  • Page 22 LAK 6IMR-TP - LAK 14ITR-TP TR-20 452162.66.14 · FD 9607 www.dimplex.de...
  • Page 23 LAK 6IMR-TP - LAK 14ITR-TP Table of contents Please read immediately......................EN-2 1.1 Important notes............................ EN-2 1.2 Intended use ............................EN-2 1.3 Legal regulations and guidelines ......................EN-2 Purpose ............................EN-3 2.1 Area of application ..........................EN-3 2.2 General properties ..........................EN-3 Scope of supply..........................
  • Page 24: Please Read Immediately

    LAK 6IMR-TP - LAK 14ITR-TP Please read 1.2 Intended use immediately This device is only intended for use as specified by the manufac- turer. Any other use beyond that intended by the manufacturer is prohibited. This requires the user to abide by the relevant project 1.1 Important notes...
  • Page 25: Purpose

    LAK 6IMR-TP - LAK 14ITR-TP Purpose 3.2 Contact plate The cover must be removed to allow access to the inside of the 2.1 Area of application device. The two screws on the bottom must be loosened for this. The The indoor unit constitutes the interface between a reversible cover must then be removed to the top.
  • Page 26: Outdoor Unit

    LAK 6IMR-TP - LAK 14ITR-TP Outdoor unit 4.1 Installation  It is advisable to install the outdoor unit close to a wall, on a foundation separate from the building with a minimum clear- ance of 0.3 m on the intake side (Fig.4.1 + Fig.4.2).
  • Page 27 Sea wind NOTE If the outlined requirements cannot be complied with during installation in coastal areas, please contact Dimplex employees for more information on corrosion protection. NOTE Dust or salt soiling on the heat exchanger should be regularly cleaned (at least once a year) with water.
  • Page 28: Precautions In Winter And In Seasonal Winds

    LAK 6IMR-TP - LAK 14ITR-TP 4.2 Precautions in winter and in 5.2 Indoor unit fixing seasonal winds The indoor unit is attached to the wall with the screws and dowels (8 mm) included in the scope of supply. The following procedure ...
  • Page 29: Heating System Connection

    LAK 6IMR-TP - LAK 14ITR-TP Heating system connection Minimum heating water flow rate The minimum heating water flow rate must be ensured in all op- The heating system connections on the indoor unit have a 1" flat erating states of the heating system with at least 50 l (buffer tank sealing external thread.
  • Page 30: Commissioning

    LAK 6IMR-TP - LAK 14ITR-TP Commissioning 6.3 Commissioning procedure The heat pump is commissioned via the heat pump manager. 6.1 General Settings should be made in compliance with the HPM's instruc- tions. To ensure that commissioning is performed correctly, it should...
  • Page 31: Connecting The Pipework And Cables To The Outdoor Unit

    LAK 6IMR-TP - LAK 14ITR-TP Connecting the Production operation (see model name label) Installation operation (where possible, attach alongside the pipework and cables to maintenance connections for adding or removing refriger- the outdoor unit ant) Total filling (1, + 2,) This chapter describes the refrigerant pipe connections and the 7.1.2 Preparation for pipework...
  • Page 32 LAK 6IMR-TP - LAK 14ITR-TP 7.1.3 Pipe connections on the indoor unit Step 4: Flanging  Flanging must be carried out as follows with a flanging tool The pipe connection on the indoor unit takes place in two steps. for R-410A refrigerant as shown in the figure.
  • Page 33: Electrical Connections

    LAK 6IMR-TP - LAK 14ITR-TP 7.2 Electrical connections Step 2: Fastening  Align the centre of the pipe and tighten the screw nuts by hand. 7.2.1 Outdoor unit  Tighten the screw nuts with a spanner until they click. ...
  • Page 34: Final Work

    LAK 6IMR-TP - LAK 14ITR-TP 7.2.2 Indoor unit 7.3 Final work Two supply cables must be connected to the indoor unit: The Once the pipes and electric cables have been connected, the power supply to the heat pump and the control voltage for the in- pipes must be bent and a number of tests carried out.
  • Page 35: Leak Test And Evacuation

    LAK 6IMR-TP - LAK 14ITR-TP The gas cylinder is usually used in an upright position. Check all pipe connections (indoor and outdoor) and main- 6HDO D VPDOO RSHQLQJ 6HDO D VPDOO RSHQLQJ 6HDO VPDOO JDSV DURXQG tenance valves of the air and liquid side for leaks. Bubbles...
  • Page 36: Test Points, Maintenance And Troubleshooting

    LAK 6IMR-TP - LAK 14ITR-TP Test points, maintenance and troubleshooting Before commissioning the unit, run through the test points out- If no faults have occurred here by this point, the unit can now be lined in this chapter. operated and you can enjoy the benefits of the LAK split heat You will also find instructions for maintenance and troubleshoot- pump.
  • Page 37 LAK 6IMR-TP - LAK 14ITR-TP 8.2 Maintenance ATTENTION! Before opening the unit, ensure that all electric circuits are isolated from To maintain an optimal output on the LAK split heat pump, regu- the power supply. lar checks and maintenance work should be carried out on the unit.
  • Page 38: Characteristic Curve Temperature Sensor Outdoor Unit

    LAK 6IMR-TP - LAK 14ITR-TP 8.4 Characteristic curve temperature sensor outdoor unit Air sensor (outdoor unit) NTC - 10 Temperature in °C k 80,2 58,2 44,0 37,4 33,6 30,3 25,9 20,2 15,8 13,8 12,5 11,4 10,5 Temperature in °C k...
  • Page 39: Cleaning / Maintenance

    LAK 6IMR-TP - LAK 14ITR-TP Cleaning / maintenance 10 Faults / troubleshooting LAiC devices are high-quality products and should work without 9.1 Maintenance problems. Should a fault occur, however, it will be indicated on the heat pump manager display. In this case, consult the "Faults To protect the cover, avoid leaning anything against the device or and troubleshooting"...
  • Page 40: Device Information

    LAK 6IMR-TP - LAK 14ITR-TP 12 Device information Type and order code LAK 6IMR-TP LAK 9IMR-TP LAK 14ITR-TP Design Heat source Model Split reversible Split reversible Split reversible Controller WPM Econ WPM Econ WPM Econ Thermal energy metering Installation location...
  • Page 41 LAK 6IMR-TP - LAK 14ITR-TP Additional model features Type of defrosting Reverse circulation Reverse circulation Reverse circulation Condensate tray frost protection / No / Yes No / Yes Yes/ Yes Water in device is protected from freezing Max. operating overpressure (heat source/heat sink)
  • Page 42 LAK 6IMR-TP - LAK 14ITR-TP EN-20 452162.66.14 · FD 9607 www.dimplex.de...
  • Page 43 LAK 6IMR-TP - LAK 14ITR-TP Spis treści Należy niezwłocznie zapoznać się z tekstem ................PL-2 1.1 Ważne wskazówki ..........................PL-2 1.2 Użycie zgodne z przeznaczeniem ......................PL-2 1.3 Ustawowe przepisy i dyrektywy ......................PL-2 Zastosowanie..........................PL-3 2.1 Zakres zastosowania ..........................PL-3 2.2 Właściwości ogólne ..........................
  • Page 44: Należy Niezwłocznie Zapoznać Się Z Tekstem

    LAK 6IMR-TP - LAK 14ITR-TP Należy niezwłocznie 1.2 Użycie zgodne z zapoznać się z tekstem przeznaczeniem To urządzenie jest dopuszczone tylko do użycia przewidzianego przez producenta. Inne lub wykraczające poza ten zakres użycie 1.1 Ważne wskazówki jest uznawane za niezgodne z przeznaczeniem. Do tego zalicza się...
  • Page 45: Zastosowanie

    LAK 6IMR-TP - LAK 14ITR-TP Zastosowanie 3.2 Płytka rozdzielcza Aby dostać się do wnętrza urządzenia, należy zdemontować po- 2.1 Zakres zastosowania krywę. W tym celu należy odkręcić obie śruby znajdujące się w dolnej Jednostka wewnętrzna łączy odwracalną pompę ciepła z siecią...
  • Page 46: Jednostka Zewnętrzna

    LAK 6IMR-TP - LAK 14ITR-TP Jednostka zewnętrzna 4.1 Instalacja  Zaleca się montaż jednostki zewnętrznej blisko ściany na oddzielonym od budynku fundamencie, w odstępie mini- mum 0,3 m po stronie zasysania (Rys. 4.1 na str. 4 + Rys. 4.2 na str. 4).
  • Page 47 Jeśli nie ma możliwości zachowania opisanych wymogów podczas montażu na terenach morskich, należy skontaktować się z pracownikami WSKAZÓWKA firmy Dimplex, aby otrzymać więcej wskazówek na temat ochrony Jeśli zamontuje się urządzenie zewnętrzne na terenie przybrzeżnym, antykorozyjnej. należy unikać bezpośredniego wpływu wiatrów morskich.
  • Page 48: Środki Ostrożności Na Okres Zimy Oraz W Przypadku Wiatrów Sezonowych

    LAK 6IMR-TP - LAK 14ITR-TP 4.2 Środki ostrożności na okres WSKAZÓWKA zimy oraz w przypadku wiatrów Podczas demontażu pokrywy urządzenia należy uwzględnić fakt, że długość przewodu łączącego - między panelem sterującym w pokrywie sezonowych urządzenia a regulatorem na płytce rozdzielczej - wynosi tylko 1,5 m. Jeśli zdemontowana pokrywa urządzenia musi zostać...
  • Page 49: Przyłącze Od Strony Grzewczej

    LAK 6IMR-TP - LAK 14ITR-TP 5.3 Przyłącze od strony grzewczej Minimalny przepływ wody grzewczej Należy zapewnić, by w każdym stanie pracy instalacji grzewczej Przyłącza od strony grzewczej przy jednostce wewnętrznej są minimalny przepływ wody grzewczej pompy ciepła wynosił 50 l zaopatrzone w gwint zewnętrzny płasko uszczelniający 1".
  • Page 50: Uruchomienie

    LAK 6IMR-TP - LAK 14ITR-TP Uruchomienie 6.3 Postępowanie podczas uruchamiania 6.1 Informacje ogólne Uruchomienie pompy ciepła odbywa się za pomocą sterownika pompy ciepła. Wszystkie jego ustawienia muszą być przeprowa- Aby zapewnić prawidłowe uruchomienie, powinno ono zostać dzone zgodnie z jego instrukcją.
  • Page 51: Przyłącza Przewodów Rurowych I Kabli Do Urządzenia Zewnętrznego

    LAK 6IMR-TP - LAK 14ITR-TP Przyłącza przewodów UWAGA! Niefachowe uzupełnianie czynnika chłodniczego niesie ze sobą ryzyko rurowych i kabli do usterek w układzie. urządzenia Producent (patrz etykieta z nazwą modelu) zewnętrznego Firma instalacyjna (w miarę możliwości umieścić obok przy- łączy konserwacyjnych do dodawania lub spuszczania czynnika chłodniczego)
  • Page 52 LAK 6IMR-TP - LAK 14ITR-TP 7.1.3 Przyłącza rurowe do urządzenia Krok 4: Kielichowanie  Kielichowanie należy wykonać zgodnie z poniższym opisem wewnętrznego za pomocą kielichownicy do rur z czynnikiem chłodniczym Przyłączenie rur do urządzenia wewnętrznego odbywa się dwu- R-410A, jak pokazano na rysunku.
  • Page 53: Przyłącza Elektryczne

    LAK 6IMR-TP - LAK 14ITR-TP 7.2 Przyłącza elektryczne Krok 2: Zamocowanie  Wyrównać środek rury i dokręcić ręcznie nakrętki rurowe.  Dokręcić nakrętkę śrubową kluczem do śrub aż do usłysze- 7.2.1 Urządzenie zewnętrzne nia kliknięcia.  Momenty dokręcenia. WSKAZÓWKA Przełącznik typu DIP oraz płytki w urządzeniu zewnętrznym nie działają.
  • Page 54: Prace Wykończeniowe

    LAK 6IMR-TP - LAK 14ITR-TP 7.2.2 Jednostka wewnętrzna 7.3 Prace wykończeniowe Do jednostki wewnętrznej należy podłączyć dwa przewody zasi- Po podłączeniu rur i kabli elektrycznych należy pozginać rury lające: Zasilanie pompy ciepła oraz napięcie sterowania wbudo- oraz przeprowadzić kilka testów. Kontrola szczelności musi być...
  • Page 55: Kontrola Szczelności I Opróżnianie

    LAK 6IMR-TP - LAK 14ITR-TP Butla gazowa używana jest zazwyczaj w pozycji pionowej. Sprawdzić wszystkie przewody rurowe (wewnątrz i na ze- 0QLHMV]H V]F]HOLQ\ ZRNyá wnątrz) oraz zawory konserwacyjne po stronie wody i cieczy UXU XV]F]HOQLü QS VLOLNRQHP pod kątem nieszczelności. Pęcherze wskazują na nieszczel-...
  • Page 56: Punkty Kontrolne, Konserwacja I Usuwanie Usterek

    LAK 6IMR-TP - LAK 14ITR-TP Punkty kontrolne, konserwacja i usuwanie usterek Przed uruchomieniem przeprowadzić punkty kontrolne opisane Jeśli do tej pory nie wystąpiły żadne usterki, urządzenie można w niniejszym rozdziale. uruchomić, aby cieszyć się zaletami pompy ciepła LAK typu split.
  • Page 57: Konserwacja

    LAK 6IMR-TP - LAK 14ITR-TP 8.2 Konserwacja UWAGA! Przed otwarciem urządzenia należy upewnić się, że wszystkie obwody W celu zachowania optymalnej wydajności pompy ciepła LAK elektryczne są odłączone od napięcia zasilania. typu split należy regularnie sprawdzać i konserwować urządze- nie.
  • Page 58: Charakterystyki Czujnika Temperatury W Urządzeniu Zewnętrznym

    LAK 6IMR-TP - LAK 14ITR-TP 8.4 Charakterystyki czujnika temperatury w urządzeniu zewnętrznym Czujnik powietrza (jednostka zewnętrzna) NTC - 10 Temperatura w °C k 80,2 58,2 44,0 37,4 33,6 30,3 25,9 20,2 15,8 13,8 12,5 11,4 10,5 Temperatura w °C k...
  • Page 59: Czyszczenie / Pielęgnacja

    LAK 6IMR-TP - LAK 14ITR-TP Czyszczenie / 10 Usterki / diagnostyka pielęgnacja Urządzenia LAK są produktami wysokiej jakości i powinny dzia- łać bezproblemowo. Jeżeli jednak wystąpią jakiekolwiek usterki, zostanie to pokazane na wyświetlaczu sterownika. Więcej infor- 9.1 Pielęgnacja macji na ten temat znajdą Państwo na stronie „Usterki i wyszuki- wanie błędów”...
  • Page 60: Informacje O Urządzeniu

    LAK 6IMR-TP - LAK 14ITR-TP 12 Informacje o urządzeniu Typ i kod zamówieniowy LAK 6IMR-TP LAK 9IMR-TP LAK 14ITR-TP Rodzaj konstrukcji Dolne źródło Powietrze Powietrze Powietrze Model Split odwracalna Split odwracalna Split odwracalna Regulator WPM Econ WPM Econ WPM Econ Obliczanie ilości wyprodukowanego ciepła...
  • Page 61 LAK 6IMR-TP - LAK 14ITR-TP Pozostałe cechy modelu Sposób odszraniania Odwrócenie obiegu Odwrócenie obiegu Odwrócenie obiegu Ochrona wanny kondensatu przez mrozem/ Nie / Tak Nie / Tak Tak / Tak Woda w urządzeniu zabezpieczona przed zamarzaniem Maks. nadciśnienie robocze (dolne źródło / zrzut ciepła) Moc grzewcza / współczynniki wydajności...
  • Page 62 LAK 6IMR-TP - LAK 14ITR-TP PL-20 452162.66.14 · FD 9607 www.dimplex.de...
  • Page 63: Ek / Appendix / Załącznik

    Boyutlar / Dimension Drawings / Rysunki wymiarowe ................A-II 1.1 Dış modül boyutları / Dimension drawing outdoor unit / Rysunek wymiarowy urządzenia zewnętrznego LAK 6IMR-TP / LAK 9IMR-TP ........................ A-II 1.2 Dış modül boyutları / Dimension drawing outdoor unit / Rysunek wymiarowy urządzenia zewnętrznego LAK 14ITR-TP............A-III 1.3 Temel plan / Foundation plan / Plan fundamentu ..................A-IV...
  • Page 64: Boyutlar / Dimension Drawings / Rysunki Wymiarowe

    LAK 6IMR-TP - LAK 14ITR-TP 1 Boyutlar / Dimension Drawings / Rysunki wymiarowe 1.1 Dış modül boyutları / Dimension drawing outdoor unit / Rysunek wymiarowy urządzenia zewnętrznego LAK 6IMR-TP / LAK 9IMR-TP Kondensatablauf Yoğuşma drenajı / Condensate drain / Odpływ kondensatu Dübel vidaları...
  • Page 65: Dış Modül Boyutları / Dimension Drawing Outdoor Unit / Rysunek Wymiarowy Urządzenia Zewnętrznego Lak 14Itr-Tp

    LAK 6IMR-TP - LAK 14ITR-TP 1.2 Dış modül boyutları / Dimension drawing outdoor unit / Rysunek wymiarowy urządzenia zewnętrznego LAK 14ITR-TP Genel Bilgiler General information Ogólne informacje 'Õú PRGO KDULFL &LKD]ÕQ ÕVÕWPD JF +HDW RXWSXW RI WKH GHYLFH 2XWGRRU XQLW H[WHUQDO ...
  • Page 66: Temel Plan / Foundation Plan / Plan Fundamentu

    LAK 6IMR-TP - LAK 14ITR-TP 1.3 Temel plan / Foundation plan / Plan fundamentu A-IV 452162.66.14 · FD 9607 www.dimplex.de...
  • Page 67: İç Modül Boyutları / Dimension Drawing Indoor Unit / Rysunek Wymiarowy Jednostki Wewnętrznej

    LAK 6IMR-TP - LAK 14ITR-TP 1.4 İç modül boyutları / Dimension drawing indoor unit / Rysunek wymiarowy jednostki wewnętrznej www.dimplex.de 452162.66.14 · FD 9607...
  • Page 68: Diyagramlar / Diagrams / Wykresy

    LAK 6IMR-TP - LAK 14ITR-TP 2 Diyagramlar / Diagrams / Wykresy 2.1 EIsıtma çalışma sınırı / Operating limits diagram heating / Wykres limitów pracy, grzanie 6X oÕNÕúÕ +/- 2 K) WDWHU RXWOHW +/- 2 K) :\M FLH ZRG\ +/- 2 K) ,VÕ...
  • Page 69: Soğutma Çalışma Sınırı / Operating Limits Diagram Cooling / Wykres Limitów Pracy, Chłodzenie

    LAK 6IMR-TP - LAK 14ITR-TP 2.2 Soğutma çalışma sınırı / Operating limits diagram cooling / Wykres limitów pracy, chłodzenie 6X oÕNÕúÕ +/- 2 K) WDWHU RXWOHW +/- 2 K) :\M FLH ZRG\ +/- 2 K) ,VÕ GúUPH JLULú VÕFDNOÕ÷Õ [°C] HHDW VLnN LnOHW WHPSHUDWXUH [°C]...
  • Page 70: Akım Akış Planları / Circuit Diagrams / Schematy Obwodowe

    LAK 6IMR-TP - LAK 14ITR-TP 3 Akım akış planları / Circuit diagrams / Schematy obwodowe 3.1 Kontrol / Control / Sterowanie A-VIII 452162.66.14 · FD 9607 www.dimplex.de...
  • Page 71: Yük / Load / Obciążenie

    LAK 6IMR-TP - LAK 14ITR-TP 3.2 Yük / Load / Obciążenie www.dimplex.de 452162.66.14 · FD 9607 A-IX...
  • Page 72: Bağlantı Planı / Circuit Diagram / Schemat Połączeń

    LAK 6IMR-TP - LAK 14ITR-TP 3.3 Bağlantı planı / Circuit diagram / Schemat połączeń 452162.66.14 · FD 9607 www.dimplex.de...
  • Page 73: Dizin / Legend / Legenda

    LAK 6IMR-TP - LAK 14ITR-TP 3.4 Dizin / Legend / Legenda ESF kilit koruması mevcut olmadığında köprü ESF Utility block (EVU) bridge must be inserted if no W przypadku braku stycznika blokady przedsiębior- kilidi takılmalıdır utility blocking contactor is present stwa energetycznego należy założyć...
  • Page 74 LAK 6IMR-TP - LAK 14ITR-TP Yapı malzemeleri müşteri tarafından bağlanır / sağ- Components must be connected / supplied by the Części podłącza/zapewnia użytkownik lanır customer ______ işletmece döşenmiş Wired ready for use Okablowanie fabryczne - - - - - - gerektiği takdirde müşteri tarafından bağlanır...
  • Page 75: Hidrolik Bağlantı Şeması / Hydraulic Integration Diagrams / Schematy Układów Hydraulicznych

    LAK 6IMR-TP - LAK 14ITR-TP 4 Hidrolik bağlantı şeması / Hydraulic integration diagrams / Schematy układów hydraulicznych 4.1 Tek enerjili sistemleri bir ısıtma devresi; ısıtma ve dinamik soğutma / Mono energy system with one heating circuit, heating and dynamic cooling / Instalacja monoenergetyczna z jednym obiegiem grzewczym, ogrzewanie i dynamiczne chłodzenie...
  • Page 76: Tek Enerjili Sistemleri Bir Isıtma Devresi; Isıtma Ve Dinamik Soğutma Ve Sıcak Su Hazırlama / Mono Energy

    LAK 6IMR-TP - LAK 14ITR-TP 4.2 Tek enerjili sistemleri bir ısıtma devresi; ısıtma ve dinamik soğutma ve sıcak su hazırlama / Mono energy system with one heating circuit; heating, dynamic cooling and domestic hot water preparation / Instalacja monoenergetyczna z jednym obiegiem grzewczym; grzanie, dynamiczne chłodzenie i przygotowanie ciepłej wody użytkowej...
  • Page 77: Dizin / Legend / Legenda

    LAK 6IMR-TP - LAK 14ITR-TP 4.3 Dizin / Legend / Legenda Kapama vanası Shut-off valve Zawór odcinający Aşırı akım vanası Overflow valve Zawór przelewowy Genleşme tankı Expansion vessel Naczynie wzbiorcze Room temperature-controlled valve Zawór sterowany temperaturą pomiesz- Oda sıcaklığı ayarlı vana czenia Isı...
  • Page 78: Uygunluk Beyanı / Declaration Of Conformity / Deklaracja Zgodności

    LAK 6IMR-TP - LAK 14ITR-TP 5 Uygunluk beyanı / Declaration of Conformity / Deklaracja zgodności AB - Uygunluk Beyanı EC Declaration of Conformity Deklaracja zgodności WE Aşağıda imzası bulunan Glen Dimplex Deutschland GmbH The undersigned Geschäftsbereich Dimplex Niżej podpisana firma,...
  • Page 79 LAK 6IMR-TP - LAK 14ITR-TP www.dimplex.de 452162.66.14 · FD 9607 A-XVII...
  • Page 80 Glen Dimplex Deutschland GmbH Hata ihtimali ve değişiklik hakkı saklıdır. Geschäftsbereich Dimplex Subject to alterations and errors. Am Goldenen Feld 18 Zastrzega sie mozliwosc wprowadzania D-95326 Kulmbach zmian oraz wystapienia bledów. +49 (0) 9221 709 565 www.dimplex.de...

This manual is also suitable for:

Lak 9imr-tpLak 14itr-tp

Table of Contents