Download Print this page

Siemens Operator Display Panel II Installation Instructions page 2

Odp ii

Advertisement

Document No. 570-11
Installation Instructions
February 18, 2013
Installation Instructions
NOTE:
The ODP must be mounted so that the
fume hood operator can easily read its
display and reach its buttons.
1. Choose the mounting location for the ODP. The
panel can be mounted directly on the fume
hood over a pre-existing cutout, on a nearby
wall or over a conduit box.
2. Continue with one of the following:
-
Installing a Cutout
-
Installing the ODP
Installing a Cutout
1. Using the mounting plate as a template, mark
the location for the mounting holes and
interface cable/connector.
2. Drill the two mounting holes using a 3/16-inch
(5 mm) bit.
3. Cut the controller interface port clearance hole
using a 1-1/2 inch (38 mm) hole saw.
Installing the ODP
1. Position the mounting bracket over the existing
cutout on the fume hood. Align the holes on the
mounting bracket with the screw holes of the
cutout.
NOTE: Make sure that there is enough
clearance for the controller interface port on the
ODP.
2. Attach the mounting plate to the mounting
surface using the screws provided.
NOTE: The height of the screw heads must not
exceed 3 mm.
Page 2 of 4
3. Pull the cable through the plate and connect it
to the ODP at the controller interface port.
4. Place the ODP onto the mounting bracket so
that the flange engages into the slots located
inside the top of the panel housing.
5. Push until locking tab clicks in place.
Siemens Industry, Inc.

Advertisement

loading