Copier Operation; Operation Outline; Description Of Operation; Warming Up - Toshiba e-STUDIO 160 Service Manual

Hide thumbs Also See for e-STUDIO 160:
Table of Contents

Advertisement

4. COPIER OPERATION

4.1 Operation Outline

Copier Operation

4.2 Description of Operation

4.2.1 Warming up

(1) Initialization
• Turn on the power switch.
• The message "Please wait" appears on the display.
• The PS fan motor operates and the process unit fan motor operates at low speed.
• Initialization of optical unit
The carriage moves to the home position and then stops.
The peak position is detected as the carriage moves.
The Exposure lamp lights and the peak is detected (Shading sheet is detected).
The Exposure lamp goes off.
• Initialization of paper feed mechanism
Each tray is lifted. (It will not move if it has already been lifted.)
(2) When the temperature of the heat roller has been sufficiently stabilized, the copy quantity shows "1"
and the word "READY" appears.
December 2002 TOSHIBA TEC
Operation during warm up and standby
Copying Operation
Automatic feed copying using START key
Bypass-feed copying
Interrupt Copying
4 - 1
e-STUDIO160/200/250 COPIER OPERATION

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-studio 200E-studio 250

Table of Contents