Oudoor Unit Installation - Electrolux EXl09HL1W Installation Manual

Split inverter heat pump
Hide thumbs Also See for EXl09HL1W:
Table of Contents

Advertisement

Available languages

Available languages

Outdoor Unit Installation
Step 1: Securing of Outdoor Unit
existent in its based with 4 bolts and nuts of
10 mm tightly (not included).
Place the outdoor unit over a horizontal
concrete or rigid surface (never directly over
grass or land).
Air inlet
Outdoor Unit
Dimension
mm(WxDxH)
776 x 320 x 540
848 x 320 x 592
899 x 378 x 596
955 x 396 x 700
caution
If a suspended installation is needed,
the installation bracket must allow the
The wall where the unit will be installed
must be of solid brick, concrete or
provided with other reinforcement ways
bracket to the wall and the bracket to
and leveled.
29
Air inlet
Air outlet
Dimension
Dimension
"A" (mm)
"B" (mm)
510
286
540
286
550
343
560
368
Step 2: Outdoor Condensate Drainage
(only for heat pump model)
During heating operation, the condensate and
defrosting water should be drained out reliably
through the drain hose.
Install the outdoor drain connector in the drain-
water hole on the chassis of outdoor unit, and
attach the drain hose to the connector so that
the waste water formed in the outdoor unit can
be drained out.
The drain-water hole must be plugged.
Whether to plug other holes will be determined
by the installer according to actual conditions.
In case of a drain hose, the unit must be
installed on a base more than 3cm height.
Hose of inner dia. 16mm
(not provided)
Drain-water
hole
Chassis
Drain
connecter

Advertisement

Table of Contents
loading

This manual is also suitable for:

Exl12hl1wExl18hl1w

Table of Contents