Battery Box; Starter Solenoid; Voltage Regulator; Strobe System (Option) - Jabiru J230-C Service Manual

Table of Contents

Advertisement

Jabiru Aircraft
Aircraft Service Manual
3.
Rinse with clear water, wipe off excess water and allow battery to dry.
4.
Brighten up cable ends and battery terminals with emery cloth or a wire brush.
5.
Install the battery in accordance with the preceding paragraphs.
6.
Coat the battery terminals with petroleum jelly or an ignition spray product to reduce
corrosion.
14.4.5

BATTERY BOX

The battery box is located on the firewall in the engine compartment.
14.5

STARTER SOLENOID

The starter solenoid is a sealed unit. Service is limited to inspection of terminals for
security and replacement of the unit.
14.6

VOLTAGE REGULATOR

The voltage regulator is a sealed unit. Service is limited to inspection of terminals for
security and replacement of the unit.
14.7

STROBE SYSTEM (OPTION)

A white strobe light may be installed in the rear lower fuselage or in the cabin roof. The
power source for the strobe light is located behind the fuel tank.
The strobe system is a high-voltage device. Do Not remove or touch tube assembly
while in operation.
commencing any activity near the strobe light.
14.8

AUXILIARY POWER SOCKET

The jabiru is fitted with an auxiliary power socket that accepts a 12V cigarette lighter plug.
The circuit breaker for this plug is rated a 10 Amps. However it should be noted that the
maximum continuous alternator output is also 10 Amps.
14.9

ELECTRICAL LOAD ANALYSIS (ELA)

An ELA has been carried out as part of the aircraft's certification basis. Any changes to
the electrical system which affect the ELA require a new ELA to be raised. For Special
category LSAs' this must be approved by Jabiru Aircraft.

14.10 RADIO WIRING DIAGRAM (OPTION)

The optional aircraft radio system diagram is provided with the radio manuals.
14.10.1

VHF ANTENNA INSTALLATION

The VHF antenna used consists of two aluminium bars permanently bonded in place
inside the spar channel of the vertical fin. Figure 61 shows the position details of the two
bars.
0
REVISION
L:\files\Technical_manuals\J230_J430\J230.J430_Work_files\J230-C_Tech_Rev_1.doc
Print Date: 14/01/2009 4:41:00 PM
Pty Ptd
WARNING
Wait at least 5 minutes after turning off power before
Dated : Feb 2006
Jabiru J230-C
Issued By: RAS
Page: 151 of 171

Advertisement

Table of Contents
loading

Table of Contents