CAME A 3024 N Installation Manual

CAME A 3024 N Installation Manual

Ati series
Hide thumbs Also See for A 3024 N:

Advertisement

AUTOMATION FOR SWING GATES
ATI
SERIES
INSTALLATION MANUAL
A 3024 N
A 5024 N

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the A 3024 N and is the answer not in the manual?

Questions and answers

Summary of Contents for CAME A 3024 N

  • Page 1 AUTOMATION FOR SWING GATES SERIES INSTALLATION MANUAL A 3024 N A 5024 N...
  • Page 2: Legend Of Symbols

    3 Reference Standards The company: Came Cancelli Automatici is ISO 9001:2000 quality certified; is has also obtained the ISO 14001 environmental safeguarding certification. Came engineers and manufactures all of its products in Italy. This product complies with the following standards: see declaration of compliance.
  • Page 3: Overall Dimensions

    4.4 Overall dimensions A 3024N Measurements in mm Gate leaf width Gate leaf weight 2.00 2.50 3.00 Travel A 5024N Gate leaf width Gate leaf weight 2.00 1000 2.50 3.00 Travel 4.00 5.00 5 Installation Installation must be carried out by expert qualified personnel and in full compliance with current regulations. 5.1 Preliminary checks Before installing, do the following: •...
  • Page 4: Tools And Materials

    5.2 Tools and materials Make sure you have all the tools and materials you will need for the installation at hand to work in total safety and compliance with the current standards and regulations. The following figure illustrates the minimum equipment needed by the installer. 5.3 Cable list and minimum thickness Connections Type of cable...
  • Page 5 5.4 Mounting The following are just example applications, given that the space for securing the operator and accessories may vary depen- ding on the dimensions. It is thus up to the installer to choose the most suitable solution. Tab. 3 Pillar Gate leaves up to 3 m Opening...
  • Page 6 Unscrew the two securing screws and remove the carter. Carter Stem Unscrew the two securing screws and remove the stem. M8 self-locking nut Endless screw Begin mounting the gearmotor to the two brackets. M8x10 M8x50 N.B.: we suggest lubricating (using neutral grease) the endless screw and the bushing upon installation. 5.7 Securing and adjusting the endstop Closing-speed brake microswitch...
  • Page 7 OPENING PHASE: (stop) Release the gearmotor and swing the gate-leaf to the fully open position you desire, then, unscrew the securing screws on the opening stop micro-switches assembly. Slide the micro-switch assembly along the micro-switch bar until it is inserted by contact on the micro-switch activating sled Secure the micro-switch assembly using the respective screws.
  • Page 8: Safety Instructions

    5.8 Connecting to the ZL180 control panel ZL180 6 Safety instructions Important safety instructions This product must only be employed for its originally intended use. Any other use is wrong and potentially dangerous. The manufacturer cannot be held liable for any damages resulting from wrongful, erroneous or negligent uses. Avoid working close to the hinges or other moving mechanical parts.
  • Page 9: Periodic Maintenance

    7 Maintenance 7.1 Periodic maintenance Periodic maintenance to be carried out by the end-user is as follows: wipe clean the glass surface of the photocells; check that the safety devices work properly; remove any obstructions. We suggest checking the state of lubrication and tightness of the anchoring screws on the operator. To check the efficiency of the safety devices, move an object in front of the photocells when gate is closing.
  • Page 10: Extraordinary Maintenance

    8 Maintenance Periodic maintenance log for end-user (every 6 moths) Date Signature Notes 8.3 Extra-ordinary maintenance The following table serves to note down any extraordinary maintenance, repairs or improvements performed by specia- lised firms. N.B.: Any extraordinary maintenance must be performed by specialised technicians. Extra-ordinary maintenance log Installer’s stamp Operator name...
  • Page 11: Phasing Out And Disposal

    We ask you to keep protecting the environment, as CAME deems it to be one of the fundamental points of its market operations strategies, by simply following these brief guidelines when disposing: DISPOSING THE PACKING MATERIALS The packing components (cardboard, plastic, etc.) are solid urban waste and may be disposed of without any particular difficulty,...
  • Page 12 CAME UNITED KINGDOM LTD UNIT 3, ORCHARD BUSINESS PARK TOWN STREET, SANDIACRE NOTTINGHAM - NG10 5BP - U.K. Tel - 0044 115 9210430 Fax - 0044 115 9210431...

This manual is also suitable for:

A 5024 nA3024n

Table of Contents