Advertisement

c
Heating and Instantaneous Domestic Hot Water
Dimensions
The boiler is suitable for the flue types:
• type C 12
• type C 32
• type C 52

Technical data

Heat input C/H & DHW
MX2 24 : 12 to 26,1 kW
Gross
MX2 30 : 12 to 32,25 kW
Heat output C/H & DHW MX2 24 : 10 to 24 kW
Gross
MX2 30 : 10 to 30kW
Max. operating pressure C/H circuit : 3 bar
Expansion vessel net capacity
Expansion vessel initial pressure
Electrical consumption
Voltage
Electrical protection index
Fuses
Nominal gas flow rate at 15°C and 1013 mbar
- Natural gas ( G 20) at 20 mbar
- Butane gas ( G 30) at 28 mbar
- Propane gas ( G 31) at 37 mbar
Injectors and gas valves seat diameter
- Manifold injectors (11 for 24 kW)
(14 for 30 kW)
Supplied By www.heating spares.co Tel. 0161 620 6677
MAINTENANCE AND
SERVICE GUIDE
Fanned Flue Combination Boiler
Outer case dimensions :
Fig. 1
: 6 l (24kW)
8 l (30 kW)
: 0.7 bar(24kW) 1bar (30kW)
: 150 w Max
: 230 v
: IP44
: 2 A , 1.25 A and 0.315 A
Maximum
power 24 kW
2.76 m
2.06 kg/h
2.02 kg/h
Natural gas
1.35 mm
These Instructions Must Be Left With The Appliance.
- Height : 720
- Width : 390 (minimum space required 400)
- Depth : 296
DHW flow rate at 30°C
DHW flow rate at 35°C
Minimum DHW operating flow rate
Minimum DHW working pressure
Maximum DHW working pressure
Gas category
MX2 24
Minimum
power 10 kW
3
/h
1.27 m
3
/h
0.94 kg/h
0.93 kg/h
MX2 24
Butane or Propane
0.80 mm
All dimensions in mm
I
Safety valve outlet
J Heating flow
K D.H.W. flow
L Gas supply
M Cold water inlet
N Heating return
MX2 24
:
11,4 l/min
MX2 30
:
14,3 l/min
MX2 24
:
9,85 l/min
MX2 30
:
12,25 l/min
:
2
:
0.1 bar
:
10 bar
:
II 2H 3+
MX2 30
Maximum
Minimum
power 30 kW
power 10 kW
3.41 m
3
/h
1.27 m
2.50 kg/h
0.94 kg/h
2.47 kg/h
0.93 kg/h
MX2 30
Natural gas
Butane or Propane
1,30 mm
0,80 mm
l/min
3
/h

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MX2 24 FF and is the answer not in the manual?

Questions and answers

Summary of Contents for Chaffoteaux & Maury MX2 24 FF

  • Page 1: Technical Data

    MAINTENANCE AND SERVICE GUIDE Fanned Flue Combination Boiler Heating and Instantaneous Domestic Hot Water Dimensions All dimensions in mm Safety valve outlet J Heating flow The boiler is suitable for the flue types: Outer case dimensions : K D.H.W. flow - Height : 720 •...
  • Page 2: Pump And Expanssion Vessel Characteristics

    Pump and expanssion vessel characteristics System capacity chart PUMP HEAD AVAILABLE Minimum flow rate (with all heating thermostatic valves closed) Central heating initial pressure when cold (in bar) C liters Note : The system initial pressure should be over the following value : System static height (in metre) + 0.7 = Initial pressure (in bar) Head available / flow Components location...
  • Page 3: Control Panel

    FUNCTIONING Switching on 1) Check that the gas service tap is opened at the gasmeter and main power is on. 2) Check that pressure in central heating system is above 0.8 bar and below 1.5 bar with the pressure gauge 3) Open the gas tap 3.
  • Page 4: Wiring

    Heating clock) and the boiler temperature control 1)Turn the CH thermostat clockwise 17. is calling for heat. The pump starts The pump will now circulate primary water allowing the ignition sequence to begin. heated by the main heat exchanger 2) If the room thermostat (if fitted), the through the secondary heat exchanger.
  • Page 5: Routine Servicing

    ADJUSTMENTS ON CONTROL PCB Adjustment on the PCB : - P1 : Potentiometer to adjust the CH power - P2 : Potentiometer to adjust the lighting power - P3 : Not use After completling adjustments replace rubber cover and Detail refit outer casing Célectic Domestic flowmeter time 1.5 sec...
  • Page 6: Removal And Replacement Of Parts

    REMOVAL AND REPLACEMENT OF PARTS Before removing appliance case, isolate 5. Ignition Electrode (rignt side) 12. Drain down the gas and electrical supplies. Isolate Carry out steps 1 and 2 as above. DWH : close the DWH inlet tap and open boiler from the system and drain before Unscrew the self taping screws (T20).
  • Page 7 15. Main heat exchanger 17. Pressure relief valve and insulation pads Drain the boiler first, remove the clip Carry out steps 1 and 2 as above. Drain securing the valve and pull it toward you . the boiler (only heating circuit). Remove Remove in reverse order take care to the the 2 front clips E securing the heat valve positionning.
  • Page 8: Fault Finding Chart

    FAULT FINDING CHART Supplied By www.heating spares.co Tel. 0161 620 6677...
  • Page 9 Supplied By www.heating spares.co Tel. 0161 620 6677...
  • Page 10 Supplied By www.heating spares.co Tel. 0161 620 6677...
  • Page 11 Supplied By www.heating spares.co Tel. 0161 620 6677...
  • Page 12: Incorrect Function

    INCORRECT FUNCTION Incorrects functions is signalled by leds (rep 19) display flashing correspond with chart below. CODE FAULT INFORMATION 30 40 50 60 70 80 Overheating safety feature. No flame detection. Antifrost mode on (pump in operation). Antifrost mode on (burner and pump in operation). lack of water circulation.
  • Page 13: Short List

    SHORT LIST Manf. date Key N° Description G.C N° Manf. Pt. N° Type from FF FF 61010191 OVERHEAT THERMOSTAT 105°C 990686 THERMISTOR TEMP. SENSOR 990436 IGNITION ELECTRODE 61304721 FAN ASSY 28KW 61310933 FAN ASSY 24KW 61303146 AIR PRESSURE SWITCH 61313340 AIR PRESSURE SWITCH 61312123 GAS VALVE NAT...
  • Page 14 Chaffoteaux & Maury are continuously improving their products and therefore reserve the right to change specifications without prior notice and accepts no liability for any errors or omission in the information contained in this document. Chaffoteaux & Maury - France Manufacturer: Commercial subsidiary: M T S (GB) Limited...

This manual is also suitable for:

Mx2 30 ff

Table of Contents

Save PDF