8 716 109 711 b 07.10 14/7/10 09:59 Page 1 INSTRUCTION MANUAL INSTALLATION, COMMISSIONING & SERVICING FLOOR STANDING OIL-FIRED CONDENSING BOILER CONVENTIONAL FLUE & ROOM SEALED FLUE GREENSTAR UTILITY 32/50 & 50/70 FOR FULLY PUMPED OPEN VENT OR SEALED CENTRAL HEATING SYSTEMS AND DOMESTIC HOT WATER CYLINDERS THE APPLIANCE IS FOR USE WITH KEROSENE (28 SECOND OIL) ONLY...
Page 2
LABC will then arrange regular inspection visits during the work to ensure that the installation complies with the regulations. Programmer ON DHW only IF YOU ARE IN ANY DOUBT CONTACT THE WORCESTER TECHNICAL HELPLINE. DISTANCE LEARNING AND TRAINING COURSES ARE AVAILABLE FROM WORCESTER. PLEASE LEAVE THESE INSTRUCTIONS WITH THE COMPLETED COMMISSIONING FORM...
Flue manual reset overheat thermostat (+ 0.6°C) °C General Data Maximum hearth temperature °C SEDBUK (Band A) 93.0 92.5 Appliance protection rating Weight (excluding packaging) INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/25 TECHNICAL DATA 8 716 109 711B 07.2010...
Run the boiler and system at normal operating temperature in accordance with the manufacturer's instructions. Drain and thoroughly flush the system to remove the flushing agent and any debris. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/25 CLEANING PRIMARY SYSTEMS 8 716 109 711B 07.2010...
• Any system connected to the boiler must not have a separate electrical supply. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/70 8 716 MAINS SUPPLY 109 711B 07.2010...
The table and illustration above is a guide only and does not in any way override the as the sole fire protection device. de-aerator manufacturers instructions. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 OIL SUPPLY 109 711B 07.2010...
1 ” BSP outlets. • An automatic air vent (N) must be fitted. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/70 8 716 WATER SYSTEMS & PIPEWORK 109 711B 07.2010...
Page 12
Heating return Auto air vent Non return 1000mm above valve the highest point of the system Stop cock Fill Point INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/70 WATER SYSTEMS & PIPEWORK 8 716 109 711B 07.2010...
* Due to changes to BS 5410 and modern 32/50 32/50 building design, these figures no longer 50/70 1073 50/70 incorporate the adventitious ventilation allowance. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 BOILER LOCATION & CLEARANCES 109 711B 07.2010...
In all cases the IEE wiring regulations must be 7 50m m consulted. All pipework in bathrooms and shower rooms must be cross bonded. 2250m m 2250m 600mm radius INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 BOILER LOCATION & CLEARANCES 109 711B 07.2010...
• **Minimum distance of the flue terminal to a facing wall, fence, building or property boundary is 2500mm. Flat roof boundary Pitched roof C, D boundary INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 FLUE TERMINAL POSITIONS 109 711B 07.2010...
A - Boiler B - Flue C - Max. 2 bends at 135° D - Anti down-draught terminal E - Chimney INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 CONVENTIONAL FLUE 109 711B 07.2010...
Remove the bolts securing the boiler to the transport pallet. At all times the correct method for handling heavy objects should be strictly observed. UNPACKING THE BOILER INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 109 711B 07.2010...
Remove and store safely away from the boiler. NOTE: to enable the panels to stand upright, reposition and secure control box (G) to the side panels. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 BOILER INSTALLATION 109 711B 07.2010...
A flue terminal guard must be fitted if the flue outlet is below 2 metres from the ground level. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 FLUE INSTALLATION 109 711B 07.2010...
(D) and tighten gradually in the sequence (1-6) shown until the chamber door is firmly secured, do not over tighten the nuts. FRONT FRONT INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 COMBUSTION CHAMBER 109 711B 07.2010...
(L). IMPORTANT: The condensate trap must be correctly filled to prevent the possibility of potentially harmful flue products escaping via the condensate pipework. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 PIPEWORK CONNECTIONS 109 711B 07.2010...
(J) to secure to the burner air intake box and the burner air intake. Plug burner lead (F) into control box (G). INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 REFITTING COMPONENTS 109 711B 07.2010...
Refit electric control panel cover: Refit cover panel (C) to control box (A) and secure with screws (B). Refit control knob (D). INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 ELECTRICS 109 711B 07.2010...
Page 29
E - HEATING THERMOSTAT (MANUAL RESET). F - CONTROL THERMOSTAT. G - BURNER SOCKET. H - BURNER PLUG. J - BURNER CONTROL BOX. RIELLO CONTROL BOX INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 ELECTRICS 109 711B 07.2010...
Page 30
The junction box (A) must be fitted externally to the boiler. A frost thermostat can also be connected to the remote junction box if required. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 ELECTRICS 109 711B 07.2010...
Complete the installation part of the Guarantee Registration Card, and complete a CD10 or equivalent to inform the LABC of the installation. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 PRE-COMMISSIONING CHECKS- 109 711B 07.2010 APPLIANCE...
There are two venting bosses (A) on the top of the secondary heat exchanger. Only one is used if fluing to the side. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 FILLING THE SYSTEM 109 711B 07.2010...
Refit the sample point cap (L)(hand tighten only, do not over tighten). 249000 240000 2.00 45° S 6.05 7.66 12.0 72.9 INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 STARTING THE APPLIANCE 109 711B 07.2010 RIELLO RDB BURNERS...
Page 36
The burner and circulating pump should be off. 3 Check that any other controls that are fitted to the system are operating properly. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 STARTING THE APPLIANCE 109 711B 07.2010...
Clean or replace all oil filters. Check that the condensate system is not obstructed, clean and refill the condensate trap as necessary. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 INSPECTION AND SERVICE 109 711B 07.2010...
If the filter contains a washable element, thoroughly clean in kerosene and reassemble into the filter. RIELLO RDB OIL PUMP RIELLO RDB OIL PUMP INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 INSPECTION AND SERVICE 109 711B 07.2010...
Remove the paper element from the external oil filter and replace it. If the filter contains a washable element, thoroughly clean in kerosene and reassemble into the filter. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 INSPECTION AND SERVICE 109 711B 07.2010...
Page 42
( B ) and tighten, using the sequence shown, until the chamber door is firmly secured, do not over tighten the nuts. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 INSPECTION AND SERVICE 109 711B 07.2010...
Page 43
213000 205000 1.50 45° S 6.58 12.0 62.5 heat exchanger. 249000 2.00 45° S 6.05 7.66 12.0 72.9 240000 INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 INSPECTION AND SERVICE 109 711B 07.2010...
Set up as in installation instructions Oil pressure incorrect Adjust to correct pressure Incorrect components used on Check with installation instructions combustion head Faulty nozzle Replace nozzle INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 FAULT FINDING 109 711B 07.2010...
Page 47
Rectify burner operation and lockouts operation, numerous lockouts Odour in boiler room, oil leaks Rectify oil leaks, replace components i f from pipework, flexible hoses necessary connections INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 FAULT FINDING 109 711B 07.2010...
Worcester, B osch Group cannot be held responsible for costs incurred by persons not deemed to be competent. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 FAULT FINDING 109 711B 07.2010...
SATRONIC CONTROL BOX correct and complete we cannot guarantee that every eventuality has been covered. Worcester, Bosch Group cannot be held responsible for costs incurred by persons not deemed to be competent. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716 FAULT FINDING 109 711B 07.2010...
It is recommended that the heating system is serviced regularly and that you complete the appropriate Service Interval Record Overleaf. Service Provider. Before completing the appropriate Service Interval Record overleaf, please ensure you have carried out the service as described in this manual. Always use Worcester, Bosch Group specified spare parts.
Page 51
8 716 109 711 b 07.10 14/7/10 09:59 Page 51 SERVICE 2 SERVICE 1 DATE DATE ENGINEER NAME ENGINEER NAME COMPANY NAME COMPANY NAME TEL No. TEL No. OFTEC REG No. OFTEC REG No. PUMP PRESSURE: PUMP PRESSURE: NOZZLE CHANGED? NOZZLE CHANGED? F.G.T.
Page 52
0844 892 9800 TRAINING: 01905 752526 SALES: 01905 752640 WEBSITE: www.worcester-bosch.co.uk Worcester, Bosch Group Cotswold Way, Warndon, Worcester WR4 9SW. Tel. 0844 892 9900 Worcester, Bosch Group is a brand name of Bosch Thermotechnology Ltd. 8 716 109 711B 07.2010...
Need help?
Do you have a question about the GREENSTAR UTILITY 32/50 and is the answer not in the manual?
Questions and answers