Do you have a question about the Cyclone and is the answer not in the manual?
Questions and answers
Jimmy nagle
January 29, 2025
My joule system is not heating my rooms, outside unit does not seem to be working
Mandy Cappuccini
March 13, 2025
Have a cyclone plus direct unvented
2 comments:
Mandy Cappuccini
March 13, 2025
Lukewarm hot water was set on economy setting ?
Mr. Anderson
March 13, 2025
Yes, the Joule Cyclone has a direct unvented option, as indicated by the Joule Cyclone Slimline Direct Unvented Cylinder 125 Litre model mentioned in the context.
Page 2
Pump and Cylinder Badge Under oor Heating Project Ref. on Supplied Schematic Direct Gas Fire Located on Cylinder Cylinder Badge Installer Address Contact Tel. Contact Email Joule Advance Installer I accept the terms and conditions avilable to view on jouleuk’s website...
Table of Contents Introduction General Requirements Direct Technical Speci cation Direct Installation Mechanical Diagram Indirect Technical Speci cation 2 Port Mechanical Diagram 2 Port Electrical Diagram 3 Port Mechanical Diagram 3 Port Electrical Diagram Electronic Controls Discharge Agreement Maintenance Taking The Cylinder Out Of Use Spare Parts Trouble Shooting Guarantee...
These instructions consist of details for instal- lation, servicing, fault nding and replacement of parts for the cylinder purchased. JOULE will not accept any liability in the event of damage for not complying with the guidance in this instruction manual.
Page 5
All current Building Regulations issued by the Department of the Environment, i.e. Approved Document L1 Building Standards (Scotland) (Consolidation) Regulations issued by the Scottish Development Department UK Water Regulations/Byelaws (Scotland) Health & Safety Document No. 635 (The Electricity At Work Regulations 1989) The installation should also be in accordance with the following British Standard Codes of Practice: BS 5449:1990 Forced circulation hot water systems...
Page 6
Consideration should be given to upgrading existing ½” (15mm) cold mains pipe- work to a larger size if the recommended minimum pressure/ ow rate is not being achieved. JOULE recommend that primary pipework used has a minimum diameter of 22mm to ensure low pressure loss.
Page 7
This water heater must be installed in accordance with this advice to be covered by the Joule warranty. This water heater is manufactured to suit the water conditions of most public reticulated water supplies. However, there are some known water chem- istries which can have detrimental e ects on the water heater and its operation and / or life expectancy.
Page 8
If any of the water parameters are higher than set out in the table including Total Hardness regardless of whether or not it is fed from a main water connection a JOULE Wellmaster cylinder must be used.
GENERAL REQUIREMENTS SITING THE UNIT This unit can supply outlets above it or at some distance from it but any outlets above the unit will reduce the available outlet pressure by 0.1 bar for every 1m of height di erence. The maximum length of the “dead leg” should be as stated in the Water Supply (Water Fittings) Regulations 1999 G18.7, in particular to the area of most fre- quent use.
Page 10
Direct & Indirect Make the connection to the cold feed of the cylinder and incorporate a drain valve. Position the inlet control just ABOVE the Temperature & Pressure Relief Valve (TPRV) mounted on the side of the cylinder. This ensures that the cylinder does not have to be drained down in order to service the inlet control set.
Page 11
THERMOSTATIC MIXER When installing a solar system with an unvented JOULE Cyclone twin coil cylinder, a thermostatic mixing valve should be installed. Its function is to act as an anti scald protection.
Page 12
Direct & Indirect UNVENTED KIT COMPONENTS Direct Indirect Inlet Control Group Inlet Control Group Tundish Tundish T & P Valve ( tted) T & P Valve ( tted) 3kW Immersion ( tted) 3kW Immersion ( tted) Expansion Vessel Expansion Vessel Expansion Vessel Hose Expansion Vessel Hose Dual Cylinder Stat...
Page 13
Pipe Size (mm) Maximum Length (m) 10, 12 15, 22 35 and above SYSTEM NOISE Noise in pipework may occur as a result of expansion of pipework over joists or where the pipe has been left touching other pipes or a part of the building structure. Care must be taken to ensure that the pipework is correctly bracketed, is not in tension or compression, and does not carry the weight of components such as a circulation pump.
Direct & Indirect Technical Speci cation Direct 15° 30°...
Page 15
Mechanical Diagram Direct Installation Cold Main Secondary Flow Balanced Cold Connection Secondary Return LEGEND Bronze Pump Non Return Valve (Not Supplied) Inlet Control Group Temperature & Pressure Relief Valve Isolation Valve (Not Supplied) Expansion Vessel With Wall Bracket Two Port Zone Valve Three Port Zone Valve (Not Supplied) Drain Valve (Not Supplied) Tundish...
Page 16
Direct & Indirect 20 Amp Fused Double Pole Isolating Switch 230 V AC - 50Hz 20 Amp Fused Double Pole Isolating Switch 230 V AC - 50Hz FITTING THE IMMERSION HEATER Always check the immersion for signs of leakage before wiring commences. The immersion heater must be completely submerged in water with a minimum of 200mm of water above the top of the immersion.
Page 17
Install the immersion using rigid cable, 2m long max, with 2.5 mm2 cross-section and a temperature resistance of at least 85°C. The Cable should be rubber insulated HOFR sheathed, complying with BS6141 Table 8. It must be fully earthed. Ensure all terminal connections are securely made. Do not however use excessive force when tightening the terminal screws.
Page 18
Disconnect the immersion from the mains electrical supply before removing any covers. Do not attempt to replace the immersion heater(s) with alternatives to those recom- mended by JOULE. Do not bypass the Thermal Cut-Out(s) in any circumstances. REPLACING THE IMMERSION First task is to isolate the power.
Page 19
Technical Speci cation Indirect 15° 30° 30° B C D E F G H I J...
Page 20
Direct & Indirect Mechanical Diagram 2 x Two Port Zone Valves (S-Plan) Variant Dual Thermostat Cold Main Secondary Flow Balanced Cold Connection High Limit Stat Dual Stat Boiler Secondary Return LEGEND Bronze Pump Non Return Valve (Not Supplied) Inlet Control Group Temperature &...
Page 21
Electrical Diagram 2 x Two Port Zone Valves (S-Plan) Variant Dual Thermostat 2 Channel Time Clock High Limit Control CH DHW DHW Zone Valve C 1 2 C 1 2 Standard Boiler Junction Box 5 Amp 230 VAC - 50Hz CH Zone Valve Pump Room Stat...
Page 22
Direct & Indirect Mechanical Diagram Three Port Mid Position Valve (Y-Plan) + Two Port Valve Variant Dual Thermostat Cold Main Secondary Flow Balanced Cold Connection High Limit Stat Dual Stat Boiler Boiler Primary Flow Boiler Secondary Return Flow Return LEGEND Bronze Pump Non Return Valve (Not Supplied) Inlet Control Group...
Page 23
Electrical Diagram Three Port Mid Position Valve (Y-Plan) + Two Port Valve Variant Dual Thermostat 2 Channel Time Clock High Limit Control CH ON OFF C 1 2 C 1 2 DHW Zone Valve Junction Box 5 Amp N PL 230 VAC - 50Hz 3 Port Valve Pump...
85°C ± 3°C. Both thermostats should run in series. To reset the safety cut-out and the motorised valve the reset button must be pressed JOULE cannot be responsible if alternative wiring plans are used. Important: Before resetting the safety cut-out or altering the thermostat setting...
DISCHARGE AGREEMENT DISCHARGE PIPEWORK The inlet control group should be positioned so that the discharge from both safety valves can be combined via a 15mm end feed Tee, as in the diagram below. Connect the tundish and route the discharge pipe which must be routed in accordance with Building regulation - Part G3 of schedule 1.
Page 26
Direct & Indirect EXAMPLES OF ACCEPTABLE DISCHARGEMENT ARRANGEMENTS Ideally below the fixed grating and above the water seal in a trapped gulley. Downward discharges at a low level; i.e. up to 100mm above external surfaces such as car parks, hard standings, grassed areas etc. are acceptable providing that where children play or otherwise come into contact with discharges, a wire cage or similar guard is positioned to prevent contact whilst maintaining visibility.
Page 27
Size of discharge Maximum length of Deduct the gure below from the pipework straight pipe (no bends maximum length for each bend or elbows) or elbow in the discharge pipe Up to 9m 0.8m 28mm Up to 18m 35mm Up to 27m 1.4m Table 4.a - Sizing of copper discharge pipe (D2) for a temperature relief balbe with a G1/2 outlet size (as supplied)
Page 28
Direct & Indirect DISCHARGE ARRANGEMENT FILLING First you must ensure that the pressure in the expansion vessel is the same as the setting of the pressure reducing valve i.e. 3 bar (45PSI). The valve is of the Schrader car tyre type. Check all the connections for water tightness including any factory made connections such as the immersion heater and the temperature and pressure relief valve.
MAINTENANCE GENERAL Servicing should only be carried out by competent installers and any spare parts used must be purchased from JOULE. NEVER bypass any safety devices or operate the unit without them being fully operational. DRAINING Switch the electrical power o (important to avoid damage to element). Isolate boil- er from the unit.
Page 30
Direct & Indirect YOUR GUARANTEE MAY BE VOID IF YOU CANNOT PRODUCE PROOF OF ANNUAL SERVICING IMMERSION HEATER REPLACEMENT If the thermal cut out on the Immersion heater operates contact a competent install- er. If the thermal cut out fault occurs again the immersion will need to be replaced. Prior to installing the replacement Immersion, ensure the o-ring is correctly posi- tioned on the head of the Immersion and lubricate the threads before tting.
We ask you to post the faulty part back to us within one month by recorded delivery. If you do not return the part we will charge you for it and for the postage and packing. If your part fails after the guarantee period, we will ask for upfront payment. LOG BOOK The installer must comply with all of the installation instructions contained within this installation manual.
The discharge may also stop. CALL OUT A COMPETENT PLUMBER TO SERVICE THE UNIT. Tell them you have a fault on an unvented cylinder. We stock all the spare parts they may need and JOULE can be contacted via telephone numbers on back page.
• The Service Log Book has been completed after each annual service. • The warranty card is lled in and a copy is sent by email to warranty@joule.ie EXCLUSIONS The guarantee does not cover cylinders a ected by the following;...
Page 35
3 month inspection. • Maximum interval between anode inspections is 12 months. • The warranty card is lled in and a copy is sent by email to warranty@joule.ie EXCLUSIONS The guarantee does not cover cylinders a ected by the following; •...
Page 36
Direct & Indirect MAINS PRESSURE HOT WATER STORAGE SYSTEM COMMISSIONING CHECKLIST This Comissioning Checklist is to be completed in full by the competent person who commised the storage system as a means of demonstrating compliance with the appropriate building regulations and then handed to the customer to keep for future reference. Failure to install and commission this equipment to the manufacturer’s instructions may invali- date the warranty but does not a ect statutory rights.
Page 37
ALL SYSTEMS PRIMARY SETTINGS (indirect heating only) Is the primary circuit a sealed or open vented system? What is the maximum primary ow temperature? °C UNVENTED SYSTEMS ONLY Where is the pressure reducing valve situated (if tted) ? What is the pressure reducing valve setting? Has a combinded temperature and pressure releif balve and expansion valve been tted and discharge tested? The tundish and the discharge pipework have been connected and terminated to Part G of the...
Page 38
Direct & Indirect SYSTEM RECORD It is recommended that your hot water system is serviced regularly and that the appropriate Service Record is completed. SERVICE 1 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 2 Date Engineer Name Company Name Telephone Number Comments...
Page 39
SERVICE PROVIDER Before completing the appropriate Service Record below, please ensure you have carried out the service as described in the manufacturer’s instructions SERVICE 5 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 6 Date Engineer Name Company Name Telephone Number Comments Signature...
Page 40
Direct & Indirect JOULE IE mail Kylemore Park West, Ballyfermot, Dublin 10 +353 (1) 623 7080 +353 (1) 626 9337 info@joule.ie www.joule.ie JOULE UK mail Unit 17C&D Power Road, Plantation Bus. Pk. Bromborough, Wirral, CH62 3RN +44 (0) 1513 551 094 +44 (0) 1513 568 336 info@jouleuk.co.uk...
Need help?
Do you have a question about the Cyclone and is the answer not in the manual?
Questions and answers
My joule system is not heating my rooms, outside unit does not seem to be working
Have a cyclone plus direct unvented
Lukewarm hot water was set on economy setting ?
Yes, the Joule Cyclone has a direct unvented option, as indicated by the Joule Cyclone Slimline Direct Unvented Cylinder 125 Litre model mentioned in the context.
This answer is automatically generated