Required Tools Or Items - Sharp JH-3500U Installation & Operator's Manual

Grid - interactive 1-phase inverter for photovoltaic system
Table of Contents

Advertisement

Required tools or items

Besides the supplied items on the previous page, the following tools or items are necessary.
Tools:
• Measuring tape
• Screw drivers
• Electric driver
• Nipper
• Hammer
• Pliers
• Wire strippers
• Utility knife
• Socket wrench and fittings
• Torque wrench
• Open-end wrench
• Electric drill
• Drill bits
• Cord reel
• Ladder (if necessary)
• Stepladder
• Low-voltage gloves
• Helmet
• Waste cloth
• Pencil or pen
• Cable tie
• Insulating tape
• Sealing putty
• Multimeter
• Frequency counter
• Ground tester
• Level
• Calculator
Items:
• Grounding wire (AWG 10)
• Wiring cable
• Conduit pipe
• Conduit hubs
• AC disconnect
• DC disconnect
7
(longer than 1 m)
Phillips and Flat-head
Torque: 0.78~3.4 N.m
∅6mm, 7mm, 8.5mm
Max usable DC voltage: more than 400V
(refer to page 13)
(3/4")
(For 3/4" holes, Liquidtight and wet-location hubs that comply with
the requirements of UL 514B)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents